388:
off-peak hours, more frequently during peak periods, and less frequently at night. Before July 2018, off-peak passenger train services between
Wellington and Waikanae ran every thirty minutes but were increased to one every twenty minutes from 15 July 2018. Off-peak trains stop at all stations between Wellington and Waikanae. During peak periods, some trains from Wellington that stop at all stations may terminate at Porirua and return to Wellington while a number of peak services run express or non-stop between Wellington and Porirua before stopping at all stations from Porirua to Waikanae.
58:
387:
Travel times by train are thirty-three minutes to
Waikanae, six minutes to Porirua, twenty-seven minutes to Wellington for trains stopping at all stations, and twenty-three minutes for express trains that do not stop between Porirua and Wellington. Trains run every twenty minutes during daytime
433:
and the two platforms were ready some time before … As the new line was on a different alignment to the old, a temporary wooden platform was built to fit in the gap between the old track and the new platforms. This gave the station the appearance of an aircraft carrier flight
415:
were available. For traffic reasons only EMUs could stop there, although initially only 5 of the 13 trains each way on weekdays were operated by EMUs. The halt (along with the locality) was initially called
396:
There are two shelters for passengers waiting for their train, one on the northern side towards
Waikanae (terminus of the Kapiti Line) and one on the southern side towards Wellington CBD
562:
90:
525:
557:
365:
326:
552:
17:
429:
Double tracking north to Mana was opened on 7 November 1960. Mana station was built to fit into the duplication project:
125:
304:
139:
46:
349:
271:
246:
438:
The passenger shelters at Mana station were replaced with new shelters in the year ending June 2015.
417:
357:
266:
251:
353:
420:, but was changed to Mana in 1960 as many local residents did not like the name (from Dickens's
348:
under the
Metlink brand contracted to the Greater Wellington Regional Council. Services between
408:
384:
carriage trains and diesel hauled KiwiRail freight trains pass by the station but do not stop.
361:
8:
345:
236:
373:
547:
377:
369:
309:
77:
458:
412:
404:
The single platform halt was opened on 5 September 1949, when the first of the new
484:
381:
541:
422:
105:
92:
57:
49:
405:
332:
It is double tracked with a platform each side and a subway between them.
341:
322:
300:
259:
135:
314:
318:
513:
340:Mana is the second station north of Porirua on the
62:
Southbound
Platform Shelter at Mana Railway Station
539:
485:"Kapiti Line (Waikanae - Wellington) - Metlink"
459:"Kapiti Line (Waikanae - Wellington) - Metlink"
453:
451:
563:Railway stations in New Zealand opened in 1949
448:
380:, pass through the station but do not stop.
56:
14:
540:
235:
558:Buildings and structures in Porirua
126:Greater Wellington Regional Council
24:
25:
574:
344:for commuter trains operated by
526:Wellington Metropolitan Rail,
305:North Island Main Trunk Railway
519:
502:
477:
27:Railway station in New Zealand
13:
1:
441:
391:
553:Rail transport in Wellington
7:
335:
10:
579:
399:
307:(NIMT) in the locality of
290:
286:
282:
240:
232:
228:
223:
219:
211:
203:
198:
190:
182:
174:
166:
161:
153:
145:
131:
121:
84:
72:
67:
55:
45:
34:
510:Rails out of the Capital
325:is part of Wellington's
531:, 30 June 2015, page 9.
411:(EMUs) ordered for the
409:Electric Multiple Units
362:electric multiple units
329:suburban rail network.
140:North Island Main Trunk
76:Dolly Varden Crescent,
317:suburb of the city of
80:, Porirua, New Zealand
528:2014/15 Annual Report
372:carriage trains, the
297:Mana railway station
106:41.0955°S 174.8682°E
18:Mana Railway Station
346:Transdev Wellington
237:Transdev Wellington
102: /
68:General information
489:www.metlink.org.nz
463:www.metlink.org.nz
374:Capital Connection
241:Following station
233:Preceding station
191:Bicycle facilities
111:-41.0955; 174.8682
378:Northern Explorer
294:
293:
278:
277:
16:(Redirected from
570:
532:
523:
517:
506:
500:
499:
497:
495:
481:
475:
473:
471:
469:
455:
413:Hutt Valley Line
360:are operated by
230:
229:
207:5 September 1949
117:
116:
114:
113:
112:
107:
103:
100:
99:
98:
95:
60:
32:
31:
21:
578:
577:
573:
572:
571:
569:
568:
567:
538:
537:
536:
535:
524:
520:
507:
503:
493:
491:
483:
482:
478:
474:
467:
465:
457:
456:
449:
444:
402:
394:
382:KiwiRail Scenic
368:(Matangi). Two
338:
303:section of the
274:
254:
175:Platform levels
138:section of the
110:
108:
104:
101:
96:
93:
91:
89:
88:
63:
41:
40:
39:
28:
23:
22:
15:
12:
11:
5:
576:
566:
565:
560:
555:
550:
534:
533:
518:
501:
476:
446:
445:
443:
440:
436:
435:
401:
398:
393:
390:
337:
334:
292:
291:
288:
287:
284:
283:
280:
279:
276:
275:
269:
264:
262:
257:
255:
249:
243:
242:
239:
234:
226:
225:
221:
220:
217:
216:
213:
209:
208:
205:
201:
200:
196:
195:
192:
188:
187:
184:
180:
179:
176:
172:
171:
168:
167:Structure type
164:
163:
159:
158:
155:
151:
150:
147:
143:
142:
133:
129:
128:
123:
119:
118:
86:
82:
81:
74:
70:
69:
65:
64:
61:
53:
52:
43:
42:
37:
36:
35:
26:
9:
6:
4:
3:
2:
575:
564:
561:
559:
556:
554:
551:
549:
546:
545:
543:
530:
529:
522:
515:
511:
505:
490:
486:
480:
464:
460:
454:
452:
447:
439:
432:
431:
430:
427:
425:
424:
423:Barnaby Rudge
419:
414:
410:
407:
397:
389:
385:
383:
379:
375:
371:
370:diesel-hauled
367:
363:
359:
355:
351:
347:
343:
333:
330:
328:
324:
320:
316:
312:
311:
306:
302:
298:
289:
285:
281:
273:
268:
265:
263:
261:
258:
256:
253:
248:
245:
244:
238:
231:
227:
222:
218:
214:
210:
206:
202:
197:
193:
189:
185:
181:
177:
173:
169:
165:
160:
156:
152:
148:
144:
141:
137:
134:
130:
127:
124:
120:
115:
87:
83:
79:
75:
71:
66:
59:
54:
51:
50:suburban rail
48:
44:
33:
30:
19:
527:
521:
509:
504:
492:. Retrieved
488:
479:
466:. Retrieved
462:
437:
428:
421:
418:Dolly Varden
403:
395:
386:
339:
331:
308:
296:
295:
162:Construction
157:Mainline (2)
29:
512:pp. 62,71 (
494:21 December
468:21 December
366:FT/FP class
342:Kapiti Line
323:New Zealand
301:Kapiti Line
260:Kapiti Line
136:Kapiti Line
109: /
97:174°52′06″E
85:Coordinates
542:Categories
508:Hoy, D.G.
442:References
406:DM/D class
392:Facilities
350:Wellington
272:Wellington
247:Plimmerton
94:41°05′44″S
149:Dual side
146:Platforms
548:Paremata
376:and the
358:Waikanae
336:Services
315:Paremata
270:towards
267:Paremata
252:Waikanae
250:towards
224:Services
122:Owned by
73:Location
516:, 1970)
400:History
364:of the
354:Porirua
327:Metlink
319:Porirua
313:in the
299:on the
212:Rebuilt
199:History
183:Parking
170:Shelter
132:Line(s)
47:Metlink
204:Opened
154:Tracks
514:NZRLS
434:deck.
215:1960?
496:2019
470:2019
352:and
310:Mana
78:Mana
38:Mana
426:).
356:or
194:Yes
186:Yes
544::
487:.
461:.
450:^
321:,
498:.
472:.
178:1
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.