1422: 29: 1487:; trains will run along this new track, down the Dighton and Somerset Railroad, and then along the Middleborough Secondary from Weir Junction to Cotley Junction. When Phase 2 is completed, service from Middleborough to New Bedford and Fall River will be eliminated (but will kept as a backup option in the event of service/delays cancellation along the old Dighton and Somerset line), and Middleborough/Lakeville Line will terminate at Pilgrim Junction; the section of the Middleborough Secondary east of Cotley Junction will return to being used only for freight service. 1604: 1370: 878: 702: 443: 348: 1021: 834: 693: 1004: 827: 450: 362: 262: 1155: 871: 779: 535: 355: 1148: 1141: 710: 596: 269: 1195: 938: 189: 718: 640: 589: 255: 1102: 1060: 1041: 1013: 964: 945: 805: 786: 674: 667: 633: 528: 509: 424: 329: 231: 1661: 1474:
will be constructed on the east end of the line. The MBTA issued a $ 403.5 million contract for the Middleborough Secondary and New Bedford Main Line portions of the project on August 24, 2020; construction was expected to begin later in 2020 and take 37 months. The work will upgrade Middleborough
1413:
in 1893. Year-round New York–Cape Cod and Boston–Fall River/New Bedford passenger service ended in 1958, and local service on the Attleboro–Taunton and Cotley Junction–Middleborough segments somewhat before then. However, summer-only trains from New York to
1377:
The current Middleborough Subdivision is formed from sections of four different railroads built in the 19th century. The oldest section is from northwestern Taunton into downtown Taunton, opened in April 1836 as part of the
1444:
in 1976. The station purchased the line from Conrail, along with several other branch lines in Southeastern Massachusetts, for $ 1.2 million in December 1982. The Attleboro–Middleborough route was used by Amtrak's seasonal
1395: 1405:
The Old Colony acquired the Middleborough and Taunton Railroad in 1874. The same year, the New Bedford and Taunton Railroad became the New Bedford Railroad. It joined the
1087: 1406: 1516: 1475:
Secondary tracks for passenger service and construct the new Middleborough station. Phase 2, planned for 2030, will extend passenger service from the
1418:
used the line from Attleboro to Middleborough from 1960 to 1964, as did Boston–Hyannis service on the Taunton–Middleborough section briefly in 1961.
1643: 1265: 1685: 1410: 1665: 649: 1258: 1690: 1680: 1578: 240: 1421: 1496: 1399: 1387: 1617: 1251: 1551: 65: 1484: 1452: 760: 561: 488: 61: 28: 1467: 1358: 1315: 87: 1347: 34: 1391: 1476: 1466:
project. Phase 1 in 2023 will run along the line from Pilgrim Junction to Cotley Junction, extending
1603: 1456: 1379: 1339: 1311: 577: 217: 82: 1383: 1351: 990: 919: 395: 1398:
opened a line from southeastern Taunton east to Middleborough in July 1856. In August 1871, the
1415: 1319: 1592: 1471: 1425: 1343: 8: 1479:
to New Bedford and Fall River, and will involve the construction of new track connecting
1447: 1394:
in 1840, including the current Middleboro Subdivision southeast of downtown Taunton. The
1571: 1433: 1355: 1335: 403: 301: 209: 105: 1547: 1480: 1462:
Portions of the Middleborough Secondary are planned for passenger use as part of the
1409:
in 1876. The Old Colony acquired that system in 1879, and was itself merged into the
557: 1644:"FMCB Approves $ 403.5 Million Contract for South Coast Rail Main Line Construction" 1463: 1208: 549: 1618:"Conrail System Map Showing The Proposed Allocation Of Conrail Lines & Rights" 1459:. Freight service on the line was assigned to CSX in the 1999 breakup of Conrail. 1369: 1122: 1674: 1646:(Press release). Massachusetts Bay Transportation Authority. August 24, 2020. 1621: 1307: 309: 69: 1437: 1402:
built a branch from Attleboro Junction in northwest Taunton to Attleboro.
1373:
Middleborough Junction (Cotley Junction) station in the early 20th century
125: 1299: 1346:
then southeast through downtown Taunton. At Cotley Junction (near
1441: 1303: 51: 1660: 1331: 1599:. December 31, 1982. p. 16 – via Newspapers.com. 1620:. Norfolk Southern Railroad. July 9, 1997. Archived from 1470:
commuter service to Fall River and New Bedford. A new
1386:- one of the first railroad lines in New England. The 1407:
Boston, Clinton, Fitchburg and New Bedford Railroad
1572:"Changes to Transit Service in the MBTA district" 1672: 1354:and turns east. The line ends with a wye to the 1204: 1163: 1118: 1068: 980: 915: 886: 842: 755: 726: 604: 545: 478: 458: 390: 370: 297: 277: 205: 170: 1390:completed an extension from Taunton south to 1259: 1565: 1563: 1266: 1252: 1411:New York, New Haven and Hartford Railroad 1560: 1420: 1368: 709: 701: 1546:. Branch Line Press. pp. 327–330. 1522:. CSX Transportation. November 1, 2004. 1673: 1544:The Rail Lines of Southern New England 1451:service from 1986 to 1996, and by the 1361:just south of downtown Middleborough. 1537: 1535: 1533: 1531: 1529: 1440:in 1969, and the line became part of 1686:Rail infrastructure in Massachusetts 1541: 1020: 1012: 1569: 1342:. From there, it runs east through 13: 1526: 14: 1702: 1654: 1579:Boston Street Railway Association 1517:"Albany Division Timetable No. 4" 1659: 1602: 1497:List of CSX Transportation lines 1400:New Bedford and Taunton Railroad 1388:New Bedford and Taunton Railroad 1193: 1153: 1146: 1139: 1100: 1058: 1039: 1019: 1011: 1003: 1002: 962: 943: 936: 877: 876: 869: 832: 826: 825: 803: 784: 777: 716: 708: 700: 691: 672: 665: 638: 631: 594: 587: 533: 526: 507: 449: 448: 442: 441: 422: 361: 360: 353: 347: 346: 327: 267: 260: 253: 229: 187: 27: 1396:Middleboro and Taunton Railroad 833: 778: 692: 534: 354: 1636: 1610: 1593:"Bay State gets Conrail lines" 1585: 1509: 1147: 1140: 595: 268: 261: 33:Middleboro Secondary track at 1: 1502: 1485:Dighton and Somerset Railroad 1455:in 1988, both with a stop at 1453:Cape Cod and Hyannis Railroad 1194: 1154: 937: 870: 188: 16:Railway line in Massachusetts 1468:Middleborough/Lakeville Line 1359:Middleborough/Lakeville Line 717: 639: 588: 254: 7: 1490: 1101: 1059: 1040: 963: 944: 804: 785: 673: 666: 632: 527: 508: 423: 328: 230: 10: 1707: 1542:Karr, Ronald Dale (1995). 1428:under construction in 2022 1364: 1691:Old Colony Railroad lines 1477:Providence/Stoughton Line 1350:), it separates from the 1202: 1187: 1180: 1113: 1109: 1094: 1085: 1052: 1048: 1033: 1029: 975: 971: 956: 952: 910: 903: 863: 859: 816: 812: 797: 793: 750: 743: 685: 681: 659: 647: 625: 621: 573: 542: 520: 516: 501: 475: 435: 431: 416: 387: 340: 336: 321: 294: 247: 238: 200: 196: 181: 155: 124: 120:21.1 miles (34.0 km) 116: 111: 101: 96: 75: 57: 47: 42: 26: 21: 1681:CSX Transportation lines 1632:– via Mark D. Bej. 1325: 984:Former Middleboro Branch 482:Former Whittendon Branch 1666:Middleborough Secondary 1384:Taunton Branch Railroad 1352:New Bedford Subdivision 1330:The line diverges from 1292:Middleborough Secondary 767:to Fall River Secondary 550:South Coast Rail (2030) 1429: 1374: 1296:Middleboro Subdivision 1668:at Wikimedia Commons 1472:Middleborough station 1426:Middleborough station 1424: 1372: 1310:. The line runs from 1306:in the U.S. state of 1288:Middleboro Secondary 1209:Middleboro Main Line 22:Middleboro Secondary 1570:Belcher, Jonathan. 1434:New Haven Railroad 1430: 1375: 1356:MBTA Commuter Rail 1336:Northeast Corridor 1088:Middleboro Layover 820:Former Weir Branch 404:Northeast Corridor 302:Northeast Corridor 210:Northeast Corridor 1664:Media related to 1340:Attleboro station 1284: 1283: 1280: 1279: 1276: 1275: 1240: 1239: 1219: 1218: 1176: 1175: 1133: 1132: 1081: 1080: 996: 995: 930: 929: 899: 898: 855: 854: 771: 770: 761:Dight. & Som. 739: 738: 617: 616: 567: 566: 562:Dight. & Som. 495: 494: 489:Dight. & Som. 471: 470: 410: 409: 383: 382: 315: 314: 290: 289: 223: 222: 1698: 1663: 1648: 1647: 1640: 1634: 1633: 1631: 1629: 1614: 1608: 1607: 1606: 1600: 1589: 1583: 1582: 1576: 1567: 1558: 1557: 1539: 1524: 1523: 1521: 1513: 1464:South Coast Rail 1268: 1261: 1254: 1248: 1215:to South Station 1205: 1197: 1196: 1182:Pilgrim Junction 1164: 1157: 1156: 1150: 1149: 1143: 1142: 1119: 1104: 1103: 1069: 1062: 1061: 1043: 1042: 1023: 1022: 1015: 1014: 1006: 1005: 991:N.B. Subdivision 981: 966: 965: 947: 946: 940: 939: 920:N.B. Subdivision 916: 887: 880: 879: 873: 872: 843: 836: 835: 829: 828: 807: 806: 788: 787: 781: 780: 756: 727: 720: 719: 712: 711: 704: 703: 695: 694: 676: 675: 669: 668: 642: 641: 635: 634: 605: 598: 597: 591: 590: 546: 537: 536: 530: 529: 511: 510: 479: 459: 452: 451: 445: 444: 426: 425: 391: 371: 364: 363: 357: 356: 350: 349: 331: 330: 298: 278: 271: 270: 264: 263: 257: 256: 233: 232: 218:Washington, D.C. 206: 191: 190: 179: 178: 171: 157: 156: 150: 146: 144: 143: 139: 136: 37:in December 2022 31: 19: 18: 1706: 1705: 1701: 1700: 1699: 1697: 1696: 1695: 1671: 1670: 1657: 1652: 1651: 1642: 1641: 1637: 1627: 1625: 1624:on July 7, 2012 1616: 1615: 1611: 1601: 1591: 1590: 1586: 1574: 1568: 1561: 1554: 1540: 1527: 1519: 1515: 1514: 1510: 1505: 1493: 1367: 1328: 1272: 1246: 1198: 1183: 1178: 1158: 1151: 1144: 1135: 1105: 1090: 1083: 1063: 1044: 1025: 1024: 1017: 1016: 1007: 998: 967: 948: 941: 932: 906: 905:Cotley Junction 901: 881: 874: 857: 837: 830: 821: 808: 789: 782: 773: 746: 741: 721: 714: 713: 706: 705: 696: 677: 670: 655: 643: 636: 619: 599: 592: 583: 569: 538: 531: 512: 497: 473: 453: 446: 427: 412: 385: 365: 358: 351: 332: 317: 292: 272: 265: 258: 243: 234: 225: 192: 162: 148: 141: 137: 134: 132: 131:4 ft  130: 92: 66:Plymouth County 38: 17: 12: 11: 5: 1704: 1694: 1693: 1688: 1683: 1656: 1655:External links 1653: 1650: 1649: 1635: 1609: 1584: 1559: 1552: 1525: 1507: 1506: 1504: 1501: 1500: 1499: 1492: 1489: 1366: 1363: 1338:just north of 1327: 1324: 1302:line owned by 1282: 1281: 1278: 1277: 1274: 1273: 1271: 1270: 1263: 1256: 1247:This diagram: 1245: 1242: 1241: 1238: 1237: 1235: 1233: 1231: 1229: 1227: 1225: 1222: 1221: 1217: 1216: 1212: 1211: 1201: 1199: 1192: 1190: 1188: 1185: 1184: 1181: 1179: 1174: 1173: 1169: 1168: 1161: 1159: 1152: 1145: 1138: 1136: 1131: 1130: 1126: 1125: 1123:Cape Main Line 1116: 1114: 1111: 1110: 1108: 1106: 1099: 1097: 1095: 1092: 1091: 1086: 1084: 1079: 1078: 1074: 1073: 1066: 1064: 1057: 1055: 1053: 1050: 1049: 1047: 1045: 1038: 1036: 1034: 1031: 1030: 1028: 1026: 1018: 1010: 1009: 1008: 1001: 999: 994: 993: 986: 985: 978: 976: 973: 972: 970: 968: 961: 959: 957: 954: 953: 951: 949: 942: 935: 933: 928: 927: 926:to New Bedford 923: 922: 913: 911: 908: 907: 904: 902: 897: 896: 892: 891: 884: 882: 875: 868: 866: 864: 861: 860: 858: 853: 852: 848: 847: 840: 838: 831: 824: 822: 819: 817: 814: 813: 811: 809: 802: 800: 798: 795: 794: 792: 790: 783: 776: 774: 769: 768: 764: 763: 753: 751: 748: 747: 744: 742: 737: 736: 732: 731: 724: 722: 715: 707: 699: 698: 697: 690: 688: 686: 683: 682: 680: 678: 671: 664: 662: 660: 657: 656: 648: 646: 644: 637: 630: 628: 626: 623: 622: 620: 615: 614: 610: 609: 602: 600: 593: 586: 584: 576: 574: 571: 570: 565: 564: 553: 552: 543: 541: 539: 532: 525: 523: 521: 518: 517: 515: 513: 506: 504: 502: 499: 498: 493: 492: 484: 483: 476: 474: 469: 468: 464: 463: 456: 454: 447: 440: 438: 436: 433: 432: 430: 428: 421: 419: 417: 414: 413: 408: 407: 399: 398: 396:Taunton Branch 388: 386: 381: 380: 376: 375: 368: 366: 359: 352: 345: 343: 341: 338: 337: 335: 333: 326: 324: 322: 319: 318: 313: 312: 305: 304: 295: 293: 288: 287: 283: 282: 275: 273: 266: 259: 252: 250: 248: 245: 244: 239: 237: 235: 228: 226: 221: 220: 213: 212: 203: 201: 198: 197: 195: 193: 186: 184: 182: 175: 174: 164: 163: 160: 153: 152: 128: 122: 121: 118: 114: 113: 109: 108: 103: 99: 98: 94: 93: 91: 90: 85: 79: 77: 73: 72: 62:Bristol County 59: 55: 54: 49: 45: 44: 40: 39: 32: 24: 23: 15: 9: 6: 4: 3: 2: 1703: 1692: 1689: 1687: 1684: 1682: 1679: 1678: 1676: 1669: 1667: 1662: 1645: 1639: 1623: 1619: 1613: 1605: 1598: 1594: 1588: 1580: 1573: 1566: 1564: 1555: 1549: 1545: 1538: 1536: 1534: 1532: 1530: 1518: 1512: 1508: 1498: 1495: 1494: 1488: 1486: 1482: 1478: 1473: 1469: 1465: 1460: 1458: 1454: 1450: 1449: 1443: 1439: 1435: 1427: 1423: 1419: 1417: 1412: 1408: 1403: 1401: 1397: 1393: 1389: 1385: 1381: 1371: 1362: 1360: 1357: 1353: 1349: 1345: 1341: 1337: 1333: 1323: 1321: 1317: 1316:Middleborough 1313: 1309: 1308:Massachusetts 1305: 1301: 1297: 1293: 1290:(also called 1289: 1269: 1264: 1262: 1257: 1255: 1250: 1249: 1244: 1243: 1236: 1234: 1232: 1230: 1228: 1226: 1224: 1223: 1214: 1213: 1210: 1207: 1206: 1200: 1191: 1189: 1186: 1171: 1170: 1166: 1165: 1160: 1137: 1128: 1127: 1124: 1121: 1120: 1115: 1112: 1107: 1098: 1096: 1093: 1089: 1076: 1075: 1071: 1070: 1065: 1056: 1054: 1051: 1046: 1037: 1035: 1032: 1027: 1000: 992: 988: 987: 983: 982: 977: 974: 969: 960: 958: 955: 950: 934: 925: 924: 921: 918: 917: 912: 909: 894: 893: 889: 888: 883: 867: 865: 862: 850: 849: 845: 844: 839: 823: 818: 815: 810: 801: 799: 796: 791: 775: 766: 765: 762: 758: 757: 752: 749: 745:Weir Junction 734: 733: 729: 728: 723: 689: 687: 684: 679: 663: 661: 658: 654: 651: 645: 629: 627: 624: 612: 611: 607: 606: 601: 585: 582: 579: 575: 572: 563: 559: 555: 554: 551: 548: 547: 540: 524: 522: 519: 514: 505: 503: 500: 490: 486: 485: 481: 480: 466: 465: 461: 460: 455: 439: 437: 434: 429: 420: 418: 415: 405: 401: 400: 397: 393: 392: 378: 377: 373: 372: 367: 344: 342: 339: 334: 325: 323: 320: 311: 310:South Station 307: 306: 303: 300: 299: 285: 284: 280: 279: 274: 251: 249: 246: 242: 236: 227: 219: 215: 214: 211: 208: 207: 202: 199: 194: 185: 183: 180: 177: 176: 173: 172: 169: 166: 165: 159: 158: 154: 149:1,435 mm 129: 127: 123: 119: 115: 110: 107: 104: 100: 95: 89: 88:Middleborough 86: 84: 81: 80: 78: 74: 71: 70:Massachusetts 67: 63: 60: 56: 53: 50: 46: 41: 36: 30: 25: 20: 1658: 1638: 1628:November 25, 1626:. Retrieved 1622:the original 1612: 1597:Boston Globe 1596: 1587: 1543: 1511: 1461: 1446: 1438:Penn Central 1436:folded into 1431: 1404: 1376: 1348:Weir Village 1329: 1295: 1291: 1287: 1285: 1167:21.1 mi 1077:33.2 km 1072:20.6 mi 895:21.4 km 890:13.3 mi 846:11.8 mi 735:18.7 km 730:11.6 mi 652: 613:17.1 km 608:10.6 mi 580: 467:14.8 km 406:in Mansfield 379:13.4 km 167: 35:Barrowsville 1448:Cape Codder 1392:New Bedford 462:9.2 mi 374:8.3 mi 281:0.0 mi 126:Track gauge 117:Line length 102:Operator(s) 1675:Categories 1553:0942147022 1503:References 1172:34 km 1129:to Hyannis 851:19 km 491:in Raynham 1481:Stoughton 1382:-Taunton 1380:Mansfield 1312:Attleboro 558:Stoughton 286:0 km 241:Attleboro 161:Route map 112:Technical 83:Attleboro 1491:See also 1300:railroad 581:(closed) 145: in 43:Overview 1483:to the 1457:Taunton 1442:Conrail 1416:Hyannis 1365:History 1320:Taunton 1304:MassDOT 1298:) is a 759:Former 650:Taunton 578:Taunton 394:Former 140:⁄ 97:Service 76:Termini 52:MassDOT 1550:  1344:Norton 1332:Amtrak 1220: 653:(2030) 168: 58:Locale 1575:(PDF) 1520:(PDF) 1326:Route 1203: 1177: 1162: 1134: 1117: 1082: 1067: 997: 979: 931: 914: 900: 885: 856: 841: 772: 754: 740: 725: 618: 603: 568: 544: 496: 477: 472: 457: 411: 389: 384: 369: 316: 296: 291: 276: 224: 204: 48:Owner 1630:2006 1548:ISBN 1432:The 1318:via 1294:and 1286:The 1267:edit 1260:talk 1253:view 560:via 64:and 1334:'s 1314:to 989:to 556:to 487:to 402:to 308:to 216:to 106:CSX 1677:: 1595:. 1577:. 1562:^ 1528:^ 1322:. 68:, 1581:. 1556:. 151:) 147:( 142:2 138:1 135:+ 133:8

Index


Barrowsville
MassDOT
Bristol County
Plymouth County
Massachusetts
Attleboro
Middleborough
CSX
Track gauge
Northeast Corridor
Washington, D.C.
Attleboro
Northeast Corridor
South Station
Taunton Branch
Northeast Corridor
Dight. & Som.
South Coast Rail (2030)
Stoughton
Dight. & Som.
Taunton
Taunton
Dight. & Som.
N.B. Subdivision
N.B. Subdivision
Middleboro Layover
Cape Main Line
Middleboro Main Line