over three years. The feasibility report suggests a station complex with 4 platforms, 1 pit line, 2 parcel lines, 2 stabling lines, wagon examination line in addition to retaining the existing coaching depot. The expected total investment through the project is Rs 1654 crore including the development of the railway infrastructure for Rs 325 crore. The plan is in such a way that the number of passenger platforms can be increased depending on the increasing traffic demand in the future.
726: 506: 487: 73: 143: 32: 704: 682: 660: 638: 616: 594: 572: 550: 528: 1368: 1354: 1288:
through Kottayam and will also be a terminal point for new trains that are allotted to the state. The Southern Railway has entrusted the Kerala Rail Development Corporation Ltd for preparing a feasibility report on the terminal in October 2020. The proposed terminal will also ease the long-standing traffic congestion in
1292:
and accelerate the development of the railways in the state. The feasibility study says the project is technically feasible and financially viable and recommended for implementation to have higher mobility, meet the traffic growth and economic development of the State. The project can be completed
1287:
to construct an international standard coaching terminal complex. The underutilized land here in Ponnurunni, at the heart of the city, will have the capacity to host trains, apart from having space for repair and maintenance of trains. The new terminal would become a new halt station for trains
1334:
on 27 January 2016, commercially viable railway projects will be identified and handed over to the Special Purpose Vehicle (SPV) to be fast-tracked on a 51:49 per cent equity basis. SPV has discussed about the extension to
1562: 1508: 1526: 45: 106: 153: 1613: 219: 1544: 191: 781: 167:
of the topic and provide significant coverage of it beyond a mere trivial mention. If notability cannot be shown, the article is likely to be
1618: 198: 1452: 1284: 205: 1476: 1623: 51: 1421: 187: 1603: 1381: 1608: 83: 1598: 774: 256: 238: 124: 59: 1264:
will be reduced to 500 km (310 mi) from 637 km (396 mi). Estimated budget for this project is
1438: 212: 92: 931: 921: 767: 164: 98: 1422:"Kerala Rail Development Corporation Limited - K-rail | Company, Contact Details, Directors, Email id." 1593: 1331: 624: 468: 1086:(US$ 600 million) for the 180.46 km (112.13 mi) out of the total 240 km (150 mi) 1494: 1195: 1072: 365: 319: 160: 176: 1387: 1311: 102: 1336: 1319: 1244:. The first proposal for such a line dates back to 1881. By the successful establishment of this 88: 1462: 804:
is a proposed high-speed rail corridor in India that would connect the capital city of Kerala,
1359: 1280: 441: 1256:
rail route will be reduced to 361 km (224 mi) from 776 km (482 mi) and
795: 426: 380: 1279:
Kerala Rail Development Corporation Limited (KRDCL) has submitted a feasibility report to
8: 1087: 1076: 436:
The K-Rail is focused on the planning and implementation of rail line projects including
375: 1340: 1307: 1302: 805: 734: 172: 1208:
is a proposed project to establish faster interconnectivity between the two states of
1064: 168: 1563:"Kerala Rail Development Corpn evinces interest in Angamaly-Sabarimala rail project" 448:
requisite approvals and does processing for the sanctioning of identified Projects.
1323: 1237: 828:
SilverLine (Semi High Speed Rail Corridor from Thiruvananthapuram to Kasaragod)
1373: 1339:. Kerala Rail Development corporation shows interest for constructing this new 290: 20: 1587: 1052: 909:
EMU type train set of 9 cars which is extendable to 12-15 cars in the future
456: 422: 419: 280: 1327: 915:
Seating:  2+2 seating (Business class), 3+2 seating (Standard class)
1245: 1217: 1044: 445: 1225: 1048: 690: 1326:. According to a Memorandum of Understanding (MoU) signed between the 1457: 1261: 1257: 1249: 1241: 1233: 1213: 1068: 809: 800:
The Thiruvananthapuram–Kasargode Semi High Speed Rail Corridor named
558: 514: 437: 72: 1221: 668: 602: 1509:"KRDCL submits report on coaching terminal complex at Ponnurunni" 1315: 159:
Please help to demonstrate the notability of the topic by citing
1407: 1322:) near Sabarimala that had been sanctioned in the year 1998 by 1253: 1229: 1209: 1060: 1056: 712: 536: 430: 336: 1289: 646: 580: 406: 1527:"Railway terminal at Ponnurunni: Nod for feasibility study" 1038: 940:
Estimated project completion cost: Rs 63940.67 Crores
1353: 457:
Thiruvananthapuram–Kasargode Semi High Speed Rail Corridor
1310:
is a proposed 111 km (69 mi) railway line from
392: 19:"K-rail" redirects here. For the traffic barrier, see 154:
notability guidelines for companies and organizations
1349: 1216:
through the construction of a direct short distance
1189: 1439:"Thalassery – Mysore New Broad-Gauge Line (240Kms)" 937:Proposed fare: Rs. 2.75 per km in Standard Class. 433:. The company was incorporated on 3 January 2017. 1283:for the redevelopment of the marshalling yard at 1585: 1200:The Nilambur–Nanjangud railway line also called 463: 351:VP Joy IAS (Chief Secretary, GoK & Chairman) 87:, potentially preventing the article from being 912:Passenger capacity: 625 passengers (9 car set) 429:for the railway infrastructure development in 775: 1274: 1495:"Nanjangud – Nilambur Railway Line (176km)" 934:through Solar & other Renewable Energy 60:Learn how and when to remove these messages 782: 768: 107:reliable, independent, third-party sources 1545:"Coaching terminal plan to take off soon" 354:V. Ajith Kumar, IRSSE (Managing Director) 257:Learn how and when to remove this message 239:Learn how and when to remove this message 125:Learn how and when to remove this message 1039:Thalassery – Mysore New Broad-Gauge Line 101:by replacing them with more appropriate 1614:Transport companies established in 2017 1165: 1138: 955:  529.45 km (328.98 mi) 84:too closely associated with the subject 1586: 1296: 1047:railway line interconnection between 898:79,934 passengers per day in 2025-26 188:"Kerala Rail Development Corporation" 1382:Kerala Rapid Transit Corporation Ltd 1248:line, the existing distance between 451: 136: 66: 25: 425:company under the ownership of the 404:Kerala Rail Development Corporation 272:Kerala Rail Development Corporation 16:Public sector joint venture company 13: 1461:. 25 February 2011. Archived from 444:. Kerala rail is also involved in 14: 1635: 1190:Nilambur – Nanjangud Railway Line 41:This article has multiple issues. 1619:History of Kerala (1947–present) 1366: 1352: 1318:, (and possible extension until 1182: 1174: 1164: 1137: 1106:Thalassery – Mysore New BG Line 1008:292.72 km (181.89 mi) 918:Signalling & communication: 836:529.45 km (328.98 mi) 724: 702: 680: 658: 636: 614: 592: 570: 548: 526: 504: 485: 141: 82:may rely excessively on sources 71: 30: 1624:Proposed railway lines in India 1555: 996:101.73 km (63.21 mi) 725: 505: 486: 49:or discuss these issues on the 1567:Construction Week Online India 1537: 1519: 1501: 1487: 1469: 1445: 1431: 1414: 1400: 1020:24.78 km (15.40 mi) 972:88.41 km (54.94 mi) 442:Detailed Project Reports (DPR) 1: 1604:2017 establishments in Kerala 1393: 1130:200 km/h (120 mph) 1032:12.99 km (8.07 mi) 984:11.52 km (7.16 mi) 927:Power supply & traction: 852:200 km/h (120 mph) 703: 681: 659: 637: 615: 593: 571: 549: 527: 625:Cochin International Airport 7: 1345: 10: 1640: 1609:Railway companies of India 1425:Best Data Provider Company 1300: 1193: 1114:240 km (150 mi) 1079:and estimated a budget of 1073:Konkan Railway Corporation 1043:The proposed project is a 944:Structure of route length: 793: 320:Thiruvananthapuram, Kerala 161:reliable secondary sources 150:The topic of this article 18: 1599:Companies based in Kerala 1275:Coaching terminal complex 1095: 959: 817: 733: 718: 711: 696: 689: 674: 667: 652: 645: 630: 623: 608: 601: 586: 579: 564: 557: 542: 535: 520: 513: 498: 494: 479: 387: 371: 361: 342: 330: 314: 296: 286: 276: 152:may not meet Knowledge's 1388:Kochi Metro Rail Limited 1271:(US$ 480 million). 1180:Expected daily ridership 895:Expected daily ridership 1341:sabarimala railway line 1202:The Golden I T Corridor 1196:Nilambur–Nanjangud line 1154:(US$ 600 million) 874:(US$ 7.9 billion) 1549:The New Indian Express 1531:The New Indian Express 1097:Project Specifications 819:Project Specifications 1481:discuss.itacumens.com 1477:"Indian Railway News" 1360:Rail transport portal 1145:Proposed project cost 865:Proposed project cost 302:; 7 years ago 1465:on 28 February 2011. 1332:Ministry of Railways 890:9 coaches initially 796:Silver Line (K-Rail) 427:Government of Kerala 381:Government of Kerala 300:January 3, 2017 1594:Transport in Kerala 1297:Sabari railway line 1127:Maximum train speed 1077:feasibility studies 849:Maximum train speed 440:and preparation of 376:Government of India 273: 1515:. 31 January 2021. 1308:Sabarimala Railway 1303:Sabarimala Railway 1135:Number of stations 882:2 (up & down) 857:Number of stations 806:Thiruvananthapuram 735:Thiruvananthapuram 366:Passenger railways 271: 156: 1187: 1186: 1036: 1035: 924:Level 2 with LTE 902: 901: 792: 791: 756: 755: 452:Proposed projects 401: 400: 267: 266: 259: 249: 248: 241: 223: 151: 135: 134: 127: 64: 1631: 1578: 1577: 1575: 1573: 1559: 1553: 1552: 1541: 1535: 1534: 1523: 1517: 1516: 1505: 1499: 1498: 1491: 1485: 1484: 1473: 1467: 1466: 1449: 1443: 1442: 1435: 1429: 1428: 1418: 1412: 1411: 1404: 1376: 1371: 1370: 1369: 1362: 1357: 1356: 1281:Southern Railway 1270: 1268: 1167: 1157: 1153: 1151: 1140: 1098: 1093: 1092: 1085: 1083: 1065:cultural capital 949: 948: 873: 871: 820: 815: 814: 784: 777: 770: 764: 728: 727: 706: 705: 684: 683: 662: 661: 640: 639: 618: 617: 596: 595: 574: 573: 552: 551: 530: 529: 508: 507: 489: 488: 477: 476: 464: 397: 394: 310: 308: 303: 274: 270: 262: 255: 244: 237: 233: 230: 224: 222: 181: 145: 144: 137: 130: 123: 119: 116: 110: 75: 67: 56: 34: 33: 26: 1639: 1638: 1634: 1633: 1632: 1630: 1629: 1628: 1584: 1583: 1582: 1581: 1571: 1569: 1561: 1560: 1556: 1543: 1542: 1538: 1525: 1524: 1520: 1507: 1506: 1502: 1493: 1492: 1488: 1475: 1474: 1470: 1453:"News Archives" 1451: 1450: 1446: 1437: 1436: 1432: 1420: 1419: 1415: 1406: 1405: 1401: 1396: 1372: 1367: 1365: 1358: 1351: 1348: 1324:Indian Railways 1305: 1299: 1277: 1266: 1265: 1238:Chamaraja Nagar 1206:Wayanad Railway 1198: 1192: 1155: 1149: 1148: 1096: 1081: 1080: 1041: 1015:Cut & cover 869: 868: 818: 798: 788: 762: 729: 707: 685: 663: 641: 619: 597: 575: 553: 531: 509: 490: 471: 459: 454: 391: 379: 357: 345: 333: 326: 322: 306: 304: 301: 263: 252: 251: 250: 245: 234: 228: 225: 182: 180: 158: 146: 142: 131: 120: 114: 111: 96: 76: 35: 31: 24: 17: 12: 11: 5: 1637: 1627: 1626: 1621: 1616: 1611: 1606: 1601: 1596: 1580: 1579: 1554: 1536: 1518: 1500: 1486: 1468: 1444: 1430: 1413: 1398: 1397: 1395: 1392: 1391: 1390: 1385: 1378: 1377: 1374:Company portal 1363: 1347: 1344: 1301:Main article: 1298: 1295: 1276: 1273: 1220:line between 1194:Main article: 1191: 1188: 1185: 1184: 1181: 1177: 1176: 1173: 1169: 1168: 1163: 1159: 1158: 1146: 1142: 1141: 1136: 1132: 1131: 1128: 1124: 1123: 1120: 1116: 1115: 1112: 1111:Total distance 1108: 1107: 1104: 1100: 1099: 1075:has conducted 1040: 1037: 1034: 1033: 1030: 1029: 1028: 1022: 1021: 1018: 1017: 1016: 1010: 1009: 1006: 1005: 1004: 998: 997: 994: 993: 992: 986: 985: 982: 981: 980: 974: 973: 970: 969: 968: 962: 961: 957: 956: 953: 905:Rolling stock: 900: 899: 896: 892: 891: 888: 884: 883: 880: 876: 875: 866: 862: 861: 858: 854: 853: 850: 846: 845: 842: 838: 837: 834: 833:Total distance 830: 829: 826: 822: 821: 794:Main article: 790: 789: 787: 786: 779: 772: 763:This diagram: 761: 758: 757: 754: 753: 751: 749: 747: 745: 743: 741: 738: 737: 732: 730: 723: 721: 719: 716: 715: 710: 708: 701: 699: 697: 694: 693: 688: 686: 679: 677: 675: 672: 671: 666: 664: 657: 655: 653: 650: 649: 644: 642: 635: 633: 631: 628: 627: 622: 620: 613: 611: 609: 606: 605: 600: 598: 591: 589: 587: 584: 583: 578: 576: 569: 567: 565: 562: 561: 556: 554: 547: 545: 543: 540: 539: 534: 532: 525: 523: 521: 518: 517: 512: 510: 503: 501: 499: 496: 495: 493: 491: 484: 482: 480: 473: 472: 467: 458: 455: 453: 450: 399: 398: 389: 385: 384: 373: 369: 368: 363: 359: 358: 356: 355: 352: 348: 346: 343: 340: 339: 334: 331: 328: 327: 324: 318: 316: 312: 311: 298: 294: 293: 291:Rail transport 288: 284: 283: 278: 265: 264: 247: 246: 149: 147: 140: 133: 132: 79: 77: 70: 65: 39: 38: 36: 29: 21:Jersey barrier 15: 9: 6: 4: 3: 2: 1636: 1625: 1622: 1620: 1617: 1615: 1612: 1610: 1607: 1605: 1602: 1600: 1597: 1595: 1592: 1591: 1589: 1568: 1564: 1558: 1550: 1546: 1540: 1532: 1528: 1522: 1514: 1513:@businessline 1510: 1504: 1496: 1490: 1482: 1478: 1472: 1464: 1460: 1459: 1454: 1448: 1440: 1434: 1426: 1423: 1417: 1409: 1403: 1399: 1389: 1386: 1383: 1380: 1379: 1375: 1364: 1361: 1355: 1350: 1343: 1342: 1338: 1333: 1329: 1325: 1321: 1317: 1313: 1309: 1304: 1294: 1291: 1286: 1282: 1272: 1263: 1259: 1255: 1251: 1247: 1243: 1239: 1235: 1231: 1227: 1223: 1219: 1215: 1211: 1207: 1203: 1197: 1179: 1178: 1172:Rolling stock 1171: 1170: 1161: 1160: 1156:for 180.46 Km 1147: 1144: 1143: 1134: 1133: 1129: 1126: 1125: 1121: 1118: 1117: 1113: 1110: 1109: 1105: 1103:Project title 1102: 1101: 1094: 1091: 1089: 1078: 1074: 1070: 1066: 1062: 1058: 1054: 1050: 1046: 1031: 1026: 1025: 1024: 1023: 1019: 1014: 1013: 1012: 1011: 1007: 1002: 1001: 1000: 999: 995: 990: 989: 988: 987: 983: 978: 977: 976: 975: 971: 966: 965: 964: 963: 958: 954: 952:Total Length 951: 950: 947: 945: 941: 938: 935: 933: 928: 925: 923: 919: 916: 913: 910: 907: 906: 897: 894: 893: 889: 887:Rolling stock 886: 885: 881: 878: 877: 867: 864: 863: 859: 856: 855: 851: 848: 847: 843: 840: 839: 835: 832: 831: 827: 825:Project title 824: 823: 816: 813: 811: 807: 803: 797: 785: 780: 778: 773: 771: 766: 765: 760: 759: 752: 750: 748: 746: 744: 742: 740: 739: 736: 731: 722: 720: 717: 714: 709: 700: 698: 695: 692: 687: 678: 676: 673: 670: 665: 656: 654: 651: 648: 643: 634: 632: 629: 626: 621: 612: 610: 607: 604: 599: 590: 588: 585: 582: 577: 568: 566: 563: 560: 555: 546: 544: 541: 538: 533: 524: 522: 519: 516: 511: 502: 500: 497: 492: 483: 481: 478: 475: 474: 470: 466: 465: 462: 449: 447: 443: 439: 434: 432: 428: 424: 423:joint venture 421: 420:public sector 417: 416: 412:(stylized as 411: 408: 405: 396: 390: 386: 382: 377: 374: 370: 367: 364: 360: 353: 350: 349: 347: 341: 338: 335: 329: 321: 317: 313: 299: 295: 292: 289: 285: 282: 281:Public sector 279: 275: 269: 261: 258: 243: 240: 232: 221: 218: 214: 211: 207: 204: 200: 197: 193: 190: â€“  189: 185: 184:Find sources: 178: 174: 170: 166: 162: 155: 148: 139: 138: 129: 126: 118: 108: 104: 100: 94: 90: 86: 85: 80:This article 78: 74: 69: 68: 63: 61: 54: 53: 48: 47: 42: 37: 28: 27: 22: 1570:. Retrieved 1566: 1557: 1548: 1539: 1530: 1521: 1512: 1503: 1489: 1480: 1471: 1463:the original 1456: 1447: 1433: 1424: 1416: 1402: 1328:Kerala State 1306: 1278: 1240:district of 1228:district of 1205: 1201: 1199: 1042: 943: 942: 939: 936: 929: 926: 920: 917: 914: 911: 908: 904: 903: 872:66,079 crore 801: 799: 460: 435: 414: 413: 409: 403: 402: 315:Headquarters 277:Company type 268: 253: 235: 229:October 2019 226: 216: 209: 202: 195: 183: 121: 115:October 2019 112: 97:Please help 81: 57: 50: 44: 43:Please help 40: 1269:4,000 crore 1246:broad gauge 1218:broad gauge 1152:5,000 crore 1119:Travel time 1084:5,000 crore 1051:of central 1045:broad gauge 841:Travel time 812:in Kerala. 802:Silver Line 415:Kerala-rail 410:Kerala-Rail 332:Area served 165:independent 1588:Categories 1394:References 1226:Malappuram 1055:region of 1049:Thalassery 960:Structure 691:Chengannur 393:keralarail 344:Key people 307:2017-01-03 199:newspapers 173:redirected 99:improve it 89:verifiable 46:improve it 1458:The Hindu 1285:Ponnuruni 1262:Bangalore 1258:Ernakulam 1250:Ernakulam 1242:Karnataka 1234:Nanjangud 1214:Karnataka 1069:Karnataka 810:Kasaragod 559:Kozhikode 515:Kasargode 446:procuring 163:that are 103:citations 52:talk page 1346:See also 1330:and the 1312:Angamaly 1222:Nilambur 1122:5 hours 946:  844:4 hours 669:Kottayam 603:Thrissur 362:Services 287:Industry 1408:"About" 1337:Punalur 1320:punalur 1316:Erumeli 1224:in the 1088:BG line 1053:Malabar 1027:Bridges 991:Cutting 967:Viaduct 438:surveys 418:) is a 388:Website 305: ( 297:Founded 213:scholar 177:deleted 93:neutral 1572:28 May 1254:Mysore 1230:Kerala 1210:Kerala 1162:Tracks 1071:. The 1063:, the 1061:Mysore 1057:Kerala 979:Tunnel 879:Tracks 713:Kollam 537:Kannur 469:Legend 461: 431:Kerala 378:(49%) 337:Kerala 215:  208:  201:  194:  186:  169:merged 1290:Kochi 932:KSEBL 930:From 808:with 647:Kochi 581:Tirur 407:d/b/a 383:(51%) 372:Owner 325:India 220:JSTOR 206:books 175:, or 1574:2021 1232:and 1212:and 1059:and 1003:Bank 922:ETCS 783:edit 776:talk 769:view 395:.com 192:news 91:and 1314:to 1236:in 1204:or 1166:TBA 1139:TBA 1067:of 860:11 105:to 1590:: 1565:. 1547:. 1529:. 1511:. 1479:. 1455:. 1260:- 1252:- 1183:— 1175:— 1090:. 323:, 171:, 55:. 1576:. 1551:. 1533:. 1497:. 1483:. 1441:. 1427:. 1410:. 1384:. 1267:â‚ą 1150:â‚ą 1082:â‚ą 870:â‚ą 309:) 260:) 254:( 242:) 236:( 231:) 227:( 217:· 210:· 203:· 196:· 179:. 157:. 128:) 122:( 117:) 113:( 109:. 95:. 62:) 58:( 23:.

Index

Jersey barrier
improve it
talk page
Learn how and when to remove these messages

too closely associated with the subject
verifiable
neutral
improve it
citations
reliable, independent, third-party sources
Learn how and when to remove this message
notability guidelines for companies and organizations
reliable secondary sources
independent
merged
redirected
deleted
"Kerala Rail Development Corporation"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message
Learn how and when to remove this message
Public sector
Rail transport
Thiruvananthapuram, Kerala
Kerala

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑