Knowledge

Interstate 885

Source 📝

565:
diverted to other priorities such as NC 147, the Durham Freeway. The portion of NC 147 concurrent with the proposed Interstate opened in the early 1970s, including accommodation for an interchange with the Connector. The project would resurface in the 1990s when the North Carolina Department of Transportation (NCDOT) studied it again, but it would not receive funding until it appeared in the 2009–2015 Transportation Improvement Plan. In the meantime, as part of a larger widening project on I-85, the early 2000s saw the reconstruction of the US 70 freeway between I-85 and Cheek Road, widening the section to six lanes and bringing it up to modern
576:(FHWA). Later sign plans from NCDOT indicated that I-885 was expected to be signed immediately upon the completion of the East End Connector, pending approval from the FHWA. Construction on the East End Connector began in April of the following year. In addition to the construction of a short segment of new freeway between NC 147 and US 70, the section of US 70 between Cheek Road and the connector was being realigned and widened to six lanes. Work at the interchange between NC 147 and the connector was expected to be completed in June 2018, but work in that area continued past that date, as the completion date got pushed back to mid-2022. 683: 227: 1126: 1071: 33: 1006: 152: 28: 709: 696: 1139: 1084: 928: 1097: 1000: 964: 1672: 825: 722: 934: 689: 413: 233: 126: 1145: 1103: 1090: 1018: 1012: 970: 831: 715: 398: 197: 192: 164: 158: 140: 507:, three closely-spaced interchanges link the route to East Cornwallis Road, T.W. Alexander Drive, and Ellis Road. At the Durham city line, NC 147 begins and diverges toward downtown Durham, while I-885 heads northeast on the East End Connector before joining US 70, curving to the northwest concurrent with the latter route. The freeway turns due north as it comes to 1132: 1077: 819: 728: 702: 253: 187: 107: 1873: 503:, which it inherits from the portion of NC 540 south of the aforementioned interchange. It has a single interchange with Davis Drive and Hopson Road between its termini. NC 885 ends at the interchange with I-40, at which I-885 promptly begins. Running north on the Durham Freeway (former NC 147) through the 592:
The NCDOT 2020–2029 Final STIP released in September 2019 indicated a project that would widen 3.9 miles (6.3 km) of I-885 to six lanes from the East End Connector Project south to I-40 at a cost of $ 1.8 million. However, the Durham Chapel Hill Carrboro Metropolitan Planning Organization
564:
The first section of what eventually became I-885 to be constructed was the portion of US 70 between the East End Connector and I-85, completed by 1957 with US 70 relocated onto it. The East End Connector first appeared in Durham's 1959 thoroughfare plan but was shelved and its funding
583:
approved the establishment of I-885; this was followed with the East End Connector opening to traffic on June 30, 2022, at which point I-885 was signed on the entirety of its designated corridor. The portion of former NC 147 from NC 540 to I-40 was redesignated as NC 885.
487:, which were redesignated I-885 and NC 885, respectively. The route is cosigned with US 70 from exit 10 to its northern terminus. The route provides a continuous freeway bypass east of downtown Durham and also provides freeway access from I-40 and I-85 to the 545:
or other interoperable ETC systems. Drivers who do not participate in the ETC program will receive a bill in the mail and will have 30 days from date on bill before additional fees and civil penalties are applied.
1359: 580: 1607: 1241: 1924: 345: 572:
The I-885 designation did not become public knowledge until the release of signing plans in 2014, though NCDOT had not yet received approval from the
1929: 1021: 541:(ETC) and are enforced by video cameras. Several gantries are located along the route and entrance/exit ramps, where they collect tolls via the 508: 167: 1914: 1440: 366: 1615: 1418: 1392: 1366: 66: 1525: 1581: 1388: 1465: 449: 376: 1846: 1807: 1333: 371: 1909: 771: 1274: 601:
In 2012, a proposal to extend NC 147 (now NC 885) from its current southern terminus south to McCrimmon Parkway, in
1723: 445: 335: 1299: 1661: 381: 340: 559: 1714: 350: 1329: 483:
NC 147 was truncated and removed from the southern half of the Durham Freeway and the northern section of the
1831: 1821: 1815: 1792: 1786: 1676: 1153: 1149: 1115: 1111: 1107: 974: 835: 740: 736: 732: 473: 461: 457: 453: 401: 256: 237: 208: 204: 200: 143: 110: 58: 1166:
Northern terminus of I-885; north end of US 70 overlap; ramp to southbound I-85 unnumbered; former exit 285
744: 573: 555: 520: 1648: 1643: 766: 606: 358: 303: 566: 1033: 847: 652: 647: 602: 330: 299: 241: 1934: 1682: 1414: 1119: 938: 538: 469: 416: 129: 1854: 1555: 1157: 1025: 839: 512: 322: 171: 1773: 1768: 1763: 1757: 1749: 1743: 499:
NC 885 begins at the interchange with NC 540. The whole route carries the moniker of the
978: 843: 752: 748: 1585: 1919: 1707: 1496: 1029: 942: 911: 869: 504: 488: 465: 260: 133: 605:, was scheduled for re-prioritization. As of October 2020, the project is scheduled for 1533: 1446:(Report). Washington, DC: American Association of State Highway and Transportation Officials 1161: 1660: 8: 853: 758: 532: 516: 500: 484: 1190: 1700: 1652: 1608:"Crosstown Traffic—RTP Commuters: The NC 147 Southern Spur Is Closed Today, for Good" 1692: 1275:"Durham leaders say new East End Connector will cut drivers' commute by 10 minutes" 593:(DCHC MPO) removed this proposal from its plans, leaving this project in question. 1687: 1303: 852:
Northern end of NC 885 and southern end of I-885; northern terminus of the
1860: 1836: 1826: 1802: 1797: 1778: 289: 1903: 1729: 1330:"I-885, the next highway in Durham: What it looks like and when it will open" 542: 279: 1584:(Press release). North Carolina Department of Transportation. Archived from 662: 1202: 468:
area. The route consists of two previously preexisting segments of freeway—
519:. After continuing north and meeting Cheek Road, the Interstate ends at a 1438: 1246: 569:
as well as adding the missing movements at the interchange with I-85.
1441:"2022 Spring Meeting Report to the Council on Highways and Streets" 1067: 960: 679: 1278: 1471:. North Carolina Department of Transportation. September 5, 2019 665: 660: 1688:
NC Future Interstates: Future I-885 / Durham East End Connector
1671: 816: 799: 1532:. North Carolina Department of Transportation. Archived from 1171:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
1466:"2020–2029 State Transportation Improvement Program (STIP)" 46:
I-885 highlighted in red; NC 885 highlighted in purple
32: 1497:"Current Projects | Durham Chapel Hill Carrboro MPO, NC" 27: 1872: 1439:
Special Committee on U.S. Route Numbering (May 2022).
1165: 1064: 982: 957: 756: 676: 1722: 515:
at a junction that was reconstructed as a compressed
1389:"Groundbreaking for the East End Connector Project" 1302:. North Carolina Turnpike Authority. Archived from 609:acquisition in 2024 and will break ground in 2027. 851: 813: 802: 796: 1354: 1352: 1350: 1901: 1614:. Raleigh, NC. September 6, 2011. Archived from 1582:"Section of N.C. 147 in Durham to Close Sept. 6" 1925:Transportation in Durham County, North Carolina 1242:"Interstate 885 and North Carolina Highway 885" 1347: 560:U.S. Route 70 in North Carolina § History 452:in the U.S. state of North Carolina. It links 1708: 1381: 38:Interstate 885 and North Carolina Highway 885 1407: 480:, which opened to traffic on June 30, 2022. 1574: 1560:North Carolina Department of Transportation 1419:North Carolina Department of Transportation 1393:North Carolina Department of Transportation 1367:North Carolina Department of Transportation 1323: 1321: 947:Left exit, southern terminus of NC 147 788:Signed exit 2 northbound, exit 3 southbound 1715: 1701: 1519: 1517: 803:Permanently closed as of September 6, 2011 491:and (via NC 147) to downtown Durham. 1665: 1490: 1488: 1486: 556:North Carolina Highway 147 § History 1930:Transportation in Durham, North Carolina 1600: 1318: 1236: 1234: 1514: 1327: 537:Tolls along NC 885 are charged by 1902: 1483: 1268: 1266: 1264: 1915:Interstate Highways in North Carolina 1696: 1458: 1272: 1231: 1058: 1050: 1041: 996: 987: 951: 924: 915: 903: 894: 887: 878: 868: 859: 807: 792: 784: 775: 670: 656: 1662:Template:Attached KML/Interstate 885 494: 1501:Durham Chapel Hill Carrboro MPO, NC 1261: 596: 13: 757:Southern terminus of NC 885; 631: 14: 1946: 1634: 1523: 1494: 444:) is an 11.5-mile (18.5 km) 1871: 1670: 1143: 1137: 1130: 1124: 1101: 1095: 1088: 1082: 1075: 1069: 1016: 1010: 1004: 998: 968: 962: 932: 926: 829: 823: 817: 726: 720: 713: 707: 700: 694: 687: 681: 411: 396: 251: 231: 225: 195: 190: 185: 162: 156: 150: 138: 124: 105: 76:11.5 mi (18.5 km) 31: 26: 1548: 1328:Vaughan, Dawn (July 18, 2018). 1273:Casey, Monica (June 30, 2022). 983:South end of US 70 overlap 438:North Carolina Highway 885 1432: 1292: 761:continues as NC 540 south 574:Federal Highway Administration 521:semi-directional T interchange 476:to the north—connected by the 1: 1910:Auxiliary Interstate Highways 1224: 666:Proposed extension (unfunded) 626: 523:with its parent route, I-85. 359:North Carolina Highway System 612: 567:Interstate Highway standards 446:auxiliary Interstate Highway 7: 1415:"NCDOT: East End Connector" 10: 1951: 765: 553: 549: 539:electronic toll collection 530: 216:North Carolina Highway 885 1880: 1869: 1738: 1683:NCDOT: East End Connector 1170: 1061: 1053: 1047: 1044: 1037: 993: 990: 954: 946: 921: 918: 910: 906: 900: 897: 890: 884: 881: 874: 865: 862: 810: 794: 787: 785:Davis Drive / Hopson Road 781: 778: 770: 673: 658: 651: 646: 641: 638: 635: 630: 625: 622: 619: 587: 389: 323:Interstate Highway System 318: 313: 309: 295: 285: 275: 270: 266: 247: 220: 215: 181: 117: 101: 96: 80: 72: 64: 56: 51: 44: 23: 16:Highway in North Carolina 1666:KML is not from Wikidata 1210:     1198:     1186:     1177:     526: 1612:The News & Observer 872:/ East Cornwallis Road 870:Research Triangle Park 772:Research Triangle Park 505:Research Triangle Park 489:Research Triangle Park 1679:at Wikimedia Commons 1588:on December 24, 2012 1556:"N.C. 147 Extension" 1536:on November 14, 2012 1300:"NC Quick Pass FAQs" 888:T.W. Alexander Drive 800:T.W. Alexander Drive 854:Triangle Expressway 759:Triangle Expressway 533:Triangle Expressway 517:diamond interchange 509:US 70 Business 501:Triangle Expressway 485:Triangle Expressway 430:Interstate 885 118:Major intersections 57:Auxiliary route of 1526:"Project #U-4763A" 478:East End Connector 1935:Research Triangle 1897: 1896: 1675:Media related to 1618:on March 27, 2012 1562:. October 7, 2021 1306:on April 14, 2014 1222: 1221: 663:McCrimmon Parkway 511:(US 70 Bus)/ 495:Route description 472:to the south and 427: 426: 423: 422: 52:Route information 1942: 1875: 1732: 1726: 1725:Auxiliary routes 1717: 1710: 1703: 1694: 1693: 1674: 1656: 1628: 1627: 1625: 1623: 1604: 1598: 1597: 1595: 1593: 1578: 1572: 1571: 1569: 1567: 1552: 1546: 1545: 1543: 1541: 1521: 1512: 1511: 1509: 1507: 1492: 1481: 1480: 1478: 1476: 1470: 1462: 1456: 1455: 1453: 1451: 1445: 1436: 1430: 1429: 1427: 1425: 1411: 1405: 1404: 1402: 1400: 1395:. April 22, 2015 1385: 1379: 1378: 1376: 1374: 1364: 1356: 1345: 1344: 1342: 1340: 1325: 1316: 1315: 1313: 1311: 1296: 1290: 1289: 1287: 1285: 1270: 1259: 1258: 1256: 1254: 1238: 1215: 1211: 1206: 1199: 1194: 1187: 1182: 1178: 1148: 1147: 1146: 1141: 1140: 1135: 1134: 1133: 1128: 1127: 1106: 1105: 1104: 1099: 1098: 1093: 1092: 1091: 1086: 1085: 1080: 1079: 1078: 1073: 1072: 1020: 1019: 1015: 1014: 1013: 1008: 1007: 1002: 1001: 973: 972: 971: 966: 965: 937: 936: 935: 930: 929: 834: 833: 832: 827: 826: 821: 820: 733:NC 540 Toll 731: 730: 729: 724: 723: 718: 717: 716: 711: 710: 705: 704: 703: 698: 697: 692: 691: 690: 685: 684: 633: 628: 617: 616: 597:NC 885 extension 419: 415: 414: 404: 400: 399: 391: 390: 255: 254: 238:NC 540 Toll 236: 235: 234: 229: 228: 199: 198: 194: 193: 189: 188: 166: 165: 161: 160: 159: 154: 153: 142: 141: 128: 127: 109: 108: 91: 89: 35: 30: 21: 20: 1950: 1949: 1945: 1944: 1943: 1941: 1940: 1939: 1900: 1899: 1898: 1893: 1876: 1867: 1734: 1730: 1724: 1721: 1667: 1664: 1659: 1658: 1657: 1641: 1637: 1632: 1631: 1621: 1619: 1606: 1605: 1601: 1591: 1589: 1580: 1579: 1575: 1565: 1563: 1554: 1553: 1549: 1539: 1537: 1530:Project Details 1522: 1515: 1505: 1503: 1493: 1484: 1474: 1472: 1468: 1464: 1463: 1459: 1449: 1447: 1443: 1437: 1433: 1423: 1421: 1413: 1412: 1408: 1398: 1396: 1387: 1386: 1382: 1372: 1370: 1369:. June 24, 2014 1362: 1358: 1357: 1348: 1338: 1336: 1326: 1319: 1309: 1307: 1298: 1297: 1293: 1283: 1281: 1271: 1262: 1252: 1250: 1240: 1239: 1232: 1227: 1218: 1213: 1209: 1201: 1197: 1189: 1185: 1180: 1176: 1172: 1144: 1142: 1138: 1136: 1131: 1129: 1125: 1123: 1122: 1102: 1100: 1096: 1094: 1089: 1087: 1083: 1081: 1076: 1074: 1070: 1068: 1054:Former exit 286 1022:US 70 Bus. 1017: 1011: 1009: 1005: 1003: 999: 997: 969: 967: 963: 961: 933: 931: 927: 925: 830: 828: 824: 822: 818: 727: 725: 721: 719: 714: 712: 708: 706: 701: 699: 695: 693: 688: 686: 682: 680: 615: 599: 590: 562: 552: 535: 529: 497: 412: 410: 397: 395: 252: 232: 230: 226: 224: 196: 191: 186: 177: 168:US 70 Bus. 163: 157: 155: 151: 149: 139: 125: 106: 87: 85: 47: 40: 39: 36: 17: 12: 11: 5: 1948: 1938: 1937: 1932: 1927: 1922: 1917: 1912: 1895: 1894: 1892: 1891: 1888: 1885: 1881: 1878: 1877: 1870: 1868: 1866: 1865: 1864: 1863: 1851: 1850: 1849: 1844: 1839: 1834: 1829: 1824: 1816:North Carolina 1812: 1811: 1810: 1805: 1800: 1795: 1787:South Carolina 1783: 1782: 1781: 1776: 1771: 1766: 1754: 1753: 1752: 1739: 1736: 1735: 1720: 1719: 1712: 1705: 1697: 1691: 1690: 1685: 1680: 1677:Interstate 885 1640: 1639: 1638: 1636: 1635:External links 1633: 1630: 1629: 1599: 1573: 1547: 1513: 1482: 1457: 1431: 1406: 1380: 1346: 1334:The Herald-Sun 1317: 1291: 1260: 1229: 1228: 1226: 1223: 1220: 1219: 1217: 1216: 1207: 1195: 1183: 1173: 1168: 1167: 1164: 1066: 1063: 1060: 1056: 1055: 1052: 1049: 1046: 1043: 1039: 1038: 1036: 995: 992: 989: 985: 984: 981: 959: 956: 953: 949: 948: 945: 923: 920: 917: 914: 908: 907: 905: 902: 899: 896: 892: 891: 889: 886: 883: 880: 876: 875: 873: 867: 864: 861: 857: 856: 850: 815: 812: 809: 805: 804: 801: 798: 795: 793: 790: 789: 786: 783: 780: 777: 774: 769: 763: 762: 755: 678: 675: 672: 668: 667: 664: 661: 659: 657: 655: 650: 644: 643: 640: 637: 634: 629: 624: 621: 614: 611: 598: 595: 589: 586: 551: 548: 531:Main article: 528: 525: 496: 493: 425: 424: 421: 420: 407: 405: 387: 386: 385: 384: 379: 374: 369: 363: 362: 354: 353: 348: 343: 338: 333: 327: 326: 316: 315: 314:Highway system 311: 310: 307: 306: 297: 293: 292: 290:North Carolina 287: 283: 282: 277: 273: 272: 268: 267: 264: 263: 249: 248:North end 245: 244: 222: 221:South end 218: 217: 213: 212: 183: 182:North end 179: 178: 176: 175: 147: 136: 121: 119: 115: 114: 103: 102:South end 99: 98: 97:Interstate 885 94: 93: 82: 78: 77: 74: 70: 69: 65:Maintained by 62: 61: 54: 53: 49: 48: 45: 42: 41: 37: 25: 24: 15: 9: 6: 4: 3: 2: 1947: 1936: 1933: 1931: 1928: 1926: 1923: 1921: 1920:Interstate 85 1918: 1916: 1913: 1911: 1908: 1907: 1905: 1889: 1886: 1883: 1882: 1879: 1874: 1862: 1859: 1858: 1857: 1856: 1852: 1848: 1845: 1843: 1840: 1838: 1835: 1833: 1830: 1828: 1825: 1823: 1820: 1819: 1818: 1817: 1813: 1809: 1806: 1804: 1801: 1799: 1796: 1794: 1791: 1790: 1789: 1788: 1784: 1780: 1777: 1775: 1772: 1770: 1767: 1765: 1762: 1761: 1760: 1759: 1755: 1751: 1748: 1747: 1746: 1745: 1741: 1740: 1737: 1733: 1731:Interstate 85 1727: 1718: 1713: 1711: 1706: 1704: 1699: 1698: 1695: 1689: 1686: 1684: 1681: 1678: 1673: 1669: 1668: 1663: 1654: 1650: 1646: 1645: 1617: 1613: 1609: 1603: 1587: 1583: 1577: 1561: 1557: 1551: 1535: 1531: 1527: 1520: 1518: 1502: 1498: 1491: 1489: 1487: 1467: 1461: 1442: 1435: 1420: 1416: 1410: 1394: 1390: 1384: 1368: 1361: 1360:"Signing.pdf" 1355: 1353: 1351: 1335: 1331: 1324: 1322: 1305: 1301: 1295: 1280: 1276: 1269: 1267: 1265: 1249: 1248: 1243: 1237: 1235: 1230: 1208: 1204: 1196: 1192: 1184: 1181:Closed/former 1175: 1174: 1169: 1163: 1159: 1156:north – 1155: 1152:north / 1151: 1121: 1117: 1114:south / 1113: 1110:south / 1109: 1057: 1040: 1035: 1031: 1027: 1023: 986: 980: 976: 950: 944: 941:north – 940: 913: 909: 893: 877: 871: 858: 855: 849: 845: 841: 837: 806: 791: 773: 768: 764: 760: 754: 750: 746: 742: 738: 734: 669: 654: 649: 645: 618: 610: 608: 604: 594: 585: 582: 579:In May 2022, 577: 575: 570: 568: 561: 557: 547: 544: 543:NC Quick Pass 540: 534: 524: 522: 518: 514: 510: 506: 502: 492: 490: 486: 481: 479: 475: 471: 467: 463: 459: 455: 451: 450:state highway 447: 443: 439: 435: 431: 418: 408: 406: 403: 393: 392: 388: 383: 380: 378: 375: 373: 370: 368: 365: 364: 361: 360: 356: 355: 352: 349: 347: 344: 342: 339: 337: 334: 332: 329: 328: 325: 324: 320: 319: 317: 312: 308: 305: 301: 298: 294: 291: 288: 284: 281: 280:United States 278: 274: 269: 265: 262: 258: 250: 246: 243: 239: 223: 219: 214: 210: 206: 202: 184: 180: 173: 169: 148: 145: 137: 135: 131: 123: 122: 120: 116: 112: 104: 100: 95: 88:June 30, 2022 84:June 30, 2022 83: 79: 75: 71: 68: 63: 60: 55: 50: 43: 34: 29: 22: 19: 1853: 1841: 1814: 1785: 1756: 1742: 1642: 1622:September 6, 1620:. Retrieved 1616:the original 1611: 1602: 1590:. Retrieved 1586:the original 1576: 1564:. Retrieved 1559: 1550: 1540:December 13, 1538:. Retrieved 1534:the original 1529: 1504:. Retrieved 1500: 1475:September 7, 1473:. Retrieved 1460: 1450:December 10, 1448:. Retrieved 1434: 1424:December 12, 1422:. Retrieved 1409: 1399:December 12, 1397:. Retrieved 1383: 1373:December 12, 1371:. Retrieved 1339:December 12, 1337:. Retrieved 1308:. Retrieved 1304:the original 1294: 1282:. Retrieved 1251:. Retrieved 1245: 1212:   1200:   1188:   1179:   1118:west – 1024:west / 977:east – 639:Destinations 607:right-of-way 600: 591: 578: 571: 563: 536: 498: 482: 477: 441: 437: 433: 429: 428: 357: 321: 18: 1247:Google Maps 1191:Concurrency 1034:Wake Forest 939:NC 147 848:Chapel Hill 653:Morrisville 603:Morrisville 470:NC 147 454:NC 540 442:NC 885 417:NC 901 242:Morrisville 130:NC 147 1904:Categories 1592:August 19, 1225:References 1205:transition 1162:Petersburg 1154:US 15 1120:Greensboro 1116:US 70 1112:US 15 1051:Cheek Road 1026:NC 98 975:US 70 904:Ellis Road 840:NC 54 554:See also: 513:NC 98 474:US 70 367:Interstate 209:US 70 205:US 15 172:NC 98 144:US 70 1884:Cancelled 1310:April 13, 1158:Henderson 745:US 1 613:Exit List 336:Auxiliary 211:in Durham 174:in Durham 146:in Durham 1890:Proposed 1855:Virginia 1847:Business 1808:Business 1644:KML file 1284:June 30, 1214:Unopened 1193:terminus 1028: – 842: – 747: – 743: / 739: / 623:Location 346:Business 341:Suffixed 296:Counties 271:Location 207: / 203: / 170: / 92:–present 1758:Georgia 1744:Alabama 1524:Staff. 1506:May 12, 1495:Staff. 1279:WRAL-TV 1253:July 1, 1244:(Map). 979:Raleigh 844:Raleigh 753:Sanford 749:Raleigh 550:History 464:in the 276:Country 86: ( 81:Existed 1887:Former 1566:May 1, 1030:Durham 943:Durham 912:Durham 767:Durham 620:County 588:Future 581:AASHTO 558:, and 466:Durham 436:) and 382:Scenic 351:Future 304:Durham 134:Durham 113:in RTP 73:Length 1469:(PDF) 1444:(PDF) 1363:(PDF) 1203:Route 782:2 / 3 741:I-540 642:Notes 527:Tolls 434:I-885 402:I-840 377:State 286:State 67:NCDOT 1653:help 1649:edit 1624:2011 1594:2011 1568:2021 1542:2012 1508:2024 1477:2019 1452:2022 1426:2018 1401:2018 1375:2018 1341:2018 1312:2014 1286:2022 1255:2022 1150:I-85 1108:I-85 1062:18.5 1059:11.5 1045:17.4 1042:10.8 991:15.8 955:13.8 919:12.4 836:I-40 737:I-40 648:Wake 636:Exit 462:I-85 458:I-40 456:and 448:and 331:Main 300:Wake 257:I-40 201:I-85 111:I-40 59:I-85 1861:785 1842:885 1837:785 1832:685 1827:485 1822:285 1803:585 1798:385 1793:185 1779:985 1774:485 1769:285 1764:185 1750:685 1728:of 988:9.8 952:8.6 916:7.7 898:9.3 895:5.8 882:7.6 879:4.7 863:6.6 860:4.1 838:to 811:5.0 808:3.1 779:1.1 776:0.7 735:to 674:0.0 671:0.0 460:to 261:RTP 259:in 240:in 132:in 1906:: 1651:• 1610:. 1558:. 1528:. 1516:^ 1499:. 1485:^ 1417:. 1391:. 1365:. 1349:^ 1332:. 1320:^ 1277:. 1263:^ 1233:^ 1160:, 1065:13 1048:12 1032:, 994:11 958:10 846:, 751:, 632:km 627:mi 409:→ 394:← 372:US 302:, 1716:e 1709:t 1702:v 1655:) 1647:( 1626:. 1596:. 1570:. 1544:. 1510:. 1479:. 1454:. 1428:. 1403:. 1377:. 1343:. 1314:. 1288:. 1257:. 922:9 901:8 885:7 866:6 814:5 797:4 677:1 440:( 432:( 90:)

Index

Interstate 885 and North Carolina Highway 885 marker
Interstate 885 and North Carolina Highway 885 marker
I-85
NCDOT
I-40
NC 147
Durham
US 70
US 70 Bus.
NC 98
I-85
US 15
US 70
NC 540 Toll
Morrisville
I-40
RTP
United States
North Carolina
Wake
Durham
Interstate Highway System
Main
Auxiliary
Suffixed
Business
Future
North Carolina Highway System
Interstate
US

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.