the corridor will be completed by the end of 2017. The first U-girder, the concrete structure on which metro tracks are laid, was launched near Pathanwadi Junction in Malad on 2 May 2017. In total, Metro 7 required 1,400 U-girders. Work on erecting the U-girders, as well as disposal and dumping of muck generated from underground work was done only between 11:30 pm and 6:00 am. During this period, multi-axle trailers transported U-girders weighing 170 tonne from the casting yard in Bandra to the location where it is to be erected. The trailer had to move slowly to avoid causing imbalance to the heavy load which can result in toppling, and took roughly two hours to complete the journey. Lifting the girder and attaching it to the pier caps was also a difficult process and was carried out at night time. Traffic diversions were placed around the launching site to reduce the possibility of accidents. Officials erected an average of two girders every day.
1643:(EPC) model. The MMRDA invited bids for the project in December 2015. Tendering for the design and construction of the corridor was split into 3 packages. The first package included an elevated viaduct and 5 elevated stations – Andheri East, Shankarwadi, JVLR Junction, Mahanand and new Ashok Nagar. The second package included an elevated viaduct and 6 elevated stations – Aarey, Dindoshi, Pathan Wadi, Pushpa Park, Bandongri and Mahindra & Mahindra, and an elevated viaduct and 5 elevated stations – Magathane, Devipada, National Park, Ovaripada and Dahisar East. A total of 16 companies expressed interest, and 9 bids were submitted. In April 2016, the MMRDA awarded contracts to Simplex Infrastructure, J Kumar Infraprojects, and Nagarjuna Construction Company for the first, second and third packages respectively. The project is estimated to cost 5742: 5694: 5287: 2350:(ADB) will provide 43-48% of the total project cost through a loan at an interest rate of 1.4%. The Government of Maharashtra is the guarantor for the loan. On 2 March 2019, the Union Ministry of Finance stated that it signed a $ 926 million loan agreement with the ADB to fund the construction of Line 2 and Line 7. This was the single largest infrastructure loan ever extended by the ADB. The funds will be used to procure 63 six-car trainsets and for signaling and safety systems on both corridors. 1152: 1460:
that it had decided to terminate the proposed extension at the international airport and not extend it to the domestic terminal due to technical challenges. As the metro extension is proposed to be underground it would have to be constructed below or above Line 3 which also passes under the airport. Line 7A is 3.42 km (2.13 mi) long including a 2.49 km (1.55 mi) underground twin tunnel. The extension is partially elevated, running parallel to the Western Express Highway and
5638: 1718:(along with the section of Line 2 from Dhanukarwadi to Dahisar East ) was opened on 2 April 2022. Chief Minister Uddhav Thackeray flagged off the first train at 4pm in the presence of Deputy Chief Minister Ajit Pawar, Urban Development Minister Eknath Shinde, NCP chief Sharad Pawar and the Leader of Opposition in the Legislative Council, Pravin Darekar. The line opened for public service from 8pm, with services operating between Aarey and Dahanukarwadi (on Line 2) via Dahisar East. 1229: 1188: 421: 392: 1170: 1005: 912: 845: 806: 530: 414: 1270: 1109: 1028: 971: 829: 496: 1090: 478: 471: 384: 340: 1661:
corridor had been completed. By the end of April 2017, 25% of piling work, 60% of barricading work and 77% of the soil testing for pier foundation had been completed. Line 7 stations were built on a single pier, unlike the three piers used to support stations on Line 1. The single pier design was chosen to facilitate the construction of smaller stations and reduce the amount of land occupied on the Western Express Highway which could obstruct traffic flow.
1236: 995: 537: 376: 1248: 1128: 863: 352: 1116: 1065: 428: 5314: 5433: 1043: 440: 987: 5677: 1711:
May, and the first trial runs were conducted from 31 May. The MMRDA began a dynamic test and trial run on the 20 km stretch between Dhanukarwadi and Aarey (including a portion of Line 2) on 19 June. The stretch between Dhanukarwadi and Aarey received provisional approval from the Research Designs and Standards Organisation (RDSO) in January 2022. The Commissioner of Metro Rail Safety (CMRS) began inspecting the line in February 2022.
945: 885: 837: 781: 756: 731: 706: 681: 656: 631: 606: 581: 556: 5324: 1214: 5552: 937: 815: 1196: 1160: 980: 927: 822: 504: 464: 1178: 1020: 919: 486: 5346: 1012: 5721: 1682:
deployed 318 labourers. The MMRDA had also issued a similar notice on 4 July 2017. By August 2017, about 600-700 metres of each package had been constructed, 63 piers and 22 girders had been erected, and barricades had been placed on 67% of the entire route. Track laying work on the line began in June 2019. The first escalator on Line 7 was installed at Bandongri station in August 2019.
2406:, Karnataka. The rakes are capable of driverless operation making them the first driverless metro trains to be made in India. BEML began manufacturing the coaches on 29 July 2019, built the first metro coach in 75 days and unveiled it in September 2019. The first trainset arrived in Mumbai on 28 January 2021. 1721:
The remaining section of Line 7 from Goregaon East to Gundavali received approval from the RDSO in October 2022. The CMRS began inspecting the line in December 2022. The final section of the line (along with the final section of Line 2A from Dhanukarwadi to Andheri West) was inaugurated on 19 January
1710:
MMRDA metropolitan commissioner R.A. Rajeev stated in September 2020 that almost 80% of construction work had been completed. The MMRDA began conducting pre-trials on the rolling stock at the Charkop depot in February 2021. The MMRDA announced that electrification of the line had been completed on 26
1685:
In January 2020, the MMRDA terminated the contract awarded to Simplex Infrastructure for the first package over delay in completing the work. The next month, the agency invited bids to replace Simplex. The work was split into two tenders including one for a 6.25km viaduct and another to complete work
1595:
to serve both Line 2 and Line 7 by building a ring metro line to connect the two corridors. The MMRDA utilized an empty plot of land located after Ovaripada station on Line 7 to build pillars for the link connecting the two lines. Line 2 of the Mumbai Metro connects Dahisar East with Andheri West. In
1459:
The extensions to Mira-Bhayander and the airport were officially announced by Chief Minister Fadnavis on 30 March 2017. The alignment for the extension from Andheri to Chhatrapati Shivaji Maharaj International Terminus was approved by the State Cabinet on 12 April 2017. In June 2018, the MMRDA stated
1409:
that had not been marked for replanting by metro authorities. Residents replanted these trees in their own housing societies, as well as at schools and other locations. Nearly 210 people and over 40 housing societies participated in the initiative coordinating their efforts through WhatsApp messages.
1669:
pipeline resulted in temporary disruptions in the supply of CNG to Kandivli, Borivli, Dahisar, Mira Road and Bhayander. Mahanagar Gas began repairing the pipeline on the evening of 31 March, and completed the work by the following evening. The BMC accused Nagarjuna Construction Company of illegally
1677:
would begin in April 2017. The agency had completed construction of piers on several sections of the corridor, and the viaducts will be built at locations where pier caps have been built. The first viaduct was constructed in the section between JVLR to Mahanand. Construction of all pier caps along
1660:
Construction work on the corridor began on 8 August 2016. The contractors were expected to complete construction of the corridor and all 14 stations within 30 months from the day of commencement of work. On 18 February 2017, MMRDA officials stated that 15% of piling, pile caps and pier work on the
1440:
In February 2017, the MMRDA announced that the DMRC was preparing a detailed project report (DPR) on a proposed 9 km (5.6 mi) extension of Line 7 from Dahisar to Bhayander, via Mira Road. The extension would have 9 stations, with an inter-station distance of 1 km (0.62 mi). The
1421:
and the MMRDA signed a formal agreement on 24 April 2017. In June 2017, the Maharashtra Government transferred three plots of land at Aarey Colony, measuring a total of 20,387 sqm (5.03 acres), to the MMRDA for a labour camp and a casting yard for Line 7, and a centralised operation centre for the
1681:
The MMRDA issued notices to all three contractors working on the project on 11 August 2017 over the "poor progress" of work. The agency stated that the although contractors were required to deploy 600 workers each, Simplex had only deployed 320, J Kumar Infraprojects had deployed 395, and NCC had
2453:. The MMRDA signed an agreement with Adani Electricity Mumbai Limited to supply electricity to Line 7 and Line 2A on 2 December 2022. Around 120 million units is required to power both lines. MMRDA plans to install solar panels on the roofs of 13 stations on Line 7 to generate 2,000 kW of power. 1730:
Line 7A is a 3.42 km (2.13 mi) southward extension of Line 7 to Chhatrapati Shivaji Maharaj International Airport, with 2 stations. The section includes a 0.93 km (0.58 mi) elevated stretch and 2.49 km (1.55 mi) long twin tunnels. The MMRDA awarded the construction
1664:
On 14 March 2017, the Mumbai High Court temporarily stayed all construction activities at Metro 7's casting yard in Bandra Reclamation. The Court was hearing a PIL filed by Mohammed Furqan Ali Mohammed Qureshi who alleged that the site of the casting yard had been reserved by the Brihanmumbai
1425:
In February 2020, MMRDA metropolitan commissioner R.A. Rajeev stated that Line 7 would be identified as the Red Line. A study by World Resources Institute (WRI) India, published in May 2021, estimated that Line 7 and Line 2A had the potential to create 1.1 million jobs in the city.
2402:(US$ 360 million) contract to supply 378 metro cars (63 trainsets) for Line 7 and Line 2 in November 2018. An additional 126 metro cars (21 trainsets) were ordered from BEML to cater to metro extensions. All trainsets were manufactured at BEML's Rail Coach Factory in 2409:
Each trainset is made up of 6 coaches with a total passenger capacity of 1,660 and dense crush load capacity of 2,092. The trainset is 3.2 metres wide, made of stainless steel and each coach has 4 doors on each side. The rake employs a regenerative braking system.
2483:
The MMRDA plans to build 14 foot overbridges on Line 7 to enhance connectivity for commuters. The overbridges will be constructed in three phases. The first foot overbridge at Gundavali station was completed on 29 November 2022.
5153: 1395:(US$ 7.7 billion). The MMRDA approved the detailed project report for Line 7 in August 2015. The report proposed a 16.5 km (10.3 mi) elevated line between Andheri East and Dahisar East at an estimated cost of 3307: 1441:
line would run parallel to the Surat-Dahisar Highway, then turn left at Kashi Mira Junction, before passing through Mira Road-Bhayander, and terminating at Golden Nest Circle in Bhayander. The project is estimated to cost
1596:
November 2021, the MMRDA cancelled the plan to build the depot at Dahisar and instead proposed building the depot for Lines 7, 7A and 9 at Rai Murdhe in Bhayandar. The MMRDA received 59.63 hectares of land at
4616: 4877: 2708: 3857: 3393: 4401: 1422:
metro system. In November 2021, the MMRDA cancelled the plan to build the line's depot at Dahisar and instead proposed building the depot for Line 7, and its extensions, at Rai Murdhe in Bhayandar.
5127: 3964: 1734:
Tunneling work began on 1 September 2023. The twin tunnels are located at depths ranging between 6 metres and 20 metres to ensure a smooth transition with the elevated section of the line. Two
2968: 3230: 5847: 5842: 3886: 2426:(CBTC) signalling system. Alstom was awarded a EUR90 million contract to supply the signalling and telecommunications systems for Mumbai Metro Line 2 and Line 7, as well as Pune Metro's 4954: 2682: 4108: 4543: 3101: 3938: 3441: 2760: 4375: 2377:(US$ 41 million) to the DMRC to implement and commission rolling stock, signalling and telecommunication work for the Metro 2A and Metro 7 corridors on 26 November 2016. 1464:, and goes underground just ahead of the vehicular underpass of Sahar Elevated Road. The Maharashtra Cabinet approved the implementation of both extensions in September 2018. 3359: 5827: 4193: 4049: 5852: 3990: 1623:
via Dahisar East. The Charkop depot currently serves as the depot for Line 2 and Line 7. The under construction Mandale depot will be used to serve Line 2 once completed.
2786: 1700:(US$ 15 million) contract to J Kumar Infraprojects and Nagarjuna Construction Company respectively to complete the work. The MMRDA also encashed a bank guarantee of 5862: 4435: 2994: 4903: 3333: 3046: 5857: 4642: 3475: 2579: 4719: 5083: 4800: 4323: 3255: 4297: 3780: 2501: 1731:
contract to J. Kumar Infrastructure. Work on the extension began in March 2020. Around 25% of the work on the airport extension was completed by November 2022.
1665:
Municipal Corporation (BMC) for use as a Sunni Muslim cemetery. Piling work in Kandivli resulted in a gas pipeline bursting on 29 March 2017. The damage to the
1449: 5005: 4513: 3727: 3385: 2630: 1384:
An 18 km (11 mi) metro line connecting Andheri East and Dahisar East was proposed as Line 7 in the original Mumbai Metro master plan unveiled by the
4667: 3021: 4167: 4075: 5031: 3552: 2942: 4980: 3805: 4271: 4245: 5651: 3501: 1453: 1339: 4488: 3624: 2864: 2838: 1357:
in Andheri (East) was inaugurated on 19 January 2023. An under construction 11.386 km section of Line 7, from Bhayander to Dahisar, is part of
4349: 2916: 2605: 2475:
From 1 May 2023, a 25% discount on ticket fare was implemented for senior citizens (over 65 years), disabled persons, and students up to Class 12.
1385: 47: 4460: 3831: 3416: 5102: 4219: 5212: 2656: 5896: 5522: 5496: 5255: 5056: 1342:
with 24 stations. The line is mostly elevated except for the 2.49 km (1.55 mi) underground twin tunnels at its southern terminus.
1388:(MMRDA) in 2004. In June 2015, the MMRDA proposed building Line 7 as part of a plan to build 6 new metro lines at a total estimated cost of 5656: 5613: 5491: 3573: 2890: 5186: 3203: 3075: 2553: 1591:. However, land acquisition for the Dahisar depot was delayed by litigation filed in 2016. In 2020, the MMRDA proposed using the depot at 6085: 5607: 4141: 3753: 3676: 3281: 2734: 4693: 5571: 4016: 4851: 6090: 1640: 3526: 2943:"Maharashtra government to extend Mumbai Metro corridors to Mira-Bhayandar | Latest News & Updates at Daily News & Analysis" 3701: 2812: 3912: 1448:(US$ 430 million). In March 2017, the MMRDA stated that the DMRC was conducting a feasibility study to extend the line to 5486: 5481: 5476: 1405:
Over the course of two weeks in March–April 2017, Mumbai residents saved nearly 4,000 plants growing on dividers and along the
1707:(US$ 4.2 million) provided by Simplex. Simplex had completed around 75% of work at the time its contract was terminated. 6080: 5997: 4745: 3598: 1036: 4826: 3127: 2527: 5583: 3650: 2657:"Study of building height restrictions near Mumbai airport soon | Latest News & Updates at Daily News & Analysis" 5619: 5595: 4772: 2423: 1414: 6012: 5889: 5662: 5248: 2297: 1550: 1208: 5555: 2443: 285: 1372:'s depot at Charkop, due to an issue acquiring land for a depot. Services currently operate between Gundavali and 5601: 5577: 5817: 5984: 5939: 5908: 3153: 2813:"Bidding for Metro 10 line to start later this year | Latest News & Updates at Daily News & Analysis" 2196: 1998: 856: 592: 5154:"Mumbai: 25% fare concession on Metro 2A and 7 for senior citizens, divyang persons and students from May 1" 4878:"Mumbai Metro gets first 'Make in India' driverless metro cars with bi-cycle parking facility; details here" 3178: 2360:(US$ 430 million), and the underground extension to the International Airport shall cost an additional 6005: 5882: 5832: 5822: 5707: 5447: 5241: 2275: 1076: 314: 2461:
A consortium of Indian company Datamatics and Italian company AEP Ticketing solutions S.R.L was awarded a
6075: 5979: 5812: 2174: 1608: 1418: 792: 5924: 5332: 1939: 1738:(TBM) were utilized to build the tunnels. Tunneling work is expected to be completed by December 2024. 1620: 1612: 1500: 1461: 1373: 1350: 1346: 516: 83: 4402:"PM Narendra Modi inaugurates Mumbai Metro lines 2A and 7; what you need to know about the new routes" 5702: 5589: 2469: 4929: 5354: 5337: 2427: 1417:
approved the transfer of 40 acres of land in Dahisar for the construction of the metro depot. The
5994: 5949: 5934: 5837: 5471: 4617:"MMRDA approves cost hike for two packages of Mumbai Metro-7, but says overall cost won't be hit" 2247: 2042: 1976: 1616: 1545: 1526: 1406: 1354: 957: 642: 567: 280: 88: 2353:
The proposed extension of Line 7 from Dahisar to Bhayander (called Line 9) is estimated to cost
5969: 5944: 5712: 5359: 3858:"In pics: CM puts Mumbai's Metro 7 on right track; western express highway opens after 5 hours" 2431: 2347: 2130: 2020: 742: 617: 2709:"Three plots at Mumbai's Aarey Milk Colony allotted for Andheri East-Dahisar Metro-7 corridor" 5927: 5503: 5388: 5383: 5378: 5300: 5295: 2319: 2309: 2259: 2208: 1959: 1951: 1735: 1435: 1369: 1358: 1252: 1132: 1047: 867: 444: 356: 3965:"Western Express Highway: Barricades for Metro 7 construction to be removed by next monsoon" 2580:"MMRDA sanctions Rs 35,400 cr for 118 km Mumbai metro network Andheri East and Dahisar East" 5959: 5954: 5533: 2086: 2064: 692: 667: 3527:"Days after MMRDA removes contractor: Three bidders in race for Metro line 7 construction" 3360:"Metro Line 2A to use Charkop depot till work on Line 2B & Mandale depot is completed" 1603:
Line 2 and Line 7 were both commissioned on 2 April 2022, with services operating between
8: 5989: 5974: 5964: 5398: 2446: 2225: 2152: 2108: 1715: 1604: 1521: 1505: 896: 767: 717: 5032:"Adani Electricity to power Mumbai Metro Lines 2A & 7 connecting Andheri to Dahisar" 4514:"Mumbai Metro 7A Update: Tunnelling Work Begins For Line Connecting CSMIA And Gundavali" 4376:"Supervision of Mumbai Metro Lines 2A and 7 by Commission of Metro Rail Safety underway" 2502:"Two Mumbai Metro lines report record single-day ridership of 2.14 lakh amid heavy rain" 5265: 5233: 5128:"Datamatics Wins Automated Fare Collection Contract for Mumbai Metro Line 2A, 2B and 7" 3557: 4955:"Alstom to provide state-of-the-art signalling system for Mumbai Metro and Pune Metro" 3553:"Metro VII work begins today, may hit WEH traffic | Mumbai News - Times of India" 5775: 5317: 5161: 4409: 4116: 4083: 4024: 3449: 3334:"PM Narendra Modi to inaugurate Mumbai Metro Lines 2A, 7 today: All you need to know" 2450: 3231:"Obstacles in getting car shed at Dahisar gives birth to a semi-circular metro line" 2969:"Will extend Metro network to Mira-Bhayandar and airport: Maha CM Devendra Fadnavis" 1670:
operating an unlicensed concrete ready mix plant at its casting yard in April 2017.
5785: 1929: 1924: 1213: 1650:(US$ 740 million). The contract awarded to Simplex Infrastructure was worth 1639:
during his visit to Mumbai on 11 October 2015. Line 7 was implemented through the
1615:. Both lines were extended on 19 January 2023, providing circular service between 5508: 5436: 4594: 4569: 4436:"PM Modi to inaugurate Mumbai Metro Rail Lines 2A and 7 on 19 January. 10 points" 3476:"Simplex Infra, JKumar, NCC to develop Mumbai's Metro-7 corridor - ET RealEstate" 3256:"Work on Mumbai Metro lines 2A, 7 delayed, likely to start operation by Jan 2022" 2995:"Metro to extend to Mira-Bhayander and airport: Chief Minister Devendra Fadnavis" 5057:"Metro stations on Lines 2A, 7, Charkop depot to soon have rooftop solar panels" 110: 5741: 5685: 5668: 5511: 4465: 4109:"Mumbai: Two new contractors appointed for balance civil works on Metro Line 7" 3887:"Hoping to open Mumbai Metro 7 by 2019, Maharashtra to invite bids for coaches" 3677:"Bombay High Court stalls Metro 7 work over burial ground | Free Press Journal" 2531: 1894:
Line 7 has 14 operational stations, with two more stations under construction.
272: 5693: 5286: 4720:"Mumbai Trans-Harbour Link: MMRDA approves appointment of general consultants" 6069: 5770: 5165: 4489:"Mumbai: Here is latest update of more than dozen Metro projects in the city" 4413: 4120: 4087: 4028: 3453: 1666: 1636: 1361:. A southward extension to the airport is also currently under construction. 1319: 288: 126: 4643:"Asian Development Bank To Lend $ 926 Million For Mumbai Metro Rail Project" 5905: 5646: 5637: 5412: 5373: 5327: 5290: 2683:"Airports authority to give land for Metro-7 car shed at Dahisar in Mumbai" 1315: 136: 5084:"Datamatics wins AFC System contract for Mumbai Metro Line 2A, 2B & 7" 5762: 4801:"Mumbai: Manufacturing of coaches commences for Metro Lines 2A, 2B and 7" 1327: 244: 69: 5874: 3939:"MMRDA issues notices to Mumbai Metro 7 contractors for 'poor progress'" 5797: 5765: 5432: 5395: 5349: 5313: 5213:"Mumbai: MMRDA completes 58m-long FOB linking 2 metro lines in 15 days" 4298:"Mumbai: CMRS starts inspection of Phase 1 of Metro corridors 2A and 7" 3625:"Mumbai Metro-7 line to have 14 stations along Western Express Highway" 2631:"Aviation ministry nod for Metro car depot in Dahisar - Times of India" 4827:"BEML delivers first India-made driverless metro cars to Mumbai Metro" 1334:. When completed, the 30.08 km (18.69 mi) line will connect 1247: 1127: 862: 351: 2865:"Plans to extend metro stations to Bhayander may be implemented soon" 2403: 1335: 151: 5676: 5551: 5323: 2787:"Metro lines 2A, 7 have potential to create 1.1 million jobs: Study" 1042: 439: 5790: 5780: 4570:"Mumbai Metropolitan Region Development Authority - Metro Line - 9" 3179:"Metro Line - 7 | Mumbai Metropolitan Region Development Authority" 5345: 4904:"Mumbai: 1st rake for Metro-2A arrives; CM to unveil it on Friday" 4194:"MMRDA to conduct test run for two elevated Metro lines next week" 4350:"Mumbai's Metro Line 2A, 7 clear designs & standards testing" 3806:"Within 10 months, Metro 7 moves to second stage of construction" 1674: 1592: 1588: 485: 477: 470: 463: 146: 4272:"Mumbai: Metro corridors 2A, 7 get RDSO provisional certificate" 4050:"Contractor expelled, MMRDA gives Metro-7 works at higher costs" 836: 828: 821: 814: 3991:"Work on track: MMRDA starts laying rail lines for Metro 2A, 7" 3308:"Government transfers vital land for depots of two metro lines" 2419: 1597: 1323: 65: 4246:"Mumbai: Dynamic trial run begins on Metro corridors 2A and 7" 1587:
The depot for Line 7 was originally proposed to be located at
1353:
was opened on 2 April 2022, and another section from Aarey to
5720: 4981:"Alstom bags Rs 700 crore contracts from Mumbai, Pune metros" 4773:"BEML bags Rs.3,015 Crore Contract for Mumbai Metro Corridor" 3728:"Pipeline bursts, gas supply to Mumbai's western suburbs hit" 1331: 3754:"Mumbai: Repair of MGL gas pipeline puncture to begin today" 2917:"Metro VII may extend to domestic airport - Times of India" 2392: 1365: 162: 4544:"Mumbai Metro 7A: Twin Tunnel Stretch Construction Begins" 4324:"Mumbai: Phase 1 of Metro Line 2A and 7 opened for public" 4076:"MMRDA terminates contracts for Metro Line 2B over delays" 3832:"Metro VII piers work to begin next week - Times of India" 3102:"Mumbai Metro 7A: Twin Tunnel Stretch Construction Begins" 3047:"Mumbai Metro 7 will not be extended to domestic terminal" 4461:"Mumbai: Work on second underground Metro line 7A begins" 5263: 2891:"Dahisar metro extension work to begin in December 2017" 2554:"Over 130 km of Metro lines to criss-cross city by 2020" 5006:"Adani to supply power for MMRDA's two new metro lines" 4220:"Mumbai: Trial run for Metro Line 2A and 7 flagged off" 4930:"BEML bags Rs3,015-cr order for Mumbai Metro Corridor" 3781:"Ready mix concrete plant for Metro 7 is illegal: BMC" 3386:"MMRDA invites civil work bids for two Metro projects" 1368:, with a headway of 10 minutes. Line 7 currently uses 1364:
The line is served by six-car trains, manufactured by
994: 986: 979: 926: 918: 911: 4668:"State clears extension of Metro 7 up to Terminal 2" 3022:"State clears extension of Metro 7 up to Terminal 2" 2606:"Mumbaikars save 4,000 plants on WEH from Metro axe" 1635:
ceremony for Line 7 was performed by Prime Minister
4168:"MMRDA begins pre-trials for Mumbai's Metro trains" 3702:"Metro work damages gas pipeline, accident averted" 3442:"MMRDA invites bids for Andheri-Dahisar metro line" 1019: 1011: 1004: 3502:"MMRDA awards contracts for Andheri-Dahisar metro" 3282:"Mumbai: MMRDA changes location of 2 Metro depots" 2735:"Mumbai: MMRDA changes location of 2 Metro depots" 1159: 1151: 5652:Chhatrapati Shivaji Maharaj International Airport 3076:"Tunneling work begins on Mumbai Metro's Line 7A" 1686:on 4 stations. In July 2020, the MMRDA awarded a 1454:Chhatrapati Shivaji Maharaj International Airport 1340:Chhatrapati Shivaji Maharaj International Airport 6067: 5187:"Metro 7 to get 14 FOBs to facilitate commuters" 4142:"Mumbai Metro 2A, 7 trials to start from Jan 14" 3204:"Charkop Car Depot To Now House Metro 7 and 2-A" 2468:(US$ 19 million) contract to implement the 1386:Mumbai Metropolitan Region Development Authority 309: 5103:"MMRDA finalises firm for AFC on 3 Metro lines" 4746:"General consultant appointed for MTHL project" 2472:system for Line 7 and Line 2 in February 2019. 1195: 1187: 383: 375: 3417:"Work on Mumbai Metro 7 to start by September" 2528:"Mmrda – Projects – Mumbai Metro Rail Project" 5890: 5249: 1741: 1177: 1169: 503: 495: 5614:Maharashtra State Road Transport Corporation 3473: 5608:Pune Mahanagar Parivahan Mahamandal Limited 3574:"Metro 7 contractors told to speed up work" 3499: 2839:"Mira-Bhayander to be connected with Metro" 2761:"Metro-2A will be Yellow line, 7 to be Red" 5897: 5883: 5572:Brihanmumbai Electric Supply and Transport 5256: 5242: 3599:"Northbound WEH lanes to be shut at night" 3493: 1600:from the state government in August 2023. 39:Operational (extension under construction) 5904: 5523:Mumbai–Ahmedabad high-speed rail corridor 3881: 3879: 1714:A section of Line 7 from Dahisar East to 1673:The MMRDA announced that construction of 1641:engineering, procurement and construction 4433: 3128:"Maha Cabinet clears Metro 7-A, 9 lines" 1582: 5134:. Press Trust of India. 8 February 2019 4852:"BEML starts work on Mumbai metro cars" 3913:"Metro takes up toughest task at night" 3778: 2603: 1228: 6068: 5100: 4017:"First escalator of Metro 7 installed" 3876: 3651:"Stay on metro casting yard at Bandra" 3572:Mishra, Lalatendu (18 February 2017). 3571: 3414: 1722:2023 by Prime Minister Narendra Modi. 844: 805: 413: 5878: 5237: 4795: 4793: 4538: 4536: 4534: 3500:Nandgaonkar, Satish (18 April 2016). 3396:from the original on 12 February 2017 3070: 3068: 2520: 1269: 1108: 1027: 970: 944: 936: 420: 391: 4770: 4587: 3019: 1482: 1089: 529: 339: 5584:Kalyan-Dombivli Municipal Transport 5081: 4771:Shah, Narendra (23 November 2018). 4453: 3154:"Mumbai To Get Two New Metro Lines" 2478: 1235: 536: 13: 6086:2022 establishments in Maharashtra 5620:Nagpur Mahanagar Parivahan Limited 5596:Mira-Bhayandar Municipal Transport 4790: 4595:"Line 7-Project Features-Stations" 4531: 3352: 3146: 3120: 3065: 2456: 2424:communications-based train control 1115: 1064: 427: 14: 6102: 6037:Charkop & Bhayandar (Planned) 5663:Navi Mumbai International Airport 5101:Mahale, Ajeet (7 February 2019). 2530:. Mmrdamumbai.org. Archived from 2382: 1573:19.92 kilometers (12.38 mi) 6091:25 kV AC railway electrification 5740: 5719: 5692: 5675: 5636: 5550: 5431: 5344: 5322: 5312: 5285: 5205: 5179: 5146: 5120: 5094: 3415:Mishra, Lalatendu (4 May 2016). 2387: 1268: 1246: 1234: 1227: 1212: 1194: 1186: 1176: 1168: 1158: 1150: 1126: 1114: 1107: 1088: 1063: 1041: 1026: 1018: 1010: 1003: 993: 985: 978: 969: 943: 935: 925: 917: 910: 884: 883: 861: 843: 835: 827: 820: 813: 804: 780: 779: 755: 754: 730: 729: 705: 704: 680: 679: 655: 654: 630: 629: 605: 604: 580: 579: 555: 554: 535: 528: 502: 494: 484: 476: 469: 462: 438: 426: 419: 412: 390: 382: 374: 350: 338: 5602:Vasai-Virar Municipal Transport 5578:Navi Mumbai Municipal Transport 5075: 5049: 5024: 4998: 4973: 4947: 4922: 4896: 4870: 4844: 4819: 4764: 4738: 4712: 4694:"Consultant for MTHL finalized" 4686: 4660: 4635: 4609: 4562: 4506: 4481: 4427: 4394: 4368: 4342: 4316: 4290: 4264: 4238: 4212: 4186: 4160: 4134: 4101: 4068: 4042: 4009: 3983: 3957: 3931: 3905: 3850: 3824: 3798: 3779:Dhupkar, Alka (16 April 2017). 3772: 3746: 3720: 3694: 3669: 3643: 3617: 3591: 3565: 3545: 3519: 3467: 3434: 3408: 3378: 3326: 3300: 3274: 3248: 3228: 3222: 3196: 3171: 3094: 3039: 3013: 2987: 2961: 2935: 2909: 2883: 2857: 2831: 2805: 2779: 2753: 2727: 2604:Anthony, Hepzi (5 April 2017). 1626: 1555:3.42 kilometers (2.13 mi) 3020:Naik, Yogesh (12 April 2017). 2701: 2675: 2649: 2623: 2597: 2572: 2546: 2494: 1510:10.7 kilometers (6.6 mi) 1376:(on Line 2) via Dahisar East. 1: 2487: 2449:, with power provided via an 2413: 1825:Utility Identification Works 1531:5.8 kilometers (3.6 mi) 1429: 6081:Railway lines opened in 2022 5708:Chhatrapati Shivaji Terminus 4434:Livemint (18 January 2023). 2346:(US$ 740 million). The 2339:Line 7 is estimated to cost 7: 1889: 1419:Airports Authority of India 1379: 1366:Bharat Earth Movers Limited 1345:A section of the line from 223:16.5 km (10.3 mi) 10: 6107: 1899: 1742:Current status for Line 7A 1725: 1693:(US$ 21 million) and 1433: 1415:Ministry of Civil Aviation 1322:metro line in the city of 6045: 6022: 5915: 5806: 5733: 5703:Chinchwad railway station 5629: 5590:Thane Municipal Transport 5564: 5542: 5459: 5424: 5273: 2470:automated fare collection 2442:Line 7 is electrified at 1918: 1915: 1912: 1909: 1906: 1880: 1867: 1854: 1844: 1838: 1833: 1810: 1808:Soil Investigation Works 1793: 1791:Barricading board fixing 1782: 1754: 1751: 1748: 1493: 1485: 1469: 1277: 1262: 1243: 1221: 1207: 1142: 1123: 1101: 1097: 1082: 1075: 1057: 1035: 963: 956: 902: 895: 877: 855: 798: 791: 773: 766: 748: 741: 723: 716: 698: 691: 673: 666: 648: 641: 623: 616: 598: 591: 573: 566: 548: 544: 522: 515: 454: 435: 406: 399: 366: 347: 332: 294: 279: 243: 235: 227: 219: 214: 196: 181: 176: 168: 158: 142: 132: 122: 117: 105: 97: 76: 61: 53: 43: 35: 30: 23: 5448:Salsette–Trombay Railway 4574:mmrda.maharashtra.gov.in 3183:mmrda.maharashtra.gov.in 2437: 1488: 1479: 1476: 1402:(US$ 570 million). 5472:Mumbai Suburban Railway 5132:Business Standard India 2367:(US$ 72 million). 2334: 1657:(US$ 42 million). 1407:Western Express Highway 1037:Western Express Highway 185:8 August 2016 6054:are Under Construction 5713:Nagpur railway station 2348:Asian Development Bank 1736:tunnel boring machines 5504:Pune Suburban Railway 1755:Status for year 2021 1583:Depot and Line 2 link 1436:Line 9 (Mumbai Metro) 1434:Further information: 202:; 2 years ago 5534:Greater Nashik Metro 3448:. 16 December 2015. 2418:Line 7 utilises the 2315:(Under Construction) 2214:(Under Construction) 1965:(Under Construction) 1953:Line 2 - Yellow Line 1570:CSMIA International 446:Line 2 - Yellow Line 6013:CSMIA International 4408:. 19 January 2023. 4200:. IANS. 26 May 2021 4148:. 11 September 2020 4082:. 4 February 2020. 3134:. 12 September 2018 2370:The MMRDA allotted 2305:Under Construction 2298:CSMIA International 2283:Under Construction 1551:CSMIA International 1542:Under Construction 1462:Sahar Elevated Road 1413:In April 2017, the 1209:CSMIA International 172:212,000 (July 2023) 6076:Mumbai Metro lines 5753:Uran - Elephanta; 5517:Under construction 5492:Trans-Harbour_line 5460:Commuter/intercity 5369:Under construction 5217:Free Press Journal 5191:The Indian Express 5158:The Economic Times 5088:www.datamatics.com 5061:The Indian Express 5036:Free Press Journal 4884:. 8 September 2019 4752:. 25 November 2016 4726:. 26 November 2016 4724:The Indian Express 4700:. 26 November 2016 4698:The Times of India 4550:. 5 September 2023 4518:Free Press Journal 4493:Free Press Journal 4406:The Economic Times 4382:. 30 November 2022 4380:The Indian Express 4354:The Indian Express 4328:The Indian Express 4304:. 20 February 2022 4302:The Indian Express 4276:The Indian Express 4250:The Indian Express 4224:The Indian Express 4174:. 25 February 2021 4146:The Indian Express 4113:The Times of India 4023:. 13 August 2019. 3969:The Indian Express 3917:The Indian Express 3836:The Times of India 3810:The Indian Express 3706:The Indian Express 3681:Free Press Journal 3558:The Times of India 3533:. 29 February 2020 3531:The Indian Express 3474:www.ETRealty.com. 3446:The Economic Times 3392:. 5 January 2017. 3390:The Times of India 3366:. 28 December 2022 3364:The Indian Express 3338:The Indian Express 3288:. 18 November 2021 3286:The Indian Express 3262:. 4 September 2020 3260:The Indian Express 3210:. 10 February 2020 3108:. 5 September 2023 3082:. 5 September 2023 3080:The Indian Express 2999:The Indian Express 2921:The Times of India 2897:. 25 February 2017 2871:. 25 February 2017 2845:. 25 February 2017 2843:The Times of India 2767:. 29 February 2020 2741:. 18 November 2021 2739:The Indian Express 2635:The Times of India 2558:The Indian Express 2311:Line 3 - Aqua Line 2302:छ.शि.म.आं.वि. ट-२ 2261:Line 1 - Blue Line 1772:30 September 2021 1134:Line 3 - Aqua Line 1049:Line 1 - Blue Line 6063: 6062: 5917:Line 7 - Red Line 5872: 5871: 5776:Electric rickshaw 5318:Navi Mumbai Metro 5160:. 29 April 2023. 5012:. 2 December 2022 4985:Construction Week 4910:. 28 January 2021 4623:. 6 December 2020 4356:. 13 October 2022 4278:. 29 January 2022 3340:. 14 January 2023 2584:Business Standard 2451:overhead catenary 2380: 2332: 2331: 1887: 1886: 1580: 1579: 1312:Line 7 (Red Line) 1309: 1308: 1305: 1304: 1301: 1300: 1297: 1296: 200:2 April 2022 25:Line 7 (Red Line) 16:Mumbai Metro line 6098: 6034: 6000: 5930: 5899: 5892: 5885: 5876: 5875: 5786:Vehicle for hire 5746:Water ferry/roro 5744: 5723: 5696: 5679: 5640: 5554: 5435: 5425:Other urban rail 5348: 5326: 5316: 5289: 5258: 5251: 5244: 5235: 5234: 5228: 5227: 5225: 5223: 5209: 5203: 5202: 5200: 5198: 5183: 5177: 5176: 5174: 5172: 5150: 5144: 5143: 5141: 5139: 5124: 5118: 5117: 5115: 5113: 5098: 5092: 5091: 5082:Release, Press. 5079: 5073: 5072: 5070: 5068: 5053: 5047: 5046: 5044: 5042: 5028: 5022: 5021: 5019: 5017: 5002: 4996: 4995: 4993: 4991: 4977: 4971: 4970: 4968: 4966: 4959:Financialexpress 4951: 4945: 4944: 4942: 4940: 4926: 4920: 4919: 4917: 4915: 4900: 4894: 4893: 4891: 4889: 4882:Financialexpress 4874: 4868: 4867: 4865: 4863: 4848: 4842: 4841: 4839: 4837: 4823: 4817: 4816: 4814: 4812: 4797: 4788: 4787: 4785: 4783: 4768: 4762: 4761: 4759: 4757: 4742: 4736: 4735: 4733: 4731: 4716: 4710: 4709: 4707: 4705: 4690: 4684: 4683: 4681: 4679: 4664: 4658: 4657: 4655: 4653: 4639: 4633: 4632: 4630: 4628: 4613: 4607: 4606: 4604: 4602: 4591: 4585: 4584: 4582: 4580: 4566: 4560: 4559: 4557: 4555: 4540: 4529: 4528: 4526: 4524: 4510: 4504: 4503: 4501: 4499: 4485: 4479: 4478: 4476: 4474: 4457: 4451: 4450: 4448: 4446: 4431: 4425: 4424: 4422: 4420: 4398: 4392: 4391: 4389: 4387: 4372: 4366: 4365: 4363: 4361: 4346: 4340: 4339: 4337: 4335: 4320: 4314: 4313: 4311: 4309: 4294: 4288: 4287: 4285: 4283: 4268: 4262: 4261: 4259: 4257: 4242: 4236: 4235: 4233: 4231: 4216: 4210: 4209: 4207: 4205: 4190: 4184: 4183: 4181: 4179: 4164: 4158: 4157: 4155: 4153: 4138: 4132: 4131: 4129: 4127: 4105: 4099: 4098: 4096: 4094: 4072: 4066: 4065: 4063: 4061: 4046: 4040: 4039: 4037: 4035: 4013: 4007: 4006: 4004: 4002: 3987: 3981: 3980: 3978: 3976: 3971:. 18 August 2017 3961: 3955: 3954: 3952: 3950: 3945:. 19 August 2017 3935: 3929: 3928: 3926: 3924: 3909: 3903: 3902: 3900: 3898: 3883: 3874: 3873: 3871: 3869: 3854: 3848: 3847: 3845: 3843: 3828: 3822: 3821: 3819: 3817: 3802: 3796: 3795: 3793: 3791: 3776: 3770: 3769: 3767: 3765: 3750: 3744: 3743: 3741: 3739: 3724: 3718: 3717: 3715: 3713: 3698: 3692: 3691: 3689: 3687: 3673: 3667: 3666: 3664: 3662: 3647: 3641: 3640: 3638: 3636: 3631:. 2 January 2018 3621: 3615: 3614: 3612: 3610: 3595: 3589: 3588: 3586: 3584: 3569: 3563: 3562: 3561:. 7 August 2016. 3549: 3543: 3542: 3540: 3538: 3523: 3517: 3516: 3514: 3512: 3497: 3491: 3490: 3488: 3486: 3471: 3465: 3464: 3462: 3460: 3438: 3432: 3431: 3429: 3427: 3412: 3406: 3405: 3403: 3401: 3382: 3376: 3375: 3373: 3371: 3356: 3350: 3349: 3347: 3345: 3330: 3324: 3323: 3321: 3319: 3314:. 11 August 2023 3304: 3298: 3297: 3295: 3293: 3278: 3272: 3271: 3269: 3267: 3252: 3246: 3245: 3243: 3241: 3226: 3220: 3219: 3217: 3215: 3200: 3194: 3193: 3191: 3189: 3175: 3169: 3168: 3166: 3164: 3150: 3144: 3143: 3141: 3139: 3124: 3118: 3117: 3115: 3113: 3098: 3092: 3091: 3089: 3087: 3072: 3063: 3062: 3060: 3058: 3043: 3037: 3036: 3034: 3032: 3017: 3011: 3010: 3008: 3006: 2991: 2985: 2984: 2982: 2980: 2965: 2959: 2958: 2956: 2954: 2939: 2933: 2932: 2930: 2928: 2913: 2907: 2906: 2904: 2902: 2887: 2881: 2880: 2878: 2876: 2861: 2855: 2854: 2852: 2850: 2835: 2829: 2828: 2826: 2824: 2809: 2803: 2802: 2800: 2798: 2783: 2777: 2776: 2774: 2772: 2757: 2751: 2750: 2748: 2746: 2731: 2725: 2724: 2722: 2720: 2705: 2699: 2698: 2696: 2694: 2679: 2673: 2672: 2670: 2668: 2653: 2647: 2646: 2644: 2642: 2627: 2621: 2620: 2618: 2616: 2601: 2595: 2594: 2592: 2590: 2576: 2570: 2569: 2567: 2565: 2550: 2544: 2543: 2541: 2539: 2534:on 19 March 2012 2524: 2518: 2517: 2515: 2513: 2498: 2479:Foot overbridges 2467: 2465: 2401: 2399: 2379: 2376: 2374: 2366: 2364: 2359: 2357: 2345: 2343: 2324: 2322: 2314: 2312: 2264: 2262: 2213: 2211: 2003:राष्ट्रीय उद्यान 1964: 1962: 1956: 1954: 1902: 1897: 1896: 1746: 1745: 1706: 1704: 1699: 1697: 1692: 1690: 1656: 1654: 1649: 1647: 1518:19 January 2023 1467: 1466: 1447: 1445: 1401: 1399: 1394: 1392: 1272: 1271: 1257: 1255: 1250: 1238: 1237: 1231: 1230: 1216: 1198: 1197: 1190: 1189: 1180: 1179: 1172: 1171: 1162: 1161: 1154: 1153: 1137: 1135: 1130: 1118: 1117: 1111: 1110: 1092: 1091: 1067: 1066: 1052: 1050: 1045: 1030: 1029: 1022: 1021: 1014: 1013: 1007: 1006: 997: 996: 989: 988: 982: 981: 973: 972: 947: 946: 939: 938: 929: 928: 921: 920: 914: 913: 887: 886: 872: 870: 865: 847: 846: 839: 838: 831: 830: 824: 823: 817: 816: 808: 807: 783: 782: 758: 757: 733: 732: 708: 707: 683: 682: 658: 657: 633: 632: 608: 607: 583: 582: 558: 557: 539: 538: 532: 531: 506: 505: 498: 497: 488: 487: 480: 479: 473: 472: 466: 465: 449: 447: 442: 430: 429: 423: 422: 416: 415: 394: 393: 386: 385: 378: 377: 361: 359: 354: 342: 341: 330: 329: 310: 296: 295: 275: 269: 267: 266: 262: 259: 251: 228:Number of tracks 210: 208: 203: 192: 190: 113: 21: 20: 6106: 6105: 6101: 6100: 6099: 6097: 6096: 6095: 6066: 6065: 6064: 6059: 6041: 6032: 6025: 6018: 5998: 5985:Jogeshwari East 5940:Rashtriya Udyan 5928: 5911: 5903: 5873: 5868: 5867: 5802: 5734:Misc. transport 5729: 5630:Major terminals 5625: 5560: 5538: 5509:Indian Railways 5497:Nerul–Uran line 5467:Revenue service 5455: 5437:Mumbai Monorail 5420: 5281:Revenue service 5269: 5262: 5232: 5231: 5221: 5219: 5211: 5210: 5206: 5196: 5194: 5193:. 30 March 2023 5185: 5184: 5180: 5170: 5168: 5152: 5151: 5147: 5137: 5135: 5126: 5125: 5121: 5111: 5109: 5099: 5095: 5080: 5076: 5066: 5064: 5055: 5054: 5050: 5040: 5038: 5030: 5029: 5025: 5015: 5013: 5010:Hindustan Times 5004: 5003: 4999: 4989: 4987: 4979: 4978: 4974: 4964: 4962: 4953: 4952: 4948: 4938: 4936: 4928: 4927: 4923: 4913: 4911: 4908:Hindustan Times 4902: 4901: 4897: 4887: 4885: 4876: 4875: 4871: 4861: 4859: 4850: 4849: 4845: 4835: 4833: 4825: 4824: 4820: 4810: 4808: 4807:. 1 August 2019 4799: 4798: 4791: 4781: 4779: 4777:Metro Rail News 4769: 4765: 4755: 4753: 4744: 4743: 4739: 4729: 4727: 4718: 4717: 4713: 4703: 4701: 4692: 4691: 4687: 4677: 4675: 4674:. 12 April 2017 4666: 4665: 4661: 4651: 4649: 4641: 4640: 4636: 4626: 4624: 4621:Hindustan Times 4615: 4614: 4610: 4600: 4598: 4593: 4592: 4588: 4578: 4576: 4568: 4567: 4563: 4553: 4551: 4542: 4541: 4532: 4522: 4520: 4512: 4511: 4507: 4497: 4495: 4487: 4486: 4482: 4472: 4470: 4459: 4458: 4454: 4444: 4442: 4432: 4428: 4418: 4416: 4400: 4399: 4395: 4385: 4383: 4374: 4373: 4369: 4359: 4357: 4348: 4347: 4343: 4333: 4331: 4322: 4321: 4317: 4307: 4305: 4296: 4295: 4291: 4281: 4279: 4270: 4269: 4265: 4255: 4253: 4244: 4243: 4239: 4229: 4227: 4218: 4217: 4213: 4203: 4201: 4192: 4191: 4187: 4177: 4175: 4172:Hindustan Times 4166: 4165: 4161: 4151: 4149: 4140: 4139: 4135: 4125: 4123: 4115:. 16 May 2020. 4107: 4106: 4102: 4092: 4090: 4074: 4073: 4069: 4059: 4057: 4054:Hindustan Times 4048: 4047: 4043: 4033: 4031: 4015: 4014: 4010: 4000: 3998: 3995:Hindustan Times 3989: 3988: 3984: 3974: 3972: 3963: 3962: 3958: 3948: 3946: 3943:Hindustan Times 3937: 3936: 3932: 3922: 3920: 3911: 3910: 3906: 3896: 3894: 3891:Hindustan Times 3885: 3884: 3877: 3867: 3865: 3862:Hindustan Times 3856: 3855: 3851: 3841: 3839: 3830: 3829: 3825: 3815: 3813: 3804: 3803: 3799: 3789: 3787: 3777: 3773: 3763: 3761: 3760:. 31 March 2017 3752: 3751: 3747: 3737: 3735: 3734:. 29 March 2017 3732:Hindustan Times 3726: 3725: 3721: 3711: 3709: 3708:. 30 March 2017 3700: 3699: 3695: 3685: 3683: 3675: 3674: 3670: 3660: 3658: 3657:. 15 March 2017 3649: 3648: 3644: 3634: 3632: 3623: 3622: 3618: 3608: 3606: 3597: 3596: 3592: 3582: 3580: 3570: 3566: 3551: 3550: 3546: 3536: 3534: 3525: 3524: 3520: 3510: 3508: 3498: 3494: 3484: 3482: 3472: 3468: 3458: 3456: 3440: 3439: 3435: 3425: 3423: 3413: 3409: 3399: 3397: 3384: 3383: 3379: 3369: 3367: 3358: 3357: 3353: 3343: 3341: 3332: 3331: 3327: 3317: 3315: 3312:Hindustan Times 3306: 3305: 3301: 3291: 3289: 3280: 3279: 3275: 3265: 3263: 3254: 3253: 3249: 3239: 3237: 3229:Rao, Shashank. 3227: 3223: 3213: 3211: 3202: 3201: 3197: 3187: 3185: 3177: 3176: 3172: 3162: 3160: 3152: 3151: 3147: 3137: 3135: 3126: 3125: 3121: 3111: 3109: 3100: 3099: 3095: 3085: 3083: 3074: 3073: 3066: 3056: 3054: 3051:Hindustan Times 3045: 3044: 3040: 3030: 3028: 3018: 3014: 3004: 3002: 3001:. 30 March 2017 2993: 2992: 2988: 2978: 2976: 2975:. 30 March 2017 2973:Hindustan Times 2967: 2966: 2962: 2952: 2950: 2949:. 30 March 2017 2941: 2940: 2936: 2926: 2924: 2923:. 22 March 2017 2915: 2914: 2910: 2900: 2898: 2889: 2888: 2884: 2874: 2872: 2863: 2862: 2858: 2848: 2846: 2837: 2836: 2832: 2822: 2820: 2819:. 22 March 2017 2811: 2810: 2806: 2796: 2794: 2793:. 24 March 2021 2791:Hindustan Times 2785: 2784: 2780: 2770: 2768: 2765:Hindustan Times 2759: 2758: 2754: 2744: 2742: 2733: 2732: 2728: 2718: 2716: 2713:Hindustan Times 2707: 2706: 2702: 2692: 2690: 2689:. 23 April 2017 2687:Hindustan Times 2681: 2680: 2676: 2666: 2664: 2663:. 24 April 2017 2655: 2654: 2650: 2640: 2638: 2637:. 25 April 2017 2629: 2628: 2624: 2614: 2612: 2602: 2598: 2588: 2586: 2578: 2577: 2573: 2563: 2561: 2552: 2551: 2547: 2537: 2535: 2526: 2525: 2521: 2511: 2509: 2500: 2499: 2495: 2490: 2481: 2463: 2462: 2459: 2457:Fare collection 2440: 2434:in April 2019. 2416: 2397: 2396: 2390: 2385: 2372: 2371: 2362: 2361: 2355: 2354: 2341: 2340: 2337: 2320: 2318: 2316: 2310: 2308: 2260: 2258: 2255:19 January 2023 2233:19 January 2023 2209: 2207: 2204:19 January 2023 2201:जोगेश्वरी पूर्व 2197:Jogeshwari East 2182:19 January 2023 1999:Rashtriya Udyan 1960: 1958: 1957: 1952: 1950: 1900: 1892: 1744: 1728: 1702: 1701: 1695: 1694: 1688: 1687: 1652: 1651: 1645: 1644: 1629: 1585: 1480:Extension date 1443: 1442: 1438: 1432: 1397: 1396: 1390: 1389: 1382: 1273: 1253: 1251: 1239: 1232: 1217: 1205: 1200: 1199: 1192: 1191: 1182: 1181: 1174: 1173: 1164: 1163: 1156: 1155: 1133: 1131: 1119: 1112: 1093: 1073: 1068: 1048: 1046: 1031: 1024: 1023: 1016: 1015: 1008: 999: 998: 991: 990: 983: 974: 954: 949: 948: 941: 940: 931: 930: 923: 922: 915: 893: 888: 868: 866: 857:Jogeshwari East 853: 848: 841: 840: 833: 832: 825: 818: 809: 789: 784: 764: 759: 739: 734: 714: 709: 689: 684: 664: 659: 639: 634: 614: 609: 593:Rashtriya Udyan 589: 584: 564: 559: 540: 533: 513: 508: 507: 500: 499: 490: 489: 482: 481: 474: 467: 445: 443: 431: 424: 417: 402: 395: 388: 387: 380: 379: 357: 355: 343: 324: 317: 301: 281:Electrification 271: 264: 260: 257: 255: 254:4 ft  253: 249: 206: 204: 201: 188: 186: 169:Daily ridership 150: 109: 93: 26: 17: 12: 11: 5: 6104: 6094: 6093: 6088: 6083: 6078: 6061: 6060: 6058: 6057: 6050:* Stations in 6046: 6043: 6042: 6040: 6039: 6028: 6026: 6023: 6020: 6019: 6017: 6016: 6009: 6006:Airport Colony 6002: 5992: 5987: 5982: 5977: 5972: 5967: 5962: 5957: 5952: 5947: 5942: 5937: 5932: 5921: 5919: 5913: 5912: 5902: 5901: 5894: 5887: 5879: 5870: 5869: 5866: 5865: 5860: 5855: 5850: 5845: 5840: 5835: 5830: 5825: 5820: 5808: 5807: 5804: 5803: 5801: 5800: 5795: 5794: 5793: 5783: 5778: 5773: 5768: 5760: 5759: 5758: 5737: 5735: 5731: 5730: 5728: 5727: 5725:Interstate bus 5717: 5716: 5715: 5710: 5705: 5690: 5689: 5688: 5686:Juhu Aerodrome 5673: 5672: 5671: 5669:Nashik Airport 5666: 5659: 5657:Nagpur Airport 5654: 5649: 5633: 5631: 5627: 5626: 5624: 5623: 5617: 5611: 5605: 5599: 5593: 5587: 5581: 5575: 5568: 5566: 5562: 5561: 5559: 5558: 5546: 5544: 5540: 5539: 5537: 5536: 5531: 5526: 5519: 5514: 5512:Konkan Railway 5506: 5501: 5500: 5499: 5494: 5489: 5484: 5479: 5469: 5463: 5461: 5457: 5456: 5454: 5453: 5452: 5451: 5439: 5428: 5426: 5422: 5421: 5419: 5418: 5417: 5416: 5415:4 lines (2020) 5404: 5403: 5402: 5401: 5393: 5392: 5391: 5386: 5381: 5366: 5365: 5364: 5363: 5362: 5357: 5342: 5341: 5340: 5335: 5320: 5310: 5309: 5308: 5303: 5298: 5277: 5275: 5271: 5270: 5268:in Maharashtra 5266:transportation 5261: 5260: 5253: 5246: 5238: 5230: 5229: 5204: 5178: 5145: 5119: 5093: 5074: 5048: 5023: 4997: 4972: 4961:. 1 April 2019 4946: 4921: 4895: 4869: 4858:. 30 July 2019 4843: 4818: 4789: 4763: 4737: 4711: 4685: 4659: 4634: 4608: 4586: 4561: 4530: 4505: 4480: 4469:. 5 March 2020 4466:Indian Express 4452: 4426: 4393: 4367: 4341: 4330:. 3 April 2022 4315: 4289: 4263: 4252:. 20 June 2021 4237: 4211: 4185: 4159: 4133: 4100: 4067: 4056:. 10 July 2020 4041: 4008: 3997:. 18 June 2019 3982: 3956: 3930: 3919:. 25 June 2017 3904: 3875: 3849: 3838:. 6 April 2017 3823: 3812:. 4 April 2017 3797: 3771: 3745: 3719: 3693: 3668: 3642: 3616: 3590: 3564: 3544: 3518: 3492: 3466: 3433: 3407: 3377: 3351: 3325: 3299: 3273: 3247: 3221: 3195: 3170: 3145: 3119: 3093: 3064: 3053:. 10 July 2018 3038: 3012: 2986: 2960: 2934: 2908: 2882: 2856: 2830: 2804: 2778: 2752: 2726: 2715:. 15 June 2017 2700: 2674: 2648: 2622: 2596: 2571: 2560:. 16 June 2015 2545: 2519: 2508:. 20 July 2023 2492: 2491: 2489: 2486: 2480: 2477: 2458: 2455: 2439: 2436: 2415: 2412: 2395:was awarded a 2389: 2386: 2384: 2383:Infrastructure 2381: 2336: 2333: 2330: 2329: 2326: 2306: 2303: 2300: 2295: 2291: 2290: 2287: 2284: 2281: 2280:विमानतळ वसाहत 2278: 2276:Airport Colony 2273: 2269: 2268: 2265: 2256: 2253: 2250: 2245: 2241: 2240: 2237: 2234: 2231: 2228: 2223: 2219: 2218: 2215: 2205: 2202: 2199: 2194: 2190: 2189: 2186: 2183: 2180: 2177: 2172: 2168: 2167: 2164: 2161: 2158: 2155: 2150: 2146: 2145: 2142: 2139: 2136: 2133: 2128: 2124: 2123: 2120: 2117: 2114: 2111: 2106: 2102: 2101: 2098: 2095: 2092: 2089: 2084: 2080: 2079: 2076: 2073: 2070: 2067: 2062: 2058: 2057: 2054: 2051: 2048: 2045: 2040: 2036: 2035: 2032: 2029: 2026: 2023: 2018: 2014: 2013: 2010: 2007: 2004: 2001: 1996: 1992: 1991: 1988: 1985: 1982: 1979: 1974: 1970: 1969: 1966: 1948: 1945: 1942: 1937: 1933: 1932: 1927: 1921: 1920: 1917: 1914: 1911: 1908: 1904: 1903: 1891: 1888: 1885: 1884: 1881: 1879: 1876: 1872: 1871: 1868: 1866: 1863: 1859: 1858: 1855: 1853: 1849: 1848: 1846: 1843: 1840: 1836: 1835: 1832: 1829: 1826: 1823: 1819: 1818: 1815: 1812: 1809: 1806: 1802: 1801: 1798: 1795: 1792: 1789: 1785: 1784: 1781: 1778: 1774: 1773: 1770: 1769:2 August 2021 1767: 1764: 1761: 1757: 1756: 1753: 1750: 1743: 1740: 1727: 1724: 1628: 1625: 1584: 1581: 1578: 1577: 1574: 1571: 1568: 1565: 1563: 1560: 1559: 1556: 1553: 1548: 1543: 1540: 1536: 1535: 1532: 1529: 1524: 1519: 1515: 1514: 1511: 1508: 1503: 1498: 1495: 1491: 1490: 1487: 1484: 1481: 1478: 1474: 1473: 1431: 1428: 1381: 1378: 1307: 1306: 1303: 1302: 1299: 1298: 1295: 1294: 1292: 1290: 1288: 1286: 1284: 1282: 1279: 1278: 1276: 1274: 1267: 1265: 1263: 1260: 1259: 1242: 1240: 1233: 1226: 1224: 1222: 1219: 1218: 1211: 1206: 1203: 1201: 1193: 1185: 1184: 1183: 1175: 1167: 1166: 1165: 1157: 1149: 1148: 1147: 1145: 1143: 1140: 1139: 1122: 1120: 1113: 1106: 1104: 1102: 1099: 1098: 1096: 1094: 1087: 1085: 1083: 1080: 1079: 1077:Airport Colony 1074: 1071: 1069: 1062: 1060: 1058: 1055: 1054: 1034: 1032: 1025: 1017: 1009: 1002: 1001: 1000: 992: 984: 977: 976: 975: 968: 966: 964: 961: 960: 955: 952: 950: 942: 934: 933: 932: 924: 916: 909: 908: 907: 905: 903: 900: 899: 894: 891: 889: 882: 880: 878: 875: 874: 854: 851: 849: 842: 834: 826: 819: 812: 811: 810: 803: 801: 799: 796: 795: 790: 787: 785: 778: 776: 774: 771: 770: 765: 762: 760: 753: 751: 749: 746: 745: 740: 737: 735: 728: 726: 724: 721: 720: 715: 712: 710: 703: 701: 699: 696: 695: 690: 687: 685: 678: 676: 674: 671: 670: 665: 662: 660: 653: 651: 649: 646: 645: 640: 637: 635: 628: 626: 624: 621: 620: 615: 612: 610: 603: 601: 599: 596: 595: 590: 587: 585: 578: 576: 574: 571: 570: 565: 562: 560: 553: 551: 549: 546: 545: 543: 541: 534: 527: 525: 523: 520: 519: 514: 511: 509: 501: 493: 492: 491: 483: 475: 468: 461: 460: 459: 457: 455: 452: 451: 434: 432: 425: 418: 411: 409: 407: 404: 403: 400: 398: 396: 389: 381: 373: 372: 371: 369: 367: 364: 363: 346: 344: 337: 335: 333: 326: 325: 322: 319: 318: 313: 303: 302: 299: 292: 291: 286:25 kV 50 Hz AC 283: 277: 276: 273:standard gauge 247: 241: 240: 237: 233: 232: 229: 225: 224: 221: 217: 216: 212: 211: 198: 194: 193: 183: 179: 178: 174: 173: 170: 166: 165: 160: 156: 155: 144: 140: 139: 134: 130: 129: 124: 120: 119: 115: 114: 107: 103: 102: 99: 95: 94: 92: 91: 86: 80: 78: 74: 73: 63: 59: 58: 55: 51: 50: 45: 41: 40: 37: 33: 32: 28: 27: 24: 15: 9: 6: 4: 3: 2: 6103: 6092: 6089: 6087: 6084: 6082: 6079: 6077: 6074: 6073: 6071: 6055: 6053: 6048: 6047: 6044: 6038: 6035: 6030: 6029: 6027: 6021: 6015: 6014: 6010: 6008: 6007: 6003: 6001: 5996: 5993: 5991: 5988: 5986: 5983: 5981: 5980:Goregaon East 5978: 5976: 5973: 5971: 5968: 5966: 5963: 5961: 5958: 5956: 5953: 5951: 5948: 5946: 5943: 5941: 5938: 5936: 5933: 5931: 5926: 5923: 5922: 5920: 5918: 5914: 5910: 5907: 5900: 5895: 5893: 5888: 5886: 5881: 5880: 5877: 5864: 5861: 5859: 5856: 5854: 5851: 5849: 5846: 5844: 5841: 5839: 5836: 5834: 5831: 5829: 5826: 5824: 5821: 5819: 5818:Greater Delhi 5816: 5814: 5810: 5809: 5805: 5799: 5796: 5792: 5789: 5788: 5787: 5784: 5782: 5779: 5777: 5774: 5772: 5771:Auto rickshaw 5769: 5767: 5764: 5761: 5757:Mumbai-Mandwa 5756: 5752: 5749: 5748: 5747: 5743: 5739: 5738: 5736: 5732: 5726: 5722: 5718: 5714: 5711: 5709: 5706: 5704: 5701: 5700: 5699: 5695: 5691: 5687: 5684: 5683: 5682: 5678: 5674: 5670: 5667: 5665: 5664: 5660: 5658: 5655: 5653: 5650: 5648: 5645: 5644: 5643: 5639: 5635: 5634: 5632: 5628: 5621: 5618: 5615: 5612: 5609: 5606: 5603: 5600: 5597: 5594: 5591: 5588: 5585: 5582: 5579: 5576: 5573: 5570: 5569: 5567: 5563: 5557: 5553: 5548: 5547: 5545: 5541: 5535: 5532: 5530: 5527: 5525: 5524: 5520: 5518: 5515: 5513: 5510: 5507: 5505: 5502: 5498: 5495: 5493: 5490: 5488: 5485: 5483: 5480: 5478: 5475: 5474: 5473: 5470: 5468: 5465: 5464: 5462: 5458: 5450: 5449: 5445: 5444: 5443: 5440: 5438: 5434: 5430: 5429: 5427: 5423: 5414: 5411: 5410: 5409: 5406: 5405: 5400: 5397: 5394: 5390: 5387: 5385: 5382: 5380: 5377: 5376: 5375: 5372: 5371: 5370: 5367: 5361: 5358: 5356: 5353: 5352: 5351: 5347: 5343: 5339: 5336: 5334: 5331: 5330: 5329: 5325: 5321: 5319: 5315: 5311: 5307: 5304: 5302: 5299: 5297: 5294: 5293: 5292: 5288: 5284: 5283: 5282: 5279: 5278: 5276: 5272: 5267: 5259: 5254: 5252: 5247: 5245: 5240: 5239: 5236: 5218: 5214: 5208: 5192: 5188: 5182: 5167: 5163: 5159: 5155: 5149: 5133: 5129: 5123: 5108: 5104: 5097: 5089: 5085: 5078: 5062: 5058: 5052: 5037: 5033: 5027: 5011: 5007: 5001: 4986: 4982: 4976: 4960: 4956: 4950: 4935: 4931: 4925: 4909: 4905: 4899: 4883: 4879: 4873: 4857: 4856:Deccan Herald 4853: 4847: 4832: 4828: 4822: 4806: 4802: 4796: 4794: 4778: 4774: 4767: 4751: 4747: 4741: 4725: 4721: 4715: 4699: 4695: 4689: 4673: 4672:Mumbai Mirror 4669: 4663: 4648: 4644: 4638: 4622: 4618: 4612: 4596: 4590: 4575: 4571: 4565: 4549: 4545: 4539: 4537: 4535: 4519: 4515: 4509: 4494: 4490: 4484: 4468: 4467: 4462: 4456: 4441: 4437: 4430: 4415: 4411: 4407: 4403: 4397: 4381: 4377: 4371: 4355: 4351: 4345: 4329: 4325: 4319: 4303: 4299: 4293: 4277: 4273: 4267: 4251: 4247: 4241: 4226:. 1 June 2021 4225: 4221: 4215: 4199: 4198:Mumbai Mirror 4195: 4189: 4173: 4169: 4163: 4147: 4143: 4137: 4122: 4118: 4114: 4110: 4104: 4089: 4085: 4081: 4077: 4071: 4055: 4051: 4045: 4030: 4026: 4022: 4018: 4012: 3996: 3992: 3986: 3970: 3966: 3960: 3944: 3940: 3934: 3918: 3914: 3908: 3892: 3888: 3882: 3880: 3863: 3859: 3853: 3837: 3833: 3827: 3811: 3807: 3801: 3786: 3785:Mumbai Mirror 3782: 3775: 3759: 3755: 3749: 3733: 3729: 3723: 3707: 3703: 3697: 3682: 3678: 3672: 3656: 3652: 3646: 3630: 3629:The Asian Age 3626: 3620: 3604: 3600: 3594: 3579: 3575: 3568: 3560: 3559: 3554: 3548: 3532: 3528: 3522: 3507: 3503: 3496: 3481: 3477: 3470: 3455: 3451: 3447: 3443: 3437: 3422: 3418: 3411: 3395: 3391: 3387: 3381: 3365: 3361: 3355: 3339: 3335: 3329: 3313: 3309: 3303: 3287: 3283: 3277: 3261: 3257: 3251: 3236: 3235:Mumbai Mirror 3232: 3225: 3209: 3205: 3199: 3184: 3180: 3174: 3159: 3155: 3149: 3133: 3132:The Asian Age 3129: 3123: 3107: 3103: 3097: 3081: 3077: 3071: 3069: 3052: 3048: 3042: 3027: 3026:Mumbai Mirror 3023: 3016: 3000: 2996: 2990: 2974: 2970: 2964: 2948: 2944: 2938: 2922: 2918: 2912: 2896: 2892: 2886: 2870: 2866: 2860: 2844: 2840: 2834: 2818: 2814: 2808: 2792: 2788: 2782: 2766: 2762: 2756: 2740: 2736: 2730: 2714: 2710: 2704: 2688: 2684: 2678: 2662: 2658: 2652: 2636: 2632: 2626: 2611: 2607: 2600: 2585: 2581: 2575: 2559: 2555: 2549: 2533: 2529: 2523: 2507: 2503: 2497: 2493: 2485: 2476: 2473: 2471: 2454: 2452: 2448: 2445: 2435: 2433: 2429: 2425: 2421: 2411: 2407: 2405: 2394: 2388:Rolling stock 2378: 2368: 2351: 2349: 2327: 2323: 2313: 2307: 2304: 2301: 2299: 2296: 2293: 2292: 2288: 2285: 2282: 2279: 2277: 2274: 2271: 2270: 2266: 2263: 2257: 2254: 2251: 2249: 2246: 2243: 2242: 2238: 2235: 2232: 2229: 2227: 2224: 2221: 2220: 2216: 2212: 2206: 2203: 2200: 2198: 2195: 2192: 2191: 2187: 2184: 2181: 2179:गोरेगाव पूर्व 2178: 2176: 2175:Goregaon East 2173: 2170: 2169: 2165: 2162: 2159: 2156: 2154: 2151: 2148: 2147: 2143: 2140: 2137: 2134: 2132: 2129: 2126: 2125: 2121: 2118: 2115: 2112: 2110: 2107: 2104: 2103: 2099: 2096: 2093: 2090: 2088: 2085: 2082: 2081: 2077: 2074: 2071: 2068: 2066: 2063: 2060: 2059: 2055: 2052: 2049: 2046: 2044: 2041: 2038: 2037: 2033: 2030: 2027: 2024: 2022: 2019: 2016: 2015: 2011: 2008: 2005: 2002: 2000: 1997: 1994: 1993: 1989: 1986: 1983: 1980: 1978: 1975: 1972: 1971: 1967: 1963: 1955: 1949: 1946: 1943: 1941: 1938: 1935: 1934: 1931: 1928: 1926: 1923: 1922: 1910:Station Name 1905: 1898: 1895: 1882: 1877: 1874: 1873: 1869: 1865:Working Pile 1864: 1861: 1860: 1856: 1851: 1850: 1847: 1842:Piling Works 1841: 1837: 1830: 1827: 1824: 1821: 1820: 1816: 1813: 1807: 1804: 1803: 1799: 1796: 1790: 1787: 1786: 1779: 1776: 1775: 1771: 1768: 1765: 1762: 1760:1 March 2021 1759: 1758: 1752:Name of Work 1747: 1739: 1737: 1732: 1723: 1719: 1717: 1712: 1708: 1683: 1679: 1676: 1671: 1668: 1667:Mahanagar Gas 1662: 1658: 1642: 1638: 1637:Narendra Modi 1634: 1624: 1622: 1618: 1614: 1610: 1609:Dahanukarwadi 1606: 1601: 1599: 1594: 1590: 1575: 1572: 1569: 1567:Dahisar East 1566: 1564: 1562: 1561: 1557: 1554: 1552: 1549: 1547: 1544: 1541: 1538: 1537: 1533: 1530: 1528: 1525: 1523: 1520: 1517: 1516: 1512: 1509: 1507: 1504: 1502: 1499: 1497:2 April 2022 1496: 1492: 1475: 1472: 1468: 1465: 1463: 1457: 1455: 1451: 1437: 1427: 1423: 1420: 1416: 1411: 1408: 1403: 1387: 1377: 1375: 1371: 1367: 1362: 1360: 1356: 1352: 1348: 1343: 1341: 1337: 1333: 1329: 1325: 1321: 1320:rapid transit 1317: 1313: 1293: 1291: 1289: 1287: 1285: 1283: 1281: 1280: 1275: 1266: 1264: 1261: 1258: 1256: 1249: 1241: 1225: 1223: 1220: 1215: 1210: 1202: 1146: 1144: 1141: 1138: 1136: 1129: 1121: 1105: 1103: 1100: 1095: 1086: 1084: 1081: 1078: 1070: 1061: 1059: 1056: 1053: 1051: 1044: 1038: 1033: 967: 965: 962: 959: 951: 906: 904: 901: 898: 890: 881: 879: 876: 873: 871: 864: 858: 850: 802: 800: 797: 794: 793:Goregaon East 786: 777: 775: 772: 769: 761: 752: 750: 747: 744: 736: 727: 725: 722: 719: 711: 702: 700: 697: 694: 686: 677: 675: 672: 669: 661: 652: 650: 647: 644: 636: 627: 625: 622: 619: 611: 602: 600: 597: 594: 586: 577: 575: 572: 569: 561: 552: 550: 547: 542: 526: 524: 521: 518: 510: 458: 456: 453: 450: 448: 441: 433: 410: 408: 405: 401:Dahisar Depot 397: 370: 368: 365: 362: 360: 353: 345: 336: 334: 331: 328: 327: 321: 320: 316: 312: 311: 308: 305: 304: 298: 297: 293: 290: 289:overhead line 287: 284: 282: 278: 274: 250:1,435 mm 248: 246: 242: 238: 234: 230: 226: 222: 218: 213: 199: 195: 184: 180: 175: 171: 167: 164: 161: 159:Rolling stock 157: 153: 148: 145: 141: 138: 135: 131: 128: 127:Rapid transit 125: 121: 116: 112: 108: 104: 100: 96: 90: 87: 85: 82: 81: 79: 75: 71: 67: 64: 60: 56: 52: 49: 46: 42: 38: 34: 29: 22: 19: 6051: 6049: 6036: 6031: 6011: 6004: 5925:Dahisar East 5916: 5906:Mumbai Metro 5811: 5755:prospective: 5754: 5750: 5745: 5724: 5697: 5680: 5661: 5647:Pune Airport 5641: 5549:Pune-Pimpri 5528: 5521: 5516: 5487:Harbour line 5482:Western line 5477:Central line 5466: 5446: 5441: 5413:Mumbai Metro 5407: 5374:Mumbai Metro 5368: 5328:Nagpur Metro 5305: 5291:Mumbai Metro 5280: 5220:. Retrieved 5216: 5207: 5195:. Retrieved 5190: 5181: 5169:. Retrieved 5157: 5148: 5136:. Retrieved 5131: 5122: 5110:. Retrieved 5106: 5096: 5087: 5077: 5065:. Retrieved 5063:. 4 May 2023 5060: 5051: 5039:. Retrieved 5035: 5026: 5014:. Retrieved 5009: 5000: 4988:. Retrieved 4984: 4975: 4963:. Retrieved 4958: 4949: 4937:. Retrieved 4934:domain-b.com 4933: 4924: 4912:. Retrieved 4907: 4898: 4886:. Retrieved 4881: 4872: 4860:. Retrieved 4855: 4846: 4834:. Retrieved 4831:domain-b.com 4830: 4821: 4809:. Retrieved 4804: 4780:. Retrieved 4776: 4766: 4754:. Retrieved 4749: 4740: 4728:. Retrieved 4723: 4714: 4702:. Retrieved 4697: 4688: 4676:. Retrieved 4671: 4662: 4650:. Retrieved 4646: 4637: 4625:. Retrieved 4620: 4611: 4599:. Retrieved 4589: 4577:. Retrieved 4573: 4564: 4552:. Retrieved 4547: 4521:. Retrieved 4517: 4508: 4496:. Retrieved 4492: 4483: 4471:. Retrieved 4464: 4455: 4443:. Retrieved 4439: 4429: 4417:. Retrieved 4405: 4396: 4384:. Retrieved 4379: 4370: 4358:. Retrieved 4353: 4344: 4332:. Retrieved 4327: 4318: 4306:. Retrieved 4301: 4292: 4280:. Retrieved 4275: 4266: 4254:. Retrieved 4249: 4240: 4228:. Retrieved 4223: 4214: 4202:. Retrieved 4197: 4188: 4176:. Retrieved 4171: 4162: 4150:. Retrieved 4145: 4136: 4124:. Retrieved 4112: 4103: 4091:. Retrieved 4079: 4070: 4058:. Retrieved 4053: 4044: 4032:. Retrieved 4020: 4011: 3999:. Retrieved 3994: 3985: 3973:. Retrieved 3968: 3959: 3947:. Retrieved 3942: 3933: 3921:. Retrieved 3916: 3907: 3895:. Retrieved 3893:. 7 May 2017 3890: 3866:. Retrieved 3864:. 3 May 2017 3861: 3852: 3840:. Retrieved 3835: 3826: 3814:. Retrieved 3809: 3800: 3788:. Retrieved 3784: 3774: 3762:. Retrieved 3757: 3748: 3736:. Retrieved 3731: 3722: 3710:. Retrieved 3705: 3696: 3684:. Retrieved 3680: 3671: 3659:. Retrieved 3654: 3645: 3633:. Retrieved 3628: 3619: 3607:. Retrieved 3605:. 3 May 2017 3602: 3593: 3581:. Retrieved 3577: 3567: 3556: 3547: 3535:. Retrieved 3530: 3521: 3509:. Retrieved 3505: 3495: 3483:. Retrieved 3480:ETRealty.com 3479: 3469: 3457:. Retrieved 3445: 3436: 3424:. Retrieved 3420: 3410: 3398:. Retrieved 3389: 3380: 3368:. Retrieved 3363: 3354: 3342:. Retrieved 3337: 3328: 3316:. Retrieved 3311: 3302: 3290:. Retrieved 3285: 3276: 3264:. Retrieved 3259: 3250: 3238:. Retrieved 3234: 3224: 3212:. Retrieved 3207: 3198: 3186:. Retrieved 3182: 3173: 3161:. Retrieved 3157: 3148: 3136:. Retrieved 3131: 3122: 3110:. Retrieved 3105: 3096: 3084:. Retrieved 3079: 3055:. Retrieved 3050: 3041: 3029:. Retrieved 3025: 3015: 3003:. Retrieved 2998: 2989: 2977:. Retrieved 2972: 2963: 2951:. Retrieved 2946: 2937: 2925:. Retrieved 2920: 2911: 2899:. Retrieved 2894: 2885: 2873:. Retrieved 2868: 2859: 2847:. Retrieved 2842: 2833: 2821:. Retrieved 2816: 2807: 2795:. Retrieved 2790: 2781: 2769:. Retrieved 2764: 2755: 2743:. Retrieved 2738: 2729: 2717:. Retrieved 2712: 2703: 2691:. Retrieved 2686: 2677: 2665:. Retrieved 2660: 2651: 2639:. Retrieved 2634: 2625: 2613:. Retrieved 2609: 2599: 2587:. Retrieved 2583: 2574: 2562:. Retrieved 2557: 2548: 2536:. Retrieved 2532:the original 2522: 2512:30 September 2510:. Retrieved 2506:cnbctv18.com 2505: 2496: 2482: 2474: 2460: 2441: 2422:Urbalis 400 2417: 2408: 2391: 2369: 2352: 2338: 2328:Underground 2160:2 April 2022 2138:2 April 2022 2116:2 April 2022 2094:2 April 2022 2072:2 April 2022 2050:2 April 2022 2028:2 April 2022 2006:2 April 2022 1984:2 April 2022 1947:2 April 2022 1940:Dahisar East 1916:Connections 1893: 1780:Survey Work 1766:1 June 2021 1733: 1729: 1720: 1713: 1709: 1698:127.78 crore 1691:174.76 crore 1684: 1680: 1672: 1663: 1659: 1632: 1630: 1627:Construction 1621:Andheri West 1613:Dahisar East 1602: 1586: 1501:Dahisar East 1470: 1458: 1439: 1424: 1412: 1404: 1393:64,000 crore 1383: 1374:Andheri West 1363: 1347:Dahisar East 1344: 1316:Mumbai Metro 1311: 1310: 1244: 1124: 1039: 859: 517:Dahisar East 436: 348: 306: 137:Mumbai Metro 84:Dahisar East 18: 5823:Maharashtra 5763:M-Indicator 5556:Rainbow BRT 5355:Purple Line 5333:Orange Line 5274:Metro lines 4756:26 November 4730:26 November 4704:26 November 4548:Mumbai Live 3583:19 February 3511:10 February 3426:10 February 3400:10 February 3208:Mumbai Live 3106:Mumbai Live 2901:25 February 2875:25 February 2849:25 February 2444:25 kV 50 Hz 2428:Purple Line 2400:3,015 crore 2358:3,600 crore 2344:6,208 crore 2325:(Proposed) 1944:दहिसर पूर्व 1763:1 May 2021 1648:6,208 crore 1633:bhoomipujan 1446:3,600 crore 1400:4,737 crore 1328:Maharashtra 245:Track gauge 220:Line length 149:(temporary) 70:Maharashtra 54:Line number 6070:Categories 5828:Tamil Nadu 5798:Share taxi 5751:Operating: 5396:Pune Metro 5350:Pune Metro 5222:3 November 5197:3 November 5171:3 November 5138:5 December 5112:5 December 5067:3 November 4554:3 November 4523:3 November 3318:4 November 3188:3 November 3112:3 November 3086:3 November 2488:References 2414:Signalling 1901:Red Line 7 1852:Test Pile 1450:Terminal 2 1430:Extensions 1359:Red Line 9 300:Line 7 map 207:2022-04-02 189:2016-08-08 5995:Gundavali 5950:Magathane 5935:Ovaripada 5853:Rajasthan 5848:Hyderabad 5843:Bengaluru 5681:Heliports 5565:Urban bus 5360:Aqua Line 5338:Aqua Line 5166:0013-0389 5107:The Hindu 4414:0013-0389 4121:0971-8257 4088:0971-751X 4080:The Hindu 4029:0971-751X 4021:The Hindu 3655:Asian Age 3603:Asian Age 3578:The Hindu 3506:The Hindu 3454:0013-0389 3421:The Hindu 3163:9 October 3138:9 October 2895:Asian Age 2610:The Hindu 2466:160 crore 2432:Aqua Line 2404:Bangalore 2375:340 crore 2365:600 crore 2289:Elevated 2267:Elevated 2248:Gundavali 2239:Elevated 2217:Elevated 2188:Elevated 2166:Elevated 2144:Elevated 2122:Elevated 2100:Elevated 2078:Elevated 2056:Elevated 2043:Magathane 2034:Elevated 2012:Elevated 1990:Elevated 1977:Ovaripada 1968:Elevated 1878:Pile cap 1655:348 crore 1617:Gundavali 1546:Gundavali 1527:Gundavali 1489:Stations 1338:with the 1336:Bhayander 958:Gundavali 643:Magathane 568:Ovaripada 236:Character 215:Technical 182:Commenced 154:(planned) 152:Bhayandar 89:Gundavali 6024:Depot(s) 5970:Dindoshi 5945:Devipada 5909:stations 5863:NE India 5833:W Bengal 5791:Ola Cabs 5781:Rickshaw 5642:Airports 5529:Approved 5408:Approved 4652:14 March 4647:NDTV.com 3738:30 March 3712:30 March 3686:16 March 3661:16 March 3394:Archived 3158:NDTV.com 3031:13 April 3005:30 March 2979:30 March 2953:30 March 2927:24 March 2823:24 March 2538:12 March 2131:Dindoshi 2047:मागाठाणे 2025:देवीपाडा 2021:Devipada 1981:ओवरीपाडा 1913:Opening 1890:Stations 1705:35 crore 1675:viaducts 1539:Line 7A 1483:Termini 1477:Section 1380:Planning 1355:Gundavli 743:Dindoshi 618:Devipada 268: in 239:Elevated 143:Depot(s) 98:Stations 31:Overview 6052:Italics 5858:Gujarat 5616:(MSRTC) 5610:(PMPML) 5442:Defunct 5264:Public 4862:10 July 4805:Mid-day 4627:10 July 4597:. MMRDA 4498:10 July 4230:10 July 4126:10 July 4093:10 July 4060:10 July 4034:10 July 3975:10 July 3949:10 July 3842:6 April 3816:4 April 3790:10 July 3764:4 April 3635:10 July 3537:10 July 3485:10 July 3459:10 July 3292:10 July 3057:10 July 2745:10 July 2719:10 July 2693:10 July 2615:6 April 2252:गुंदवली 2135:दिंडोशी 2091:आकुर्ली 1930:Marathi 1925:English 1919:Layout 1749:Sr. No. 1726:Line 7A 1593:Charkop 1589:Dahisar 1494:Line 7 1486:Length 1471:History 1452:of the 1314:of the 1204:18.9342 1072:16.0849 953:15.5249 892:14.2951 852:13.1110 788:11.7434 263:⁄ 205: ( 187: ( 177:History 147:Charkop 118:Service 106:Website 77:Termini 72:, India 5960:Akurli 5955:Poisar 5838:Kerala 5622:(NMPL) 5604:(VVMT) 5598:(MBMT) 5586:(KDMT) 5580:(NMMT) 5574:(BEST) 5399:Line 3 5389:Line 6 5384:Line 4 5379:Line 3 5306:Line 7 5301:Line 2 5296:Line 1 5164:  5041:9 July 5016:9 July 4990:9 July 4965:9 July 4939:9 July 4914:9 July 4888:9 July 4836:9 July 4811:9 July 4782:9 July 4678:7 June 4601:7 June 4473:15 May 4445:9 July 4419:9 July 4412:  4386:9 July 4360:9 July 4334:9 July 4308:9 July 4282:9 July 4256:9 July 4204:9 July 4178:9 July 4152:9 July 4119:  4086:  4027:  4001:9 July 3923:5 July 3452:  3370:9 July 3344:9 July 3266:9 July 3240:9 July 3214:9 July 2797:9 July 2771:9 July 2589:9 July 2564:9 July 2420:Alstom 2321:Line 8 2210:Line 6 2087:Akurli 2065:Poisar 1961:Line 9 1598:Dongri 1370:Line 2 1324:Mumbai 1254:Line 8 869:Line 6 763:9.4249 738:8.3449 713:7.4569 693:Akurli 688:6.4492 668:Poisar 663:5.8249 638:4.0972 613:3.2749 588:2.1484 563:1.1404 512:0.0000 358:Line 9 323:Line 7 315:Legend 307: 197:Opened 133:System 111:Line 7 66:Mumbai 62:Locale 36:Status 5990:Mogra 5975:Aarey 5965:Kurar 5813:India 5592:(TMT) 4579:2 May 3897:8 May 3868:3 May 3609:3 May 2667:3 May 2641:3 May 2438:Power 2286:None 2230:मोगरा 2226:Mogra 2153:Aarey 2113:कुरार 2109:Kurar 2069:पोईसर 1857:100% 1783:100% 1716:Aarey 1605:Aarey 1522:Aarey 1506:Aarey 1351:Aarey 1332:India 1318:is a 897:Mogra 768:Aarey 718:Kurar 48:MMRDA 44:Owner 5698:Rail 5224:2023 5199:2023 5173:2023 5162:ISSN 5140:2022 5114:2022 5069:2023 5043:2023 5018:2023 4992:2023 4967:2023 4941:2023 4916:2023 4890:2023 4864:2023 4838:2023 4813:2023 4784:2023 4758:2016 4732:2016 4706:2016 4680:2017 4654:2019 4629:2023 4603:2017 4581:2021 4556:2023 4525:2023 4500:2023 4475:2020 4447:2023 4440:mint 4421:2023 4410:ISSN 4388:2023 4362:2023 4336:2023 4310:2023 4284:2023 4258:2023 4232:2023 4206:2023 4180:2023 4154:2023 4128:2023 4117:ISSN 4095:2023 4084:ISSN 4062:2023 4036:2023 4025:ISSN 4003:2023 3977:2023 3951:2023 3925:2017 3899:2017 3870:2017 3844:2017 3818:2017 3792:2023 3766:2017 3740:2017 3714:2017 3688:2017 3663:2017 3637:2023 3611:2017 3585:2017 3539:2023 3513:2017 3487:2023 3461:2023 3450:ISSN 3428:2017 3402:2017 3372:2023 3346:2023 3320:2023 3294:2023 3268:2023 3242:2023 3216:2023 3190:2023 3165:2018 3140:2018 3114:2023 3088:2023 3059:2023 3033:2017 3007:2017 2981:2017 2955:2017 2929:2017 2903:2017 2877:2017 2851:2017 2825:2017 2799:2023 2773:2023 2747:2023 2721:2023 2695:2023 2669:2017 2643:2017 2617:2017 2591:2023 2566:2023 2540:2014 2514:2023 2430:and 2393:BEML 2335:Cost 2317:and 2236:None 2185:None 2163:None 2141:None 2119:None 2097:None 2075:None 2053:None 2031:None 2009:None 1987:None 1870:22% 1845:19% 1834:32% 1831:29% 1828:28% 1817:92% 1814:89% 1811:86% 1800:30% 1797:27% 1794:15% 1631:The 1619:and 1611:via 1607:and 163:BEML 123:Type 5766:app 5543:BRT 4750:dna 3758:dna 2947:dna 2869:dna 2817:dna 2661:dna 2294:16 2272:15 2157:आरे 1883:9% 1576:16 1513:10 1349:to 1245:to 1125:to 1040:on 860:on 437:to 349:to 6072:: 5215:. 5189:. 5156:. 5130:. 5105:. 5086:. 5059:. 5034:. 5008:. 4983:. 4957:. 4932:. 4906:. 4880:. 4854:. 4829:. 4803:. 4792:^ 4775:. 4748:. 4722:. 4696:. 4670:. 4645:. 4619:. 4572:. 4546:. 4533:^ 4516:. 4491:. 4463:. 4438:. 4404:. 4378:. 4352:. 4326:. 4300:. 4274:. 4248:. 4222:. 4196:. 4170:. 4144:. 4111:. 4078:. 4052:. 4019:. 3993:. 3967:. 3941:. 3915:. 3889:. 3878:^ 3860:. 3834:. 3808:. 3783:. 3756:. 3730:. 3704:. 3679:. 3653:. 3627:. 3601:. 3576:. 3555:. 3529:. 3504:. 3478:. 3444:. 3419:. 3388:. 3362:. 3336:. 3310:. 3284:. 3258:. 3233:. 3206:. 3181:. 3156:. 3130:. 3104:. 3078:. 3067:^ 3049:. 3024:. 2997:. 2971:. 2945:. 2919:. 2893:. 2867:. 2841:. 2815:. 2789:. 2763:. 2737:. 2711:. 2685:. 2659:. 2633:. 2608:. 2582:. 2556:. 2504:. 2447:AC 2244:14 2222:13 2193:12 2171:11 2149:10 1907:# 1875:7 1862:6 1839:5 1822:4 1805:3 1788:2 1777:1 1558:2 1534:4 1456:. 1330:, 1326:, 270:) 101:14 68:, 6056:. 6033:■ 5999:■ 5929:■ 5898:e 5891:t 5884:v 5815:: 5257:e 5250:t 5243:v 5226:. 5201:. 5175:. 5142:. 5116:. 5090:. 5071:. 5045:. 5020:. 4994:. 4969:. 4943:. 4918:. 4892:. 4866:. 4840:. 4815:. 4786:. 4760:. 4734:. 4708:. 4682:. 4656:. 4631:. 4605:. 4583:. 4558:. 4527:. 4502:. 4477:. 4449:. 4423:. 4390:. 4364:. 4338:. 4312:. 4286:. 4260:. 4234:. 4208:. 4182:. 4156:. 4130:. 4097:. 4064:. 4038:. 4005:. 3979:. 3953:. 3927:. 3901:. 3872:. 3846:. 3820:. 3794:. 3768:. 3742:. 3716:. 3690:. 3665:. 3639:. 3613:. 3587:. 3541:. 3515:. 3489:. 3463:. 3430:. 3404:. 3374:. 3348:. 3322:. 3296:. 3270:. 3244:. 3218:. 3192:. 3167:. 3142:. 3116:. 3090:. 3061:. 3035:. 3009:. 2983:. 2957:. 2931:. 2905:. 2879:. 2853:. 2827:. 2801:. 2775:. 2749:. 2723:. 2697:. 2671:. 2645:. 2619:. 2593:. 2568:. 2542:. 2516:. 2464:₹ 2398:₹ 2373:₹ 2363:₹ 2356:₹ 2342:₹ 2127:9 2105:8 2083:7 2061:6 2039:5 2017:4 1995:3 1973:2 1936:1 1703:₹ 1696:₹ 1689:₹ 1653:₹ 1646:₹ 1444:₹ 1398:₹ 1391:₹ 265:2 261:1 258:+ 256:8 252:( 231:2 209:) 191:) 57:7

Index

MMRDA
Mumbai
Maharashtra
Dahisar East
Gundavali
Line 7
Rapid transit
Mumbai Metro
Charkop
Bhayandar
BEML
Track gauge
standard gauge
Electrification
25 kV 50 Hz AC
overhead line
Legend

Line 9

Line 2 - Yellow Line
Dahisar East
Ovaripada
Rashtriya Udyan
Devipada
Magathane
Poisar
Akurli
Kurar
Dindoshi

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.