631:
late due to its slowpoke contractor. The project’s civil contractor Sino Hydro has completed 100 percent of the construction, and there has been full progress in the installation of the turbine, water gate and transmission lines to evacuate the electricity generated by the plant. It will use the tailwaters of
Kulekhani II and have an installed capacity of 14 MW.
630:
Construction of the
Kulekhani III Hydropower Station had been underway since 2008 and is now finally complete as of 2019. The Nepal Electricity Authority (NEA) had extended the completion deadline of the Kulekhani 3 Hydropower Project for the fifth time to January 2018 as construction was running
584:
From the reservoir, water is sent to the
Kulekhani I Hydropower Station via a 5.8 km (3.6 mi) headrace tunnel to a gate house which controls the flow of water to the power station. From the gate house water travels down a 1,340 m (4,400 ft) long
783:
609:
Water discharged from the
Kulekhani I power station enters a series of tunnels and diversions where it reaches the Kulekhani II Hydropower Station which is also located underground and contains two 16 MW
614:-generators. The elevation difference between the reservoir and the power station affords a net hydraulic head of 284.1 m (932 ft). The dam and reservoir are in the
720:
545:
Hydropower
Stations. Construction began in 1977 and Kulekhani I was commissioned in 1982. Kulekhani II was commissioned in 1986 and a third power station, the 14 MW
695:
787:
941:
654:
549:
was expected to be commissioned in May 2015 but was delayed due to issues with the builder. The US$ 117.84 million project received funding from the
936:
931:
127:
911:
365:
642:
946:
956:
951:
66:
961:
696:"Climate Change Impacts on Reservoir based Hydropower Generation in Nepal: A case study of Kulekhani Hydropower Plant"
859:
921:
511:
107:
769:
17:
926:
886:
784:"Kulekhani III Hydroelectric Project : Construction Supervision and Construction Management (14 MW)"
566:
212:
881:
666:
409:
916:
590:
876:
701:. School of Environmental Management and Sustainable Development Pokhara University. pp. 15–17
597:-generators. The difference in elevation between the reservoir and the power station affords a net
845:
906:
8:
515:
459:
111:
871:
619:
519:
115:
611:
503:
237:
745:
598:
594:
475:
419:
321:
660:
Fishing nets and a lonely fisherman's station at
Indrasarovar lake, Kulekhani.
900:
615:
527:
499:
433:
380:
367:
142:
129:
831:
817:
452:
447:
554:
442:
550:
562:
507:
103:
862:
839:
586:
531:
439:
42:
825:
572:
The 114 m (374 ft) tall dam creates a reservoir called
49:
648:
Group of fishermen with their boats by the
Kulekhani reservoir.
576:
which stores 85,300,000 m (69,200 acre⋅ft) of water.
224:
523:
93:
53:
Kulekhani dam also known as "Indra sarobar", Makwanpur, Nepal
558:
721:"Nepal u Appraisal of the Kulekhani Hydroelectric Project"
807:
786:. Total Management Services Pvt. Ltd. Archived from
625:
27:
Dam in
Kulekhani, Makwanpur District, Narayani Zone
604:
579:
898:
484:Kulekhani III: 40.85 GWh (commissioned in 2019)
942:Buildings and structures in Makwanpur District
770:"Kulekhani 3 deadline extended for fifth time"
428:Kulekhani III: 102.56 m (336.5 ft)
279:4,400,000 m (5,800,000 cu yd)
73:
30:Dam in Makwanpur District, Bagmati Province
618:basin while the power stations are in the
41:
561:, Overseas Economic Cooperation Fund and
530:power generation and it supports the 60
426:Kulekhani II: 284.1 m (932 ft)
81:Location of Kulekhani Reservoir in Nepal
48:
937:Energy infrastructure completed in 1986
932:Energy infrastructure completed in 1982
746:"Kulekhani III begins power generation"
689:
687:
424:Kulekhani I: 550 m (1,800 ft)
308:73,300,000 m (59,400 acre⋅ft)
300:85,300,000 m (69,200 acre⋅ft)
14:
899:
693:
316:12,000,000 m (9,700 acre⋅ft)
912:Hydroelectric power stations in Nepal
684:
526:. The primary purpose of the dam is
292:Kulekhani Reservoir (Indra Sarobar)
24:
334:2.2 km (0.85 sq mi)
25:
973:
838:
824:
810:
665:
653:
641:
626:Kulekhani III hydropower station
601:of 550 m (1,800 ft).
326:126 km (49 sq mi)
72:
65:
947:Indrasarowar Rural Municipality
605:Kulekhani II hydropower station
512:Indrasarowar Rural Municipality
108:Indrasarowar Rural Municipality
776:
762:
738:
726:. World Bank. 25 November 1975
713:
580:Kulekhani I hydropower station
355:Kulekhani-I Hydropower Station
13:
1:
677:
47:The reservoir, Indra Sarobar
957:1982 establishments in Nepal
350:1,530 m (5,020 ft)
263:1,534 m (5,033 ft)
260:Elevation at crest
7:
887:GPX (secondary coordinates)
567:Nepal Electricity Authority
468:Kulekhani III: 14 MW (est.)
213:Nepal Electricity Authority
188:; 42 years ago
10:
978:
952:Underground power stations
634:
255:397 m (1,302 ft)
962:Artificial lakes of Nepal
882:GPX (primary coordinates)
857:Map all coordinates using
591:underground power station
488:
474:
458:
432:
418:
408:
396:
381:27.5402250°N 85.1135611°E
359:
354:
346:
338:
330:
320:
312:
304:
296:
288:
283:
275:
267:
259:
251:
243:
233:
223:
218:
208:
200:
182:
174:
166:
158:
121:
99:
89:
60:
40:
35:
865:Download coordinates as:
694:Dhakal, Manjeet (2011).
593:. It contains two 30 MW
451:Kulekhani III: 2 x 7 MW
446:Kulekhani II: 2 x 16 MW
247:114 m (374 ft)
846:Renewable energy portal
482:Kulekhani II: 104.6 GWh
460:Installed capacity
414:Conventional, diversion
342:7 km (4.3 mi)
175:Construction began
922:Dams completed in 1982
476:Annual generation
386:27.5402250; 85.1135611
313:Inactive capacity
271:10 m (33 ft)
201:Construction cost
54:
877:GPX (all coordinates)
672:Wall of Kulekhani dam
589:where it reaches the
347:Normal elevation
229:Embankment, rock-fill
225:Type of dam
143:27.59028°N 85.15583°E
52:
480:Kulekhani I: 211 GWh
438:Kulekhani I: 2 x 30
397:Commission date
305:Active capacity
927:Interbasin transfer
466:Kulekhani II: 32 MW
404:Kulekhani III: 2019
377: /
339:Maximum length
322:Catchment area
297:Total capacity
139: /
36:Kulekhani Reservoir
772:. 11 October 2017.
516:Makwanpur District
464:Kulekhani I: 60 MW
402:Kulekhani II: 1986
268:Width (crest)
204:US$ 117.84 million
148:27.59028; 85.15583
112:Makwanpur District
55:
565:. It is owned by
492:
491:
400:Kulekhani I: 1982
331:Surface area
219:Dam and spillways
183:Opening date
16:(Redirected from
969:
917:Rock-filled dams
848:
843:
842:
834:
829:
828:
820:
815:
814:
813:
800:
799:
797:
795:
780:
774:
773:
766:
760:
759:
757:
756:
742:
736:
735:
733:
731:
725:
717:
711:
710:
708:
706:
700:
691:
669:
657:
645:
520:Bagmati Province
392:
391:
389:
388:
387:
382:
378:
375:
374:
373:
370:
196:
194:
189:
154:
153:
151:
150:
149:
144:
140:
137:
136:
135:
132:
116:Bagmati Province
76:
75:
69:
45:
33:
32:
21:
977:
976:
972:
971:
970:
968:
967:
966:
897:
896:
895:
894:
893:
892:
891:
852:
851:
844:
837:
830:
823:
816:
811:
809:
804:
803:
793:
791:
790:on 2 April 2015
782:
781:
777:
768:
767:
763:
754:
752:
744:
743:
739:
729:
727:
723:
719:
718:
714:
704:
702:
698:
692:
685:
680:
673:
670:
661:
658:
649:
646:
637:
628:
612:Francis turbine
607:
582:
504:Kulekhani River
483:
481:
469:
467:
465:
450:
445:
427:
425:
403:
401:
385:
383:
379:
376:
371:
368:
366:
364:
363:
276:Dam volume
238:Kulekhani River
192:
190:
187:
147:
145:
141:
138:
133:
130:
128:
126:
125:
85:
84:
83:
82:
79:
78:
77:
56:
31:
28:
23:
22:
15:
12:
11:
5:
975:
965:
964:
959:
954:
949:
944:
939:
934:
929:
924:
919:
914:
909:
890:
889:
884:
879:
874:
868:
855:
854:
853:
850:
849:
835:
821:
806:
805:
802:
801:
775:
761:
737:
712:
682:
681:
679:
676:
675:
674:
671:
664:
662:
659:
652:
650:
647:
640:
636:
633:
627:
624:
606:
603:
599:hydraulic head
595:Pelton turbine
581:
578:
490:
489:
486:
485:
478:
472:
471:
462:
456:
455:
436:
430:
429:
422:
420:Hydraulic head
416:
415:
412:
406:
405:
398:
394:
393:
361:
357:
356:
352:
351:
348:
344:
343:
340:
336:
335:
332:
328:
327:
324:
318:
317:
314:
310:
309:
306:
302:
301:
298:
294:
293:
290:
286:
285:
281:
280:
277:
273:
272:
269:
265:
264:
261:
257:
256:
253:
249:
248:
245:
241:
240:
235:
231:
230:
227:
221:
220:
216:
215:
210:
206:
205:
202:
198:
197:
184:
180:
179:
176:
172:
171:
168:
164:
163:
160:
156:
155:
123:
119:
118:
101:
97:
96:
91:
87:
86:
80:
71:
70:
64:
63:
62:
61:
58:
57:
46:
38:
37:
29:
26:
9:
6:
4:
3:
2:
974:
963:
960:
958:
955:
953:
950:
948:
945:
943:
940:
938:
935:
933:
930:
928:
925:
923:
920:
918:
915:
913:
910:
908:
907:Dams in Nepal
905:
904:
902:
888:
885:
883:
880:
878:
875:
873:
870:
869:
867:
866:
861:
860:OpenStreetMap
858:
847:
841:
836:
833:
827:
822:
819:
808:
789:
785:
779:
771:
765:
751:
747:
741:
722:
716:
697:
690:
688:
683:
668:
663:
656:
651:
644:
639:
638:
632:
623:
621:
617:
616:Bagmati River
613:
602:
600:
596:
592:
588:
577:
575:
574:Indra Sarobar
570:
568:
564:
560:
556:
552:
548:
547:Kulekhani III
544:
543:Kulekhani III
540:
536:
533:
529:
528:hydroelectric
525:
521:
517:
513:
509:
505:
501:
500:rock-fill dam
497:
496:Kulekhani Dam
487:
479:
477:
473:
470:Total: 106 MW
463:
461:
457:
454:
449:
444:
441:
437:
435:
431:
423:
421:
417:
413:
411:
407:
399:
395:
390:
369:27°32′24.81″N
362:
358:
353:
349:
345:
341:
337:
333:
329:
325:
323:
319:
315:
311:
307:
303:
299:
295:
291:
287:
282:
278:
274:
270:
266:
262:
258:
254:
250:
246:
242:
239:
236:
232:
228:
226:
222:
217:
214:
211:
207:
203:
199:
185:
181:
177:
173:
169:
165:
161:
157:
152:
124:
120:
117:
113:
109:
105:
102:
98:
95:
92:
88:
68:
59:
51:
44:
39:
34:
19:
18:Kulekhani Dam
864:
863:
856:
832:Water portal
818:Nepal portal
792:. Retrieved
788:the original
778:
764:
753:. Retrieved
749:
740:
728:. Retrieved
715:
703:. Retrieved
629:
608:
583:
573:
571:
546:
542:
539:Kulekhani II
538:
534:
495:
493:
453:Francis-type
448:Francis-type
372:85°6′48.82″E
620:Rapti River
555:Kuwait Fund
535:Kulekhani I
443:Pelton-type
384: /
360:Coordinates
170:Operational
146: /
122:Coordinates
901:Categories
755:2021-08-31
678:References
551:World Bank
541:and 14 MW
131:27°35′25″N
750:Khabarhub
563:OPEC Fund
508:Kulekhani
284:Reservoir
134:85°9′21″E
104:Kulekhani
587:penstock
537:, 32 MW
434:Turbines
234:Impounds
209:Owner(s)
100:Location
794:1 March
730:1 March
705:1 March
635:Gallery
622:basin.
510:in the
502:on the
289:Creates
191: (
159:Purpose
90:Country
252:Length
244:Height
167:Status
724:(PDF)
699:(PDF)
524:Nepal
506:near
498:is a
162:Power
94:Nepal
796:2015
732:2015
707:2015
559:UNDP
494:The
410:Type
193:1982
186:1982
178:1977
872:KML
518:in
514:of
903::
748:.
686:^
569:.
557:,
553:,
532:MW
522:,
440:MW
114:,
110:,
106:,
798:.
758:.
734:.
709:.
195:)
20:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.