350:
finished in August 2003 for $ 8.2 million. The third section between US 70 and US 258 was opened on May 22, 2014. The extension involved the construction of 12 bridges and 2 highway interchanges. The roadway was formally dedicated in
November 2003 for the local leader behind the Global Transpark. A 5.8-mile (9.3 km) extension from NC 58 to NC 11 north of Kinston, planned to improve connectivity in northern Kinston between US 70, NC 58 and NC 11, opened to traffic on March 1, 2021.
28:
904:
333:
447:
262:
247:
115:
505:
476:
418:
145:
126:
91:
349:
The first section between Rouse Road and NC 58 was completed in May 2001 at a cost of $ 6.6 million. The route for the third section of the highway was chosen in July 2002. The roadway was named for C. Felix Harvey in August 2002. The second section between US 258 and Rouse Road was
340:
NC 148 begins at an interchange with US 70 west of
Kinston. The highway then proceeds northward, paralleling US 258 before crossing and having an interchange with each other. Turning eastward, the highway runs around the south side of Kinston Regional Jetport and NC Global Transpark
934:
551:
893:
358:
The parkway is expected to be extended a short distance to the south to
Sanderson Way. This will be part of the US 70 upgrade to I-42 project.
215:
341:
before having an interchange with NC 58. Continuing eastward, NC 148 ends at an interchange with NC 11 northeast of
Kinston.
908:
58:
324:
The highway is named after entrepreneur, businessman, and banker C. Felix Harvey III (1920-2014), who was born and raised in
Kinston.
929:
711:
225:
816:
220:
939:
230:
880:
944:
875:
841:
421:
294:
94:
371:
302:
207:
188:
604:
516:
265:
250:
892:
789:
686:
508:
487:
479:
458:
429:
298:
148:
129:
310:
512:
483:
454:
425:
367:
314:
98:
737:
578:
659:
633:
8:
914:
764:
318:
884:
306:
450:
178:
118:
923:
290:
168:
401:
556:
305:. The route is completely located within Lenoir County and runs near the
321:, with a maximum speed limit of 65 miles per hour (105 km/h).
842:"Kinston Bypass: C.F. Harvey Parkway & Banks School Road Map"
404:
903:
526:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
332:
27:
712:"C.F. Harvey Parkway open in time for Memorial Day"
571:
16:State highway in Lenoir County, North Carolina, US
817:"Harvey Parkway extension opens six months early"
921:
894:Template:Attached KML/North Carolina Highway 148
597:
289:, is a 13.2-mile (21.2 km) east–west
935:Transportation in Lenoir County, North Carolina
738:"Contract Awarded for Harvey Parkway Extension"
765:"Road Named for Economic Driving Force Harvey"
687:"Crescent Road Project Named for Felix Harvey"
851:. North Carolina Department of Transportation
796:. North Carolina Department Of Transportation
546:
544:
542:
794:North Carolina Department Of Transportation
605:"Founder C. Felix Harvey passes at age 93"
585:. Junior Achievement of the Carolinas, Inc
539:
897:
756:
762:
331:
317:. The entire route is a four-lane rural
684:
628:
626:
922:
763:Figueroa, Joe A. (November 19, 2003).
361:
678:
502:
496:
473:
467:
444:
438:
415:
409:
397:
685:Shrader, Jennifer (August 7, 2002).
623:
583:North Carolina Business Hall of Fame
327:
704:
13:
385:
14:
956:
866:
634:"Felix Harvey Parkway Fast Facts"
930:State highways in North Carolina
902:
814:
503:
474:
445:
416:
260:
245:
143:
124:
113:
89:
68:13.2 mi (21.2 km)
26:
834:
808:
790:"C.F. Harvey Parkway Extension"
782:
730:
652:
46:NC 148 highlighted in red
1:
940:Expressways in North Carolina
552:"Overview Map of NC 148"
533:
521:Interchange, eastern terminus
434:Interchange, western terminus
380:
208:North Carolina Highway System
7:
10:
961:
945:Freeways in North Carolina
909:North Carolina Highway 148
344:
279:North Carolina Highway 148
33:North Carolina Highway 148
525:
520:
499:
491:
470:
462:
441:
433:
412:
399:
392:
389:
384:
379:
353:
313:, serving as a bypass of
238:
203:
198:
194:
184:
174:
164:
159:
155:
139:
104:
85:
80:
72:
64:
56:
51:
44:
39:
23:
311:Kinston Regional Jetport
405:Future western terminus
366:The entire route is in
337:
915:NCRoads.com: N.C. 148
579:"C. Felix Harvey III"
336:Eastbound NC 148
335:
285:), also known as the
911:at Wikimedia Commons
898:KML is from Wikidata
660:"Political Intrigue"
666:. December 26, 2002
640:. November 19, 2003
362:Major intersections
307:NC Global TransPark
287:C.F. Harvey Parkway
106:Major intersections
40:C.F. Harvey Parkway
769:Kinston Free Press
742:Kinston Free Press
716:Kinston Free Press
691:Kinston Free Press
664:Kinston Free Press
638:Kinston Free Press
338:
907:Media related to
611:. January 6, 2014
531:
530:
328:Route description
276:
275:
272:
271:
52:Route information
952:
906:
888:
861:
860:
858:
856:
846:
838:
832:
831:
829:
827:
815:Team, WITN Web.
812:
806:
805:
803:
801:
786:
780:
779:
777:
775:
760:
754:
753:
751:
749:
734:
728:
727:
725:
723:
708:
702:
701:
699:
697:
682:
676:
675:
673:
671:
656:
650:
649:
647:
645:
630:
621:
620:
618:
616:
601:
595:
594:
592:
590:
575:
569:
568:
566:
564:
548:
507:
506:
478:
477:
449:
448:
420:
419:
387:
382:
377:
376:
268:
264:
263:
253:
249:
248:
240:
239:
147:
146:
128:
127:
117:
116:
107:
93:
92:
30:
21:
20:
960:
959:
955:
954:
953:
951:
950:
949:
920:
919:
899:
896:
891:
890:
889:
873:
869:
864:
854:
852:
844:
840:
839:
835:
825:
823:
813:
809:
799:
797:
788:
787:
783:
773:
771:
761:
757:
747:
745:
736:
735:
731:
721:
719:
710:
709:
705:
695:
693:
683:
679:
669:
667:
658:
657:
653:
643:
641:
632:
631:
624:
614:
612:
603:
602:
598:
588:
586:
577:
576:
572:
562:
560:
550:
549:
540:
536:
527:
504:
475:
446:
417:
364:
356:
347:
330:
261:
259:
246:
244:
144:
135:
125:
114:
105:
90:
81:Major junctions
47:
35:
34:
31:
17:
12:
11:
5:
958:
948:
947:
942:
937:
932:
918:
917:
912:
872:
871:
870:
868:
867:External links
865:
863:
862:
833:
807:
781:
755:
744:. July 8, 2009
729:
718:. May 27, 2014
703:
677:
651:
622:
596:
570:
537:
535:
532:
529:
528:
523:
522:
519:
501:
498:
494:
493:
490:
472:
469:
465:
464:
461:
443:
440:
436:
435:
432:
414:
411:
407:
406:
403:
400:
398:
395:
394:
391:
388:
383:
363:
360:
355:
352:
346:
343:
329:
326:
293:that connects
274:
273:
270:
269:
256:
254:
236:
235:
234:
233:
228:
223:
218:
212:
211:
201:
200:
199:Highway system
196:
195:
192:
191:
186:
182:
181:
179:North Carolina
176:
172:
171:
166:
162:
161:
157:
156:
153:
152:
141:
137:
136:
134:
133:
122:
110:
108:
102:
101:
87:
83:
82:
78:
77:
74:
70:
69:
66:
62:
61:
57:Maintained by
54:
53:
49:
48:
45:
42:
41:
37:
36:
32:
25:
24:
15:
9:
6:
4:
3:
2:
957:
946:
943:
941:
938:
936:
933:
931:
928:
927:
925:
916:
913:
910:
905:
901:
900:
895:
886:
882:
878:
877:
855:September 28,
850:
849:www.ncdot.gov
843:
837:
822:
818:
811:
795:
791:
785:
770:
766:
759:
743:
739:
733:
717:
713:
707:
692:
688:
681:
665:
661:
655:
639:
635:
629:
627:
610:
606:
600:
584:
580:
574:
559:
558:
553:
547:
545:
543:
538:
524:
518:
514:
510:
495:
489:
485:
481:
466:
460:
456:
452:
437:
431:
427:
423:
408:
402:Sanderson Way
396:
378:
375:
373:
372:Lenoir County
369:
359:
351:
342:
334:
325:
322:
320:
316:
312:
308:
304:
303:Lenoir County
300:
296:
292:
291:state highway
288:
284:
280:
267:
257:
255:
252:
242:
241:
237:
232:
229:
227:
224:
222:
219:
217:
214:
213:
210:
209:
205:
204:
202:
197:
193:
190:
187:
183:
180:
177:
173:
170:
169:United States
167:
163:
158:
154:
150:
142:
140:East end
138:
131:
123:
120:
112:
111:
109:
103:
100:
96:
88:
86:West end
84:
79:
75:
71:
67:
63:
60:
55:
50:
43:
38:
29:
22:
19:
874:
853:. Retrieved
848:
836:
824:. Retrieved
821:www.witn.com
820:
810:
798:. Retrieved
793:
784:
772:. Retrieved
768:
758:
746:. Retrieved
741:
732:
720:. Retrieved
715:
706:
694:. Retrieved
690:
680:
668:. Retrieved
663:
654:
642:. Retrieved
637:
613:. Retrieved
608:
599:
587:. Retrieved
582:
573:
561:. Retrieved
555:
390:Destinations
365:
357:
348:
339:
323:
286:
282:
278:
277:
206:
151:near Kinston
132:near Kinston
121:near Kinston
76:2009βpresent
18:
774:January 12,
748:January 12,
696:January 12,
670:January 12,
644:January 12,
557:Google Maps
492:Interchange
463:Interchange
451:US 258
283:NC 148
266:NC 149
251:NC 147
119:US 258
924:Categories
609:Union Bank
534:References
517:Greenville
509:NC 11
480:NC 58
422:US 70
319:expressway
299:NC 11
295:US 70
216:Interstate
149:NC 11
130:NC 58
95:US 70
488:Snow Hill
459:Snow Hill
430:Goldsboro
876:KML file
826:July 30,
800:June 19,
615:July 31,
589:July 31,
563:July 31,
511: β
482: β
453: β
424: β
185:Counties
160:Location
722:May 29,
554:(Map).
513:Kinston
484:Kinston
455:Kinston
426:Kinston
368:Kinston
345:History
315:Kinston
165:Country
99:Kinston
73:Existed
354:Future
231:Scenic
189:Lenoir
65:Length
845:(PDF)
393:Notes
226:State
175:State
97:near
59:NCDOT
885:help
881:edit
857:2023
828:2021
802:2019
776:2011
750:2011
724:2014
698:2011
672:2011
646:2011
617:2021
591:2021
565:2021
500:21.2
497:13.2
471:12.9
309:and
468:8.0
442:5.1
439:3.2
413:0.0
410:0.0
301:in
297:to
926::
883:β’
847:.
819:.
792:.
767:.
740:.
714:.
689:.
662:.
636:.
625:^
607:.
581:.
541:^
515:,
486:,
457:,
428:,
386:km
381:mi
374:.
370:,
258:β
243:β
221:US
887:)
879:(
859:.
830:.
804:.
778:.
752:.
726:.
700:.
674:.
648:.
619:.
593:.
567:.
281:(
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.