Orange Line (Lahore Metro)

Source 📝

1424: 1160: 1018: 1026: 1007: 31: 647: 1265: 1247: 902: 1480: 1063: 613: 542: 1055: 1427: 1426: 1431: 1430: 1425: 1092: 1432: 827: 292: 577: 807: 787: 767: 745: 723: 703: 681: 661: 633: 591: 564: 520: 498: 478: 458: 438: 416: 394: 374: 354: 334: 312: 3462: 1429: 3340: 1203: 1103:. Mainline track is capable of supporting 60 kg/m, while track in the depot and storage yards is capable of supporting 50 kg/m. Track was laid upon a monolithic concrete track bed, with crossovers located between every 2 to 3 stations. Double turnover tracks are used at each terminus for turnaround. Track is 1187:. The track does not run in the GT Road's median near Shalamar Station - it instead turns and travels along the southern edge of the GT Road in order to bypass the garden in order to prevent damage to mature trees there. Traveling west from Shalamar Station, the track returns to the median of GT Road, with stops at 1459:
In November 2016, the Punjab Provincial Development Working Party approved an additional 391 million rupees towards construction of the Orange Line. In January 2017, the Government of Punjab was awarded 20 billion rupees' worth of tax exemptions to help control costs for the project. Also in January
1292:
Station. The line continues along Multan Road's edge until Awan Road Station, after which it reverts to Multan Road's median. Leaving Awan Road Station, the line continues to travel southwest along Multan Road until it reaches Wahdat Road Station, which lies 2.85 km to the southwest of Sabzazar
1078:
lighting. Each car has a nominal capacity of 200 seated and standing passengers at an average density of 5 persons per square metre with 20% of passengers seated and 80% standing. A total of 27 trains with 135 cars have been ordered for the system, at a cost of $ 1 billion. A total of 54 trains are
1041:
Anarkali and GPO Stations were initially planned to have two underground levels, Anarkali Station now both feature a ground-level concourse with one underground level, while GPO Station has a single underground level, in order reduce the maximum gradient for trains from 3.5% to 3.0%. Rail tracks are
1354:
The system's busiest station is projected to Anarkali Station with an estimated 450 daily trips in the first year of operations, rising to 110,000 trips in 2025. Lakshmi Chowk is expected to be the second busiest station in the first year of operations with 23,200 trips, and 41,500 in 2025. Lahore
1350:
The system is designed to handle 30,000 passengers per hour. The Orange Line initially carried 5,000 passengers per day, with ridership of 5000 passengers per day three years after commencement of service. The system is designed to operate with a minimum headway of two minutes. It is expected that
1127:
The line spans 27.1 km (16.8 mi). 1.72 km (1.1 mi) of the line is underground, while transition zones between underground and elevated portions covers 0.7 km (0.4 mi). The remaining track is elevated. The maximum gradient for the track's main-line is 3.0%, while the
1037:
and GPO stations are underground, while the remaining 24 are elevated. The rail line runs through the centre of each station, with platforms flanking the track. Elevated stations have a width of 22.5 metres, while Anarkali Station is 16 metres wide, and GPO Station is 49.5 metres wide. Elevated
1363:
The maximum speed of the trains is 80 km/h (50 mph). Riders will be served by 26 stations, two of which will be underground stations. The total ride time from one end of the system to the other is estimated to be 45 minutes, compared to the current commute time of more than 1 hour.
1780:
The court in its verdict on August 19 ordered the government to stop all construction work of the project within 200 feet of eleven historical buildings and ordered the formation of a review committee to assess the effects of the construction at these historical sites. The eleven sites are
1502:
Various people and organizations have raised concerns that the Lahore Metro Orange Line might be a possible threat to heritage sites in this historic city. On 19 August 2016, the Lahore High Court ordered the cessation of construction works located within 200 feet of 11 historical sites.
1045:
Underground stations feature automated doors between platforms and trains. Public areas of the station are air conditioned during warm months. Elevated stations feature natural ventilation throughout the platforms, with localised air conditioning in public areas of the ticket-hall level.
1428: 1470:
Fare of Orange Line is Rs. 25-45 per trip per person depending on travel distance, while Rs.25 for travel up to 4km, Rs.30 for travel up to 8 km, Rs. 35 for travel up to 12 km, Rs.40 for travel up to 16 km and Rs.45 for travel up to the terminus station.
1222:
Leaving Lakshmi Chowk, the line travels southwest along McLeod Road, and descends into the 1.15 km underground portion that leads to the first underground station in the system, the GPO Station. GPO Station is located at the intersection of
1119:, while a stabling yard was constructed at the line's southern terminus at Ali Town. The depot is also the site of the Orange Line's central control centre. The depot and stabling yard respectively required 0.56 and 0.49 kilometres of track. 1781:
Chauburji, Saint Andrew Church, GPO building, the tomb of Zeb-un-Nisa, Supreme Court Registry Branch, Aiwan-e-Auqaf, Shalimar Gardens, Budhu ka Awa, the tomb of Baba Mauj Daria, Lakshmi Building, and Shah Chiragh Building.
944:. The line spans 27.1 km (16.8 mi) with 25.4 km (15.8 mi) elevated and 1.72 km (1.1 mi) underground. The line is served by 26 stations and is expected to handle 250,000 passengers daily. 1235:. From GPO Station, the line continues from McLeod Road and travels under Allah Baksh Road before turning south where the second underground station, Anarkali, is located. Connections from the Orange Line to the 1624:
As per the direction of the apex court, he said, the civil works of the project will be completed by end of July 2019. But the project will not enter into commercial operations by August or November 2019.
1341:
for the first 8 years after the project's completion. Infrastructure for the line has an expected life span of approximately 100 years with routine maintenance. The official in charge is Sibtain Halim.
960:
agreed to provide a soft loan of $ 1.55 billion for the project. Construction works on the project began in October 2015. Habib Construction Services was awarded the first phase in October 2015 for
1456:(CPEC), the project is financed separately from CPEC, and is being undertaken by the Government of Punjab. These loans will be paid back by Punjab Government in installments over a 20-year period. 2649: 1403:
On February 25, 2020, the contract of operation and maintenance of Lahore Metro Orange Line was signed between the Punjab provincial transport authority and a set of firms including
1288:, Bund Road, Salahudin Road, and Khatam-e-Nabuwat. From Khatam-e-Nabuwat, the line shifts from Multan Road's median and travels along the road's southern/eastern side with a stop at 1514:
and showed reluctance to complete it. The 2019-2020 budget of Punjab has allocated a low amount of funds for the project which will slow the pace of development of the metro.
2112: 2913: 1499:
was reported to have offered to finance a comparable underground transit system at a lower cost of borrowing, but with longer construction times and higher overall cost.
2711:
FINANCING PLUS ENGINEERING, PROCUREMENT AND CONSTRUCTION OF METRO RAIL TRANSIT SYSTEM ON OF THE ORANGE LINE IN LAHORE (PHASE-I FROM ALI TOWN TO LAHORE RAILWAY STATION)
1517:
As per a report, over 100 on-site deaths and injuries were reported during the construction of the Orange Line due to lack of occupational health and safety standards.
2679: 2616: 2581: 2549: 2517: 2485: 2453: 2421: 2380: 2348: 2316: 2284: 2170: 2138: 2041: 2009: 1977: 1689: 929: 1074:, and automated and driverless. A standard Chinese "Type B" train-set consisting of 5 cars with 4 doors each used, that has a stainless steel body and illuminated by 731: 641: 550: 1440:
The 27-kilometre metro train is expected to cost 22.51billion Rupees($ 1.65 Bn ), out of which 48% of funds 14.47 billion Rupees($ 800 million) coming from the
3323: 599: 1467:
The cost of land acquisition for the Orange line is Rs. 13.80 billion and is additional to the above cost and is being borne by the Government of Punjab.
1355:
Junction Railway Station is expected to be the third busiest station within the line's first year of operation with 17,500 trips, rising to 4400 in 2025.
1179:
Station. From Dera Gujran Station in northeast Lahore, the route travels 5.5 kilometres westward with stations at Islam Park, Salamatpura, Mahmood Booti,
975:
and Ali Town at a cost of 2000.39 billion rupees. On 12 January 2017, 7 labourers perished at a makeshift residence for Orange Line construction workers.
1460:
2017, the Lahore Development Authority noted that it would require an additional 2 billion rupees in order to better integrate the Orange Line with the
1199:. From there, it travels southwest along McLeod road towards Lakshmi Chowk Station. The total distance from Sultanpura to Lakshmi Chowk is 2.5 km. 2659: 2869: 1664: 1384:
of electricity to power the trains, as well as the system's stations. 80 MWs of electricity have been secured for the project's operations from the
1192: 1140: 1351:
the station will serve 520 passengers per hour in the Orange Line's first year of operations - a figure which is expected to rise to 550 by 2025.
1163:
Lakshmi Station is named after the historic Lakshmi Building, which in turn was named in honour of the Hindu goddess of fortune and prosperity,
3504: 3013: 1652:
Latest technology will be employed for fabricating these trains and the rolling-stock will be fully computerised, automatic and driverless.
880: 1395:
built for the line - one near UET Station, and the other at Khatam-e-Nabuwat Station. The project also included 16 traction substations.
3051: 1767: 1388:. The system has a back-up unit in case of power failure, while a third emergency system also available to if both power sources fail. 3038: 2935: 1510:
in favour of the metro. After the election, work on the metro slowed down because a minister of the Government of Punjab termed it a
3519: 3316: 1577: 2891: 2773: 1909: 1135:, McLeod Road, Lake Road, Multan Road and Raiwind Road. The Orange Line connects several important nodes in Lahore, including the 2921: 1863: 3116: 2207: 1639: 956:
between the governments of Pakistan and China in May 2014. Financing for the project was secured in December 2015 when China's
2821: 1595: 3514: 2710: 2686: 2623: 2588: 2556: 2524: 2492: 2460: 2428: 2387: 2355: 2323: 2291: 2177: 2145: 2048: 2016: 1984: 1696: 3448: 3309: 2240: 2799: 1280:
the line continues 4.5 km towards the southwest, along the median of Multan Road. Elevated stations are located at
3351: 2664:
Sibtain Halim, Pakistan's official in charge of the Orange Line, says no other countries expressed interest in bidding.
1744: 1215: 1453: 873: 2847: 3205: 2723: 1793: 1314: 1269: 1196: 1144: 1038:
stations are all 102 metres long, while Anarkali and GPO Stations are 121.5 and 161.6 metres long, respectively.
3375: 1441: 1385: 1483:
Advocates charge that construction works threaten numerous heritage sites in Lahore, such as the 17th century
1293:
Station. The line 5.2 kilometres along Multan and Raiwind Roads, with stops at Hanjarwal Station, Canal View,
3290: 1531: 1171:
From Orange Line's northeastern terminus at Dera Gujran, the track is elevated and runs in the median of the
933: 132: 2078: 1945: 1837: 273: 3509: 3197: 1239:
will be available via an underground walkway in future. From Anarkali Station, the route continues under
1228: 953: 866: 3478: 3380: 3109: 1100: 1507: 3483: 3220: 1541: 1184: 1176: 1136: 1608: 2654: 1071: 1034: 1010: 976: 572: 227: 1202: 3364: 1913: 1496: 3102: 2748: 1551: 1392: 982:
Testing and trial runs began in March 2018. In May 2018, Punjab Chief Minister of the time
97: 1159: 8: 1612: 1449: 1372:
The Orange Line is operational for 15 hours 45 minutes per day, between 06:15 and 22:00.
1240: 1042:
9.7m below street level at GPO Station, and 8.7m below street level at Anarkali Station.
990: 1017: 3414: 2936:"Orange Line hearing: Govt told to present metro train agreement - The Express Tribune" 1131:
The alignment roughly parallels several of Lahore's major thoroughfares, including the
957: 2086:
EIA of Construction of Lahore Orange Line Metro Train Project (Ali Town –Dera Gujran)
1953:
EIA of Construction of Lahore Orange Line Metro Train Project (Ali Town –Dera Gujran)
1546: 1232: 1025: 1006: 989:
On 25 October 2020, Orange Line Train was inaugurated by then Chief Minister Punjab
30: 3146: 2870:"Govt approves Rs20 billion tax exemptions for Orange Line Metro project in Lahore" 2774:"Infrastructure project: First tranche of OLMT loan released - The Express Tribune" 1725: 1526: 1492: 1294: 1224: 1172: 1132: 1116: 1115:
A depot was constructed at the northeast portion of the line, directly east of the
921: 320: 58: 1495:
groups have been critical of the environmental sustainability of the project. The
3404: 3343: 3285: 1582: 1536: 1461: 1404: 1330: 1306: 1236: 1211: 1207: 1195:, and Sultanpura. From Sultanpura, the line then travel towards Lahore's central 576: 3184: 2822:"China financing Orange Line Metro Train: Shahbaz Sharif - The Express Tribune" 1511: 1412: 1338: 1318: 1285: 1281: 1104: 983: 528: 239: 219: 986:
was present at the first test run of Lahore's Orange Line Metro Train (OLMT).
967:(US$ 74 million). In October 2016, Phase 2 of the project was awarded to 3498: 3301: 3225: 3014:"'Metro train will change country's transport culture' - The Express Tribune" 1180: 941: 913: 753: 112: 1264: 1246: 1070:
Orange Line trains are each composed of five wagons manufactured by China's
3465: 3399: 3125: 1665:"Railways secretary reviews operation for Karachi Circular Railway revival" 1556: 937: 122: 1479: 1062: 901: 3409: 3215: 1506:
After 22 months, construction work resumed following a judgment from the
1310: 1188: 191: 1491:
The project has been subject to criticism regarding transparency, while
1099:
The Orange Line's tracks meet China's national standards, and employing
3440: 3210: 1257:
It then emerges along Lake Road and again travels above ground towards
1080: 689: 232: 1054: 3189: 3179: 3160: 1484: 1445: 1277: 1258: 1250: 1148: 972: 506: 402: 3074: 1888: 1452:. Though the project is frequently mentioned as a part of the wider 1091: 1079:
expected to be in service by 2025. The trains powered by a 750-volt
3165: 2988: 2962: 2262: 1815: 1720: 1381: 1289: 925: 424: 62: 3461: 1816:"Seven workers hired for Orange Line Train project perish in fire" 1408: 1334: 1164: 1578:"Good news on track: Lahore to get Pakistan’s first metro train" 979:
rolled out the first of 27 trains for the metro on 16 May 2017.
3394: 3094: 1838:"First Orange Line Metro train rolls out - The Express Tribune" 1721:"Pakistan, China sign pact on Lahore Orange Line metro project" 917: 54: 2963:"'Environmental and economic sustainability' of CPEC assured" 2914:"Land Acquisition for Lahore Orange Line Metro Train Project" 2650:"China's Global Building Spree Runs Into Trouble in Pakistan" 3339: 236: 3052:"Court orders violated in Orange Line Metro Train project" 1768:"Court orders violated in Orange Line Metro Train project" 1268:
The Orange Line will include connections to the historic
1075: 1596:
Development agenda: Lahore metro train gets green signal
98:
https://pma.punjab.gov.pk/orange-line-metro-train-system
2235: 2233: 2231: 2229: 2227: 2225: 2208:"Manufacturing of orange trains starts, says Kh Hassan" 1864:"Orange Line Metro train runs on trial basis in Lahore" 1640:"Manufacturing of orange trains starts, says Kh Hassan" 2892:"If well-connected, Orange Line will cost Rs200b more" 2674: 2672: 1910:
CM Buzdar inaugurates Lahore Orange Line Train project
1128:
minimum turning radius on the mainline is 250 metres.
2611: 2609: 2416: 2414: 2412: 2410: 2408: 1972: 1970: 1889:"Lahore's Orange Line Metro Train conducts trial run" 968: 2222: 2088:. Environmental Protection Department. pp. 3–10 1729:, Lahore, 22 Mar 2014. Retrieved on 20 October 2014. 1586:, Lahore, 23 Mar 2014. Retrieved on 20 October 2014. 1206:
Passengers from the Orange Line will be able to use
2989:"'Conditional' approval of Orange Line project EIA" 2669: 2606: 2405: 1967: 1747:. International Railway Journal. December 23, 2015 1329:The Orange Line is operated by a joint venture of 1313:Station of the Metrobus. The line connects to the 1739: 1737: 1735: 1107:at 1435mm. Fasteners between tracks are elastic. 3496: 2724:"City to lose 66620 trees for Orange Line train" 1745:"China signs funding agreement for Lahore metro" 1634: 1632: 1573: 1571: 268: 1794:"Contract for Orange Line Package-2 re-awarded" 1436:A Short Clip of Lahore Metro from Chinese Media 3331: 1732: 3317: 3110: 2792: 2107: 2105: 2103: 1629: 1568: 1309:from Anarkali Station of the Orange Line, to 874: 2241:"27 trains to be acquired for Metro project" 1606: 2648:Page, Jeremy; Shah, Saeed (July 22, 2018). 2290:. January 2016. p. 143. Archived from 1029:Certain Orange Line station from the inside 3324: 3310: 3117: 3103: 2685:. January 2016. p. 75. Archived from 2587:. January 2016. p. 67. Archived from 2555:. January 2016. p. 64. Archived from 2523:. January 2016. p. 62. Archived from 2491:. January 2016. p. 46. Archived from 2459:. January 2016. p. 12. Archived from 2386:. January 2016. p. 33. Archived from 2354:. January 2016. p. 28. Archived from 2322:. January 2016. p. 27. Archived from 2176:. January 2016. p. 35. Archived from 2144:. January 2016. p. 36. Archived from 2100: 2073: 2071: 2069: 2047:. January 2016. p. 69. Archived from 1940: 1938: 1936: 1934: 1932: 1930: 1928: 1926: 1924: 1695:. January 2016. p. 12. Archived from 881: 867: 2622:. January 2016. p. 4. Archived from 2015:. January 2016. p. 9. Archived from 1983:. January 2016. p. 7. Archived from 1684: 1682: 2647: 2202: 2200: 2198: 2079:"SECTION - 3 DESCRIPTION OF THE PROJECT" 1946:"SECTION - 3 DESCRIPTION OF THE PROJECT" 1478: 1422: 1263: 1245: 1201: 1193:University of Engineering and Technology 1158: 1141:University of Engineering and Technology 1090: 1061: 1053: 1024: 1016: 1005: 952:The project was initiated with a signed 900: 2986: 2848:"Another Rs391m okayed for Orange Line" 2800:"Orange Line not part of CPEC: NA body" 2721: 2066: 1921: 3497: 2960: 1679: 1345: 1321:to the Orange Line's Railway Station. 1227:and McLeod Road, in front of Lahore's 940:system. The line is Pakistan's first 3305: 3098: 3072: 2195: 1955:. Environmental Protection Department 1398: 1380:The system required approximately 20 1367: 3049: 1903: 1765: 1609:"OLMT project to face further delay" 1253:perpendicular to Orange line tracks. 1013:is one of the 2 underground stations 3039:News Report about Heritage Concerns 2850:. Express Tribune. November 5, 2016 1444:, the rest 52% is financed through 932:in Pakistan. It is operated by the 13: 3073:Hisam, Zeenat (January 24, 2019). 2263:"Orange train to run on 750 volts" 2243:. Pakistan Today. February 5, 2016 1375: 1297:, before terminating at Ali Town. 14: 3531: 2987:Hasnain, Khalid (July 27, 2015). 2722:Hasnain, Khalid (June 26, 2015). 612: 541: 3505:China–Pakistan Economic Corridor 3460: 3338: 3124: 2894:. Express Tribune. June 22, 2017 1454:China Pakistan Economic Corridor 1305:The Orange line connects to the 1049: 825: 805: 785: 765: 743: 721: 701: 679: 659: 645: 631: 611: 589: 575: 562: 540: 518: 496: 476: 456: 436: 414: 392: 372: 352: 332: 310: 290: 29: 3520:2020 establishments in Pakistan 3066: 3043: 3032: 3006: 2980: 2954: 2928: 2906: 2884: 2862: 2840: 2814: 2766: 2741: 2715: 2704: 2641: 2574: 2542: 2510: 2478: 2446: 2373: 2341: 2309: 2277: 2255: 2163: 2131: 2034: 2002: 1881: 1856: 1830: 1808: 1786: 826: 291: 89:26 (24 elevated, 2 underground) 2961:Shahid, Jamal (June 8, 2015). 2802:. The Nation. January 17, 2017 2427:. January 2016. Archived from 1759: 1714: 1667:. Tribune.com.pk. May 28, 2019 1657: 1607:Adnan, Imran (April 1, 2019). 1600: 1589: 1442:Federal Government of Pakistan 1386:Lahore Electric Supply Company 1300: 969:ZKB Engineers and Constructors 1: 3291:Punjab Mass Transit Authority 1562: 1532:Rawalpindi-Islamabad Metrobus 1324: 1095:Locomotive on elevated tracks 934:Punjab Mass Transit Authority 806: 786: 766: 744: 722: 702: 680: 660: 632: 590: 563: 519: 497: 477: 457: 437: 415: 393: 373: 353: 333: 311: 133:Punjab Mass Transit Authority 3515:Railway lines opened in 2020 2680:"Norinco Technical Proposal" 2617:"Norinco Technical Proposal" 2582:"Norinco Technical Proposal" 2550:"Norinco Technical Proposal" 2518:"Norinco Technical Proposal" 2486:"Norinco Technical Proposal" 2454:"Norinco Technical Proposal" 2422:"Norinco Technical Proposal" 2381:"Norinco Technical Proposal" 2349:"Norinco Technical Proposal" 2317:"Norinco Technical Proposal" 2285:"Norinco Technical Proposal" 2171:"Norinco Technical Proposal" 2139:"Norinco Technical Proposal" 2042:"Norinco Technical Proposal" 2010:"Norinco Technical Proposal" 1978:"Norinco Technical Proposal" 1690:"Norinco Technical Proposal" 1474: 1122: 7: 1796:. Tribune. October 31, 2016 1520: 1210:Station to transfer to the 1145:Lahore's main train station 1001: 954:memorandum of understanding 178:27.1 km (16.8 mi) 10: 3536: 3332:Public transport in Lahore 1418: 1033:The line has 26 stations. 947: 249:80 km/h (50 mph) 186:Elevated & underground 3459: 3337: 3278: 3262: 3246: 3132: 1508:Supreme Court of Pakistan 996: 834: 819: 814: 799: 794: 779: 774: 759: 752: 737: 730: 715: 710: 695: 688: 673: 668: 653: 640: 625: 620: 605: 598: 583: 571: 556: 549: 534: 527: 512: 505: 490: 485: 470: 465: 450: 445: 430: 423: 408: 401: 386: 381: 366: 361: 346: 341: 326: 319: 304: 299: 284: 253: 245: 226: 190: 182: 174: 169: 151: 146: 138: 128: 118: 108: 103: 93: 85: 68: 50: 42: 37: 28: 23: 2265:. Dawn. January 18, 2016 2210:. The News. May 26, 2016 1818:. Dawn. January 12, 2017 1642:. The News. May 26, 2016 1542:Karachi Circular Railway 1464:where they interchange. 1358: 1197:Junction Railway Station 1154: 1110: 1101:jointless track circuits 1086: 971:for civil works between 3206:Lahore Junction Station 2872:. Dawn. January 7, 2017 2655:The Wall Street Journal 1072:CRRC Zhuzhou Locomotive 977:CRRC Zhuzhou Locomotive 3075:"Dock workers' rights" 1914:The News International 1497:Asian Development Bank 1488: 1437: 1393:electrical substations 1315:Lahore Railway Station 1273: 1270:Lahore Railway Station 1254: 1219: 1168: 1151:Square, and Ali Town. 1096: 1067: 1059: 1030: 1022: 1014: 936:and forms part of the 906: 3050:Randhawa, Samiullah. 1766:Randhawa, Samiullah. 1552:Transport in Pakistan 1482: 1435: 1409:NORINCO International 1331:Guangzhou Metro Group 1267: 1249: 1205: 1162: 1094: 1065: 1057: 1028: 1020: 1009: 904: 157:; 3 years ago 3239:Dera Gujran Terminal 2924:on October 25, 2017. 1918:Retrieved 2022-08-03 1891:. Dawn. May 18, 2017 155:25 October 2020 78:Dera Gujran Terminal 3018:The Express Tribune 2940:The Express Tribune 2826:The Express Tribune 2778:The Express Tribune 2692:on February 2, 2017 2629:on February 2, 2017 2594:on February 2, 2017 2562:on February 2, 2017 2530:on February 2, 2017 2498:on February 2, 2017 2466:on February 2, 2017 2434:on February 2, 2017 2393:on February 2, 2017 2361:on February 2, 2017 2329:on February 2, 2017 2297:on February 2, 2017 2183:on February 2, 2017 2151:on February 2, 2017 2054:on February 2, 2017 2022:on February 2, 2017 1990:on February 2, 2017 1842:The Express Tribune 1702:on February 2, 2017 1613:The Express Tribune 1450:Government of China 1346:Projected ridership 1229:General Post Office 1021:Wahdat Road Station 991:Sardar Usman Buzdar 3510:Lahore Metro lines 2749:"巴基斯坦首条地铁将由广州地铁运营" 2662:on July 22, 2018. 1868:www.thenews.com.pk 1489: 1438: 1399:Operation entities 1368:Hours of operation 1337:International and 1274: 1255: 1243:and Lytton Road. 1220: 1169: 1097: 1068: 1066:Train at a station 1060: 1031: 1023: 1015: 907: 3492: 3491: 3428:Chungi Amar Sidhu 3376:Civil Secretariat 3299: 3298: 3143:Ali Town Terminal 1547:Pakistan Railways 1433: 1391:Two high-voltage 1233:Lahore High Court 899: 898: 895: 894: 891: 890: 855: 854: 446:Khatam-e-Nabuwat 75:Ali Town Terminal 16:Lahore Metro line 3527: 3464: 3342: 3326: 3319: 3312: 3303: 3302: 3265: 3249: 3221:Shalimar Gardens 3147:Thokar Niaz Baig 3136: 3119: 3112: 3105: 3096: 3095: 3090: 3089: 3087: 3085: 3070: 3064: 3063: 3061: 3059: 3054:. Pakistan Today 3047: 3041: 3036: 3030: 3029: 3027: 3025: 3020:. April 25, 2016 3010: 3004: 3003: 3001: 2999: 2984: 2978: 2977: 2975: 2973: 2958: 2952: 2951: 2949: 2947: 2932: 2926: 2925: 2920:. Archived from 2910: 2904: 2903: 2901: 2899: 2888: 2882: 2881: 2879: 2877: 2866: 2860: 2859: 2857: 2855: 2844: 2838: 2837: 2835: 2833: 2818: 2812: 2811: 2809: 2807: 2796: 2790: 2789: 2787: 2785: 2770: 2764: 2763: 2761: 2759: 2745: 2739: 2738: 2736: 2734: 2719: 2713: 2708: 2702: 2701: 2699: 2697: 2691: 2684: 2676: 2667: 2666: 2658:. Archived from 2645: 2639: 2638: 2636: 2634: 2628: 2621: 2613: 2604: 2603: 2601: 2599: 2593: 2586: 2578: 2572: 2571: 2569: 2567: 2561: 2554: 2546: 2540: 2539: 2537: 2535: 2529: 2522: 2514: 2508: 2507: 2505: 2503: 2497: 2490: 2482: 2476: 2475: 2473: 2471: 2465: 2458: 2450: 2444: 2443: 2441: 2439: 2433: 2426: 2418: 2403: 2402: 2400: 2398: 2392: 2385: 2377: 2371: 2370: 2368: 2366: 2360: 2353: 2345: 2339: 2338: 2336: 2334: 2328: 2321: 2313: 2307: 2306: 2304: 2302: 2296: 2289: 2281: 2275: 2274: 2272: 2270: 2259: 2253: 2252: 2250: 2248: 2237: 2220: 2219: 2217: 2215: 2204: 2193: 2192: 2190: 2188: 2182: 2175: 2167: 2161: 2160: 2158: 2156: 2150: 2143: 2135: 2129: 2128: 2126: 2124: 2119:. March 17, 2016 2109: 2098: 2097: 2095: 2093: 2083: 2075: 2064: 2063: 2061: 2059: 2053: 2046: 2038: 2032: 2031: 2029: 2027: 2021: 2014: 2006: 2000: 1999: 1997: 1995: 1989: 1982: 1974: 1965: 1964: 1962: 1960: 1950: 1942: 1919: 1907: 1901: 1900: 1898: 1896: 1885: 1879: 1878: 1876: 1874: 1860: 1854: 1853: 1851: 1849: 1834: 1828: 1827: 1825: 1823: 1812: 1806: 1805: 1803: 1801: 1790: 1784: 1783: 1777: 1775: 1770:. Pakistan Today 1763: 1757: 1756: 1754: 1752: 1741: 1730: 1718: 1712: 1711: 1709: 1707: 1701: 1694: 1686: 1677: 1676: 1674: 1672: 1661: 1655: 1654: 1649: 1647: 1636: 1627: 1626: 1621: 1619: 1604: 1598: 1593: 1587: 1575: 1527:Lahore Metro Bus 1434: 1295:Thokar Niaz Baig 1185:Shalamar Gardens 1137:Shalamar Gardens 1133:Grand Trunk Road 1117:Lahore Ring Road 966: 964: 930:driverless metro 912:is an automated 883: 876: 869: 863: 829: 828: 809: 808: 789: 788: 769: 768: 747: 746: 725: 724: 705: 704: 683: 682: 663: 662: 649: 648: 635: 634: 615: 614: 593: 592: 579: 566: 565: 544: 543: 522: 521: 500: 499: 480: 479: 460: 459: 440: 439: 418: 417: 396: 395: 376: 375: 356: 355: 336: 335: 321:Thokar Niaz Baig 314: 313: 294: 293: 282: 281: 269: 255: 254: 222: 216: 214: 213: 209: 206: 198: 165: 163: 158: 142:27 5-cars trains 33: 21: 20: 3535: 3534: 3530: 3529: 3528: 3526: 3525: 3524: 3495: 3494: 3493: 3488: 3455: 3405:Qaddafi Stadium 3333: 3330: 3300: 3295: 3286:Lahore Metrobus 3274: 3263: 3258: 3247: 3242: 3134: 3128: 3123: 3093: 3083: 3081: 3071: 3067: 3057: 3055: 3048: 3044: 3037: 3033: 3023: 3021: 3012: 3011: 3007: 2997: 2995: 2985: 2981: 2971: 2969: 2959: 2955: 2945: 2943: 2934: 2933: 2929: 2912: 2911: 2907: 2897: 2895: 2890: 2889: 2885: 2875: 2873: 2868: 2867: 2863: 2853: 2851: 2846: 2845: 2841: 2831: 2829: 2828:. April 9, 2016 2820: 2819: 2815: 2805: 2803: 2798: 2797: 2793: 2783: 2781: 2772: 2771: 2767: 2757: 2755: 2747: 2746: 2742: 2732: 2730: 2720: 2716: 2709: 2705: 2695: 2693: 2689: 2682: 2678: 2677: 2670: 2646: 2642: 2632: 2630: 2626: 2619: 2615: 2614: 2607: 2597: 2595: 2591: 2584: 2580: 2579: 2575: 2565: 2563: 2559: 2552: 2548: 2547: 2543: 2533: 2531: 2527: 2520: 2516: 2515: 2511: 2501: 2499: 2495: 2488: 2484: 2483: 2479: 2469: 2467: 2463: 2456: 2452: 2451: 2447: 2437: 2435: 2431: 2424: 2420: 2419: 2406: 2396: 2394: 2390: 2383: 2379: 2378: 2374: 2364: 2362: 2358: 2351: 2347: 2346: 2342: 2332: 2330: 2326: 2319: 2315: 2314: 2310: 2300: 2298: 2294: 2287: 2283: 2282: 2278: 2268: 2266: 2261: 2260: 2256: 2246: 2244: 2239: 2238: 2223: 2213: 2211: 2206: 2205: 2196: 2186: 2184: 2180: 2173: 2169: 2168: 2164: 2154: 2152: 2148: 2141: 2137: 2136: 2132: 2122: 2120: 2111: 2110: 2101: 2091: 2089: 2081: 2077: 2076: 2067: 2057: 2055: 2051: 2044: 2040: 2039: 2035: 2025: 2023: 2019: 2012: 2008: 2007: 2003: 1993: 1991: 1987: 1980: 1976: 1975: 1968: 1958: 1956: 1948: 1944: 1943: 1922: 1908: 1904: 1894: 1892: 1887: 1886: 1882: 1872: 1870: 1862: 1861: 1857: 1847: 1845: 1836: 1835: 1831: 1821: 1819: 1814: 1813: 1809: 1799: 1797: 1792: 1791: 1787: 1773: 1771: 1764: 1760: 1750: 1748: 1743: 1742: 1733: 1719: 1715: 1705: 1703: 1699: 1692: 1688: 1687: 1680: 1670: 1668: 1663: 1662: 1658: 1645: 1643: 1638: 1637: 1630: 1617: 1615: 1605: 1601: 1594: 1590: 1583:Express Tribune 1576: 1569: 1565: 1537:Multan Metrobus 1523: 1477: 1462:Lahore Metrobus 1423: 1421: 1405:Guangzhou Metro 1401: 1378: 1376:Electric supply 1370: 1361: 1348: 1327: 1307:Lahore Metrobus 1303: 1237:Lahore Metrobus 1212:Lahore Metrobus 1157: 1125: 1113: 1089: 1052: 1004: 999: 962: 961: 950: 887: 861: 830: 810: 790: 770: 748: 732:Shalamar Garden 726: 706: 684: 664: 646: 636: 616: 594: 567: 545: 523: 501: 481: 466:Salahudin Road 461: 441: 419: 397: 377: 357: 337: 315: 295: 276: 260: 246:Operating speed 228:Electrification 218: 211: 207: 204: 202: 201:4 ft  200: 196: 161: 159: 156: 81: 17: 12: 11: 5: 3533: 3523: 3522: 3517: 3512: 3507: 3490: 3489: 3487: 3486: 3481: 3476: 3470: 3468: 3457: 3456: 3454: 3453: 3446: 3443: 3438: 3435: 3432: 3429: 3426: 3423: 3420: 3417: 3412: 3407: 3402: 3397: 3392: 3389: 3386: 3383: 3378: 3373: 3370: 3367: 3362: 3359: 3356: 3348: 3346: 3335: 3334: 3329: 3328: 3321: 3314: 3306: 3297: 3296: 3294: 3293: 3288: 3282: 3280: 3276: 3275: 3273: 3272: 3268: 3266: 3260: 3259: 3257: 3256: 3252: 3250: 3244: 3243: 3241: 3240: 3237: 3234: 3231: 3228: 3223: 3218: 3213: 3208: 3203: 3200: 3195: 3192: 3187: 3185:Gulshan-e-Ravi 3182: 3177: 3174: 3173:Salahudin Road 3171: 3168: 3163: 3158: 3155: 3152: 3149: 3144: 3140: 3138: 3130: 3129: 3122: 3121: 3114: 3107: 3099: 3092: 3091: 3065: 3042: 3031: 3005: 2979: 2953: 2927: 2905: 2883: 2861: 2839: 2813: 2791: 2780:. May 12, 2016 2765: 2753:www.guancha.cn 2740: 2714: 2703: 2668: 2640: 2605: 2573: 2541: 2509: 2477: 2445: 2404: 2372: 2340: 2308: 2276: 2254: 2221: 2194: 2162: 2130: 2099: 2065: 2033: 2001: 1966: 1920: 1902: 1880: 1855: 1844:. May 16, 2017 1829: 1807: 1785: 1758: 1731: 1713: 1678: 1656: 1628: 1599: 1588: 1566: 1564: 1561: 1560: 1559: 1554: 1549: 1544: 1539: 1534: 1529: 1522: 1519: 1512:White elephant 1476: 1473: 1420: 1417: 1413:Daewoo Express 1400: 1397: 1377: 1374: 1369: 1366: 1360: 1357: 1347: 1344: 1339:Daewoo Express 1326: 1323: 1319:moving walkway 1302: 1299: 1282:Gulshan-e-Ravi 1231:(GPO) and the 1156: 1153: 1124: 1121: 1112: 1109: 1105:standard gauge 1088: 1085: 1058:The locomotive 1051: 1048: 1003: 1000: 998: 995: 984:Shahbaz Sharif 949: 946: 928:and the first 897: 896: 893: 892: 889: 888: 886: 885: 878: 871: 862:This diagram: 860: 857: 856: 853: 852: 850: 848: 846: 844: 842: 840: 837: 836: 833: 831: 824: 822: 820: 817: 816: 813: 811: 804: 802: 800: 797: 796: 793: 791: 784: 782: 780: 777: 776: 775:Mahmood Booti 773: 771: 764: 762: 760: 757: 756: 751: 749: 742: 740: 738: 735: 734: 729: 727: 720: 718: 716: 713: 712: 709: 707: 700: 698: 696: 693: 692: 687: 685: 678: 676: 674: 671: 670: 667: 665: 658: 656: 654: 651: 650: 639: 637: 630: 628: 626: 623: 622: 619: 617: 610: 608: 606: 603: 602: 597: 595: 588: 586: 584: 581: 580: 570: 568: 561: 559: 557: 554: 553: 548: 546: 539: 537: 535: 532: 531: 529:Gulshan-e-Ravi 526: 524: 517: 515: 513: 510: 509: 504: 502: 495: 493: 491: 488: 487: 484: 482: 475: 473: 471: 468: 467: 464: 462: 455: 453: 451: 448: 447: 444: 442: 435: 433: 431: 428: 427: 422: 420: 413: 411: 409: 406: 405: 400: 398: 391: 389: 387: 384: 383: 380: 378: 371: 369: 367: 364: 363: 360: 358: 351: 349: 347: 344: 343: 340: 338: 331: 329: 327: 324: 323: 318: 316: 309: 307: 305: 302: 301: 298: 296: 289: 287: 285: 278: 277: 272: 262: 261: 258: 251: 250: 247: 243: 242: 230: 224: 223: 220:standard gauge 194: 188: 187: 184: 180: 179: 176: 172: 171: 167: 166: 153: 149: 148: 144: 143: 140: 136: 135: 130: 126: 125: 120: 116: 115: 110: 106: 105: 101: 100: 95: 91: 90: 87: 83: 82: 80: 79: 76: 72: 70: 66: 65: 52: 48: 47: 44: 40: 39: 35: 34: 26: 25: 15: 9: 6: 4: 3: 2: 3532: 3521: 3518: 3516: 3513: 3511: 3508: 3506: 3503: 3502: 3500: 3485: 3482: 3480: 3477: 3475: 3472: 3471: 3469: 3467: 3463: 3458: 3452: 3451: 3447: 3444: 3442: 3439: 3436: 3433: 3430: 3427: 3424: 3421: 3418: 3416: 3413: 3411: 3408: 3406: 3403: 3401: 3398: 3396: 3393: 3390: 3388:Qartaba Chowk 3387: 3384: 3382: 3379: 3377: 3374: 3371: 3368: 3366: 3363: 3361:Timber Market 3360: 3357: 3355: 3354: 3350: 3349: 3347: 3345: 3341: 3336: 3327: 3322: 3320: 3315: 3313: 3308: 3307: 3304: 3292: 3289: 3287: 3284: 3283: 3281: 3277: 3270: 3269: 3267: 3261: 3254: 3253: 3251: 3245: 3238: 3235: 3232: 3230:Mahmood Booti 3229: 3227: 3226:Pakistan Mint 3224: 3222: 3219: 3217: 3214: 3212: 3209: 3207: 3204: 3202:Lakshmi Chowk 3201: 3199: 3196: 3193: 3191: 3188: 3186: 3183: 3181: 3178: 3175: 3172: 3169: 3167: 3164: 3162: 3159: 3156: 3153: 3150: 3148: 3145: 3142: 3141: 3139: 3137: 3131: 3127: 3120: 3115: 3113: 3108: 3106: 3101: 3100: 3097: 3080: 3076: 3069: 3053: 3046: 3040: 3035: 3019: 3015: 3009: 2994: 2990: 2983: 2968: 2964: 2957: 2942:. May 3, 2016 2941: 2937: 2931: 2923: 2919: 2918:nation.com.pk 2915: 2909: 2893: 2887: 2871: 2865: 2849: 2843: 2827: 2823: 2817: 2801: 2795: 2779: 2775: 2769: 2754: 2750: 2744: 2729: 2725: 2718: 2712: 2707: 2688: 2681: 2675: 2673: 2665: 2661: 2657: 2656: 2651: 2644: 2625: 2618: 2612: 2610: 2590: 2583: 2577: 2558: 2551: 2545: 2526: 2519: 2513: 2494: 2487: 2481: 2462: 2455: 2449: 2430: 2423: 2417: 2415: 2413: 2411: 2409: 2389: 2382: 2376: 2357: 2350: 2344: 2325: 2318: 2312: 2293: 2286: 2280: 2264: 2258: 2242: 2236: 2234: 2232: 2230: 2228: 2226: 2209: 2203: 2201: 2199: 2179: 2172: 2166: 2147: 2140: 2134: 2118: 2117:The Economist 2114: 2108: 2106: 2104: 2087: 2080: 2074: 2072: 2070: 2050: 2043: 2037: 2018: 2011: 2005: 1986: 1979: 1973: 1971: 1954: 1947: 1941: 1939: 1937: 1935: 1933: 1931: 1929: 1927: 1925: 1917: 1915: 1911: 1906: 1890: 1884: 1869: 1865: 1859: 1843: 1839: 1833: 1817: 1811: 1795: 1789: 1782: 1769: 1762: 1746: 1740: 1738: 1736: 1728: 1727: 1722: 1717: 1698: 1691: 1685: 1683: 1666: 1660: 1653: 1641: 1635: 1633: 1625: 1614: 1610: 1603: 1597: 1592: 1585: 1584: 1579: 1574: 1572: 1567: 1558: 1555: 1553: 1550: 1548: 1545: 1543: 1540: 1538: 1535: 1533: 1530: 1528: 1525: 1524: 1518: 1515: 1513: 1509: 1504: 1500: 1498: 1494: 1493:environmental 1486: 1481: 1472: 1468: 1465: 1463: 1457: 1455: 1451: 1447: 1443: 1416: 1414: 1410: 1406: 1396: 1394: 1389: 1387: 1383: 1373: 1365: 1356: 1352: 1343: 1340: 1336: 1332: 1322: 1320: 1316: 1312: 1308: 1298: 1296: 1291: 1287: 1283: 1279: 1271: 1266: 1262: 1260: 1252: 1248: 1244: 1242: 1238: 1234: 1230: 1226: 1217: 1213: 1209: 1204: 1200: 1198: 1194: 1190: 1186: 1182: 1181:Pakistan Mint 1178: 1174: 1166: 1161: 1152: 1150: 1146: 1142: 1138: 1134: 1129: 1120: 1118: 1108: 1106: 1102: 1093: 1084: 1082: 1077: 1073: 1064: 1056: 1050:Rolling stock 1047: 1043: 1039: 1036: 1027: 1019: 1012: 1008: 994: 992: 987: 985: 980: 978: 974: 970: 965:21.49 billion 959: 955: 945: 943: 939: 935: 931: 927: 923: 919: 915: 914:rapid transit 911: 903: 884: 879: 877: 872: 870: 865: 864: 859: 858: 851: 849: 847: 845: 843: 841: 839: 838: 832: 823: 821: 818: 812: 803: 801: 798: 792: 783: 781: 778: 772: 763: 761: 758: 755: 754:Pakistan Mint 750: 741: 739: 736: 733: 728: 719: 717: 714: 708: 699: 697: 694: 691: 686: 677: 675: 672: 666: 657: 655: 652: 643: 638: 629: 627: 624: 618: 609: 607: 604: 601: 596: 587: 585: 582: 578: 574: 569: 560: 558: 555: 552: 547: 538: 536: 533: 530: 525: 516: 514: 511: 508: 503: 494: 492: 489: 483: 474: 472: 469: 463: 454: 452: 449: 443: 434: 432: 429: 426: 421: 412: 410: 407: 404: 399: 390: 388: 385: 379: 370: 368: 365: 359: 350: 348: 345: 339: 330: 328: 325: 322: 317: 308: 306: 303: 297: 288: 286: 283: 280: 279: 275: 271: 270: 267: 264: 263: 257: 256: 252: 248: 244: 241: 238: 234: 231: 229: 225: 221: 197:1,435 mm 195: 193: 189: 185: 181: 177: 173: 168: 154: 150: 145: 141: 139:Rolling stock 137: 134: 131: 127: 124: 121: 117: 114: 113:Rapid transit 111: 107: 102: 99: 96: 92: 88: 84: 77: 74: 73: 71: 67: 64: 60: 56: 53: 49: 45: 41: 36: 32: 27: 22: 19: 3473: 3449: 3434:Atari Saroba 3369:Bhatti Chowk 3352: 3157:Wahadat Road 3133: 3126:Lahore Metro 3082:. Retrieved 3078: 3068: 3056:. Retrieved 3045: 3034: 3022:. Retrieved 3017: 3008: 2996:. Retrieved 2993:www.dawn.com 2992: 2982: 2970:. Retrieved 2967:www.dawn.com 2966: 2956: 2944:. Retrieved 2939: 2930: 2922:the original 2917: 2908: 2896:. Retrieved 2886: 2874:. Retrieved 2864: 2852:. Retrieved 2842: 2830:. Retrieved 2825: 2816: 2804:. Retrieved 2794: 2782:. Retrieved 2777: 2768: 2758:February 25, 2756:. Retrieved 2752: 2743: 2731:. Retrieved 2728:www.dawn.com 2727: 2717: 2706: 2694:. Retrieved 2687:the original 2663: 2660:the original 2653: 2643: 2631:. Retrieved 2624:the original 2596:. Retrieved 2589:the original 2576: 2564:. Retrieved 2557:the original 2544: 2532:. Retrieved 2525:the original 2512: 2500:. Retrieved 2493:the original 2480: 2468:. Retrieved 2461:the original 2448: 2436:. Retrieved 2429:the original 2395:. Retrieved 2388:the original 2375: 2363:. Retrieved 2356:the original 2343: 2331:. Retrieved 2324:the original 2311: 2299:. Retrieved 2292:the original 2279: 2267:. Retrieved 2257: 2245:. Retrieved 2212:. Retrieved 2185:. Retrieved 2178:the original 2165: 2153:. Retrieved 2146:the original 2133: 2121:. Retrieved 2116: 2113:"Short Cuts" 2090:. Retrieved 2085: 2056:. Retrieved 2049:the original 2036: 2024:. Retrieved 2017:the original 2004: 1992:. Retrieved 1985:the original 1957:. Retrieved 1952: 1912: 1905: 1895:September 1, 1893:. Retrieved 1883: 1871:. Retrieved 1867: 1858: 1846:. Retrieved 1841: 1832: 1820:. Retrieved 1810: 1798:. Retrieved 1788: 1779: 1772:. Retrieved 1761: 1749:. Retrieved 1724: 1716: 1704:. Retrieved 1697:the original 1669:. Retrieved 1659: 1651: 1644:. Retrieved 1623: 1616:. Retrieved 1602: 1591: 1581: 1557:Peshawar BRT 1516: 1505: 1501: 1490: 1469: 1466: 1458: 1439: 1402: 1390: 1379: 1371: 1362: 1353: 1349: 1328: 1304: 1275: 1256: 1221: 1170: 1130: 1126: 1114: 1098: 1069: 1044: 1040: 1032: 988: 981: 951: 938:Lahore Metro 909: 908: 835:Dera Gujran 795:Salamatpura 711:Baghbanpura 382:Wahdat Road 265: 123:Lahore Metro 18: 3479:Purple Line 3474:Orange Line 3425:Ghazi Chowk 3410:Kalma Chowk 3381:MAO College 3365:Azadi Chowk 3358:Niazi Chowk 3264:Purple Line 3233:Salamatpura 3216:Baghbanpura 3135:Orange Line 3058:January 24, 2898:January 24, 2876:January 24, 2854:January 24, 2806:January 24, 2696:January 25, 2633:January 25, 2598:January 25, 2566:January 25, 2534:January 25, 2502:January 25, 2470:January 25, 2438:January 25, 2397:January 25, 2365:January 25, 2333:January 25, 2301:January 25, 2269:January 25, 2247:January 24, 2214:January 24, 2187:January 25, 2155:January 25, 2123:January 24, 2092:January 25, 2058:January 25, 2026:January 25, 1994:January 25, 1959:January 25, 1822:January 24, 1800:January 24, 1774:January 24, 1751:January 24, 1706:January 25, 1646:January 24, 1311:MAO College 1301:Connections 1241:Jain Mandir 1216:MAO College 1189:Baghbanpura 942:metro train 910:Orange Line 815:Islam Park 669:Sultanpura 342:Canal View 192:Track gauge 175:Line length 129:Operator(s) 46:Operational 24:Orange Line 3499:Categories 3445:Dulu Khurd 3441:Youhanabad 3419:Naseerabad 3415:Model Town 3236:Islam Bagh 3151:Canal View 1563:References 1446:soft loans 1325:Operations 1261:Station. 1081:third rail 486:Bund Road 362:Hanjarwal 233:Third rail 162:2020-10-25 3484:Blue Line 3450:Gajjumata 3248:Blue Line 3194:Lake Road 3190:Chauburji 3180:Samanabad 3176:Bund Road 3154:Hanjarwal 1485:Chauburji 1475:Criticism 1286:Samanabad 1278:Chauburji 1259:Chauburji 1251:Chauburji 1149:Chauburji 1123:Alignment 973:Chauburji 963:Rs.  958:Exim Bank 905:Route map 507:Samanabad 403:Awan Town 300:Ali Town 259:Route map 183:Character 170:Technical 3385:Janazgah 3372:Katchery 3353:Shahdara 3344:Metrobus 3279:See also 3271:Proposed 3255:Proposed 3170:Shahnoor 3166:Sabzazar 3161:Awanabad 3079:DAWN.COM 1873:March 1, 1618:April 2, 1521:See also 1290:Sabzazar 1225:The Mall 1214:stop at 1208:Anarkali 1177:Shalamar 1035:Anarkali 1011:Anarkali 1002:Stations 926:Pakistan 916:line in 644:Station 621:Lakshmi 573:Anarkali 551:Chaburji 425:Sabzazar 215: in 86:Stations 63:Pakistan 38:Overview 3437:Nishtar 3431:Kamahan 3422:Qainchi 3084:May 14, 3024:May 12, 2998:May 12, 2972:May 12, 2946:May 12, 2832:May 12, 2784:May 12, 2733:May 12, 1848:May 16, 1671:May 30, 1448:by the 1419:Finance 1335:Norinco 1173:GT Road 1165:Lakshmi 948:History 642:Railway 210:⁄ 160: ( 147:History 104:Service 94:Website 69:Termini 3395:Ichhra 1317:via a 1183:, and 1175:until 997:Design 922:Punjab 918:Lahore 274:Legend 266: 152:Opened 119:System 59:Punjab 55:Lahore 51:Locale 43:Status 3466:Metro 3400:Canal 3391:Shama 2690:(PDF) 2683:(PDF) 2627:(PDF) 2620:(PDF) 2592:(PDF) 2585:(PDF) 2560:(PDF) 2553:(PDF) 2528:(PDF) 2521:(PDF) 2496:(PDF) 2489:(PDF) 2464:(PDF) 2457:(PDF) 2432:(PDF) 2425:(PDF) 2391:(PDF) 2384:(PDF) 2359:(PDF) 2352:(PDF) 2327:(PDF) 2320:(PDF) 2295:(PDF) 2288:(PDF) 2181:(PDF) 2174:(PDF) 2149:(PDF) 2142:(PDF) 2082:(PDF) 2052:(PDF) 2045:(PDF) 2020:(PDF) 2013:(PDF) 1988:(PDF) 1981:(PDF) 1949:(PDF) 1700:(PDF) 1693:(PDF) 1359:Speed 1276:From 1155:Route 1111:Depot 1087:Track 3086:2022 3060:2017 3026:2016 3000:2016 2974:2016 2948:2016 2900:2017 2878:2017 2856:2017 2834:2016 2808:2017 2786:2016 2760:2020 2735:2016 2698:2017 2635:2017 2600:2017 2568:2017 2536:2017 2504:2017 2472:2017 2440:2017 2399:2017 2367:2017 2335:2017 2303:2017 2271:2017 2249:2017 2216:2017 2189:2017 2157:2017 2125:2017 2094:2017 2060:2017 2028:2017 1996:2017 1961:2017 1897:2018 1875:2018 1850:2017 1824:2017 1802:2017 1776:2017 1753:2017 1726:Dawn 1708:2017 1673:2022 1648:2017 1620:2019 1411:and 882:edit 875:talk 868:view 235:750 109:Type 3211:UET 3198:GPO 1382:MWs 1076:LED 690:UET 600:GPO 3501:: 3077:. 3016:. 2991:. 2965:. 2938:. 2916:. 2824:. 2776:. 2751:. 2726:. 2671:^ 2652:. 2608:^ 2407:^ 2224:^ 2197:^ 2115:. 2102:^ 2084:. 2068:^ 1969:^ 1951:. 1923:^ 1866:. 1840:. 1778:. 1734:^ 1723:, 1681:^ 1650:. 1631:^ 1622:. 1611:. 1580:, 1570:^ 1415:. 1407:, 1333:, 1284:, 1191:, 1147:, 1143:, 1139:, 1083:. 993:. 924:, 920:, 240:DC 217:) 61:, 57:, 3325:e 3318:t 3311:v 3118:e 3111:t 3104:v 3088:. 3062:. 3028:. 3002:. 2976:. 2950:. 2902:. 2880:. 2858:. 2836:. 2810:. 2788:. 2762:. 2737:. 2700:. 2637:. 2602:. 2570:. 2538:. 2506:. 2474:. 2442:. 2401:. 2369:. 2337:. 2305:. 2273:. 2251:. 2218:. 2191:. 2159:. 2127:. 2096:. 2062:. 2030:. 1998:. 1963:. 1916:. 1899:. 1877:. 1852:. 1826:. 1804:. 1755:. 1710:. 1675:. 1487:. 1272:. 1218:. 1167:. 237:V 212:2 208:1 205:+ 203:8 199:( 164:)

Index


Lahore
Punjab
Pakistan
https://pma.punjab.gov.pk/orange-line-metro-train-system
Rapid transit
Lahore Metro
Punjab Mass Transit Authority
Track gauge
standard gauge
Electrification
Third rail
V
DC
Legend
Thokar Niaz Baig
Awan Town
Sabzazar
Samanabad
Gulshan-e-Ravi
Chaburji
Anarkali
Lahore Metrobus
GPO
Railway
UET
Shalamar Garden
Pakistan Mint
view
talk

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.