Knowledge

Interstate 140 (North Carolina)

Source πŸ“

860:
sections of the Wilmington bypass. The justification in the paperwork for using NC 140 was it would serve as a temporary designation until the entire bypass was complete and the remaining segments could be submitted to AASHTO approval as I-140. The other rationalization was to provide an alternate designation for the entire bypass if a proposal to return US 17 to the streets of Wilmington was enacted. This was prevalent as only the New Hanover segment of I-140 was concurrent with US 17. NCDOT officials in the summer of 2014 called for returning US 17 to its original routing through Wilmington on Market Street, with the exception of placing a part of it on Military Cutoff Road and Oleander Drive. This was due to traffic volume on these roads being large enough to merit a route designation. The proposal was endorsed by the Wilmington Area Transportation Advisory Committee in August 2014. AASHTO's Special Committee on U.S. Route Numbering approved the request on May 14, 2015. On May 17, 2017, US 17 was officially rerouted through Wilmington.
691:, serving as an additional crossing of the Cape Fear River and providing for better regional connectivity. However, the project was not included as part of the department's construction schedule until 1989. In 1991, NCDOT initiated the evaluation of a pair of proposed routes for the Northern Outer Loop. The northern routing was to have been approximately 22 miles (35 km) in length; it would have resulted in the relocation of 19 homes and 19 businesses while traversing 1,247 acres (505 ha) of wetlands, nine potential hazardous waste sites, and five historic sites. The southern routing was to have been approximately 20 miles (32 km) in length; it would have resulted in the relocation of 58 homes and eight businesses while traversing 2,064 acres (835 ha) of wetlands, seven potential hazardous waste sites, and eight historic sites. 495:(US 421) and an eastward extension to US 17 in June 2006. US 17 was routed along the entirety of the freeway between Kirkland and US 421, running concurrently with I-140. Construction on the western segment between Winnabow and US 74/US 76 began in March 2010 and was opened in September 2014. This segment was temporarily designated as NC 140 as it lacked connection with I-140 to the east. The final segment between US 74/US 76 and US 421 began construction in 2014 and was completed in 2017. I-140 was routed along the entirety of the freeway west of I-40. Additionally, US 17 was removed from its concurrency with I-140, being rerouted through Wilmington in 2017. The remaining section between I-40 and Kirkland was subsequently renumbered as NC 140. 695: 703:
residents and officials, NCDOT unveiled a revised routing in April 1996 that located the route one mile (1.6 km) north of the initial proposal. This revised "central route" was selected as the final routing by NCDOT in April 1997. At the time of its announcement, the route was estimated to cost $ 126.5 million (equivalent to $ 227 million in 2023) to complete and result in the displacement of 20 homes, eight businesses, the loss of 118 acres (48 ha) of wetlands, and the loss of 290 acres (120 ha) of farmland. Planning would continue through the late 1990s, culminating with the first contract awarded for its construction in November 2000 for the I-40 interchange.
889: 787: 852: 567: 35: 30: 1389: 1354: 1321: 1034: 974: 2641: 987: 1327: 1236: 1182: 381: 366: 159: 1395: 1360: 1083: 1078: 1040: 993: 980: 221: 141: 136: 114: 1272: 205: 181: 2905: 770:
tree. Construction of the eastern segment commenced on December 29, 2003. As late as May 2005, NCDOT remained undecided as to whether or not to open only a portion of the road prior to completion of the elevated section due to the bridge section running behind schedule. The first segment of
827:
filed a discrimination complaint against NCDOT, claiming the town was frequently denied funding for infrastructure improvements and other projects. Planning for future construction continued, and, in March 2010, NCDOT awarded an $ 81.7-million (equivalent to $ 111 million in 2023) contract
794:
In June 2006, NCDOT announced two additional segments of the I-140 project would open by the end of the month. Costing $ 187 million (equivalent to $ 272 million in 2023) to complete, the US 17 expressway segment between Market Street and I-40 and the segment between NC 133
915:
project is proposed to have its western terminus at I-140 in Brunswick County. The proposed freeway would extend east, crossing the Cape Fear River along a newly constructed bridge. The project is currently funded for right-of-way acquisition in the 2019–2029 State Transportation Improvement Plan.
863:
On December 15, 2017, a ribbon-cutting ceremony was held for the final section of the freeway between US 74/US 76 and US 421, officially completing I-140 around Wilmington. However, this segment of road did not officially open to traffic until December 19, 2017, due to the
847:
and other animals to safely cross the corridor in the vicinity of the Battle Royal Natural Heritage Site. The crossings included the extension of four bridges to provide some upland areas from animal crossings along water bodies and the construction of a 12-by-6-foot (3.7 by 1.8 m) wildlife
859:
With the opening of the Brunswick segment, NC 140 was routed along the entirety of the new freeway. On January 14, 2015, the Certification of Rulemaking was released, confirming the establishment of the new designation along not only the Brunswick segment but all existing and future
754:
The initial $ 36.7-million (equivalent to $ 58.3 million in 2023) contract for construction of a 6.5-mile (10.5 km) segment of the eastern leg was awarded by NCDOT to Barnhill Contracting Company in November 2003. Its construction had been delayed due to several conflicts. This
702:
In November 1994, the North Carolina Board of Transportation elected to move forward with the southern routing. The initial 5.8-mile (9.3 km) link between I-40 and US 421 was originally to begin construction in 1998 and open by 2001. Due to significant opposition by both local
737:
In an effort to protect scenic viewsheds for motorists utilizing the freeway, the Special Highway Overlay District of the New Hanover County Zoning Ordinance was adopted by the County Commission in June 2001. Some of the restrictions of the overlay include banning the construction of
621:
At the I-40 interchange, the route number changes to NC 140 as the freeway continues to the east. Between I-40 and US 17, the highway runs slightly to the southeast primarily through a wooded area. An interchange is currently under construction with the proposed
795:
and US 421 both opened to traffic on June 30, 2006. Concurrent with its opening, the routing of US 17 through Wilmington was also moved to the newly opened expressway; the previous routing of US 17 through Wilmington was changed to
868:, with 300,000 short tons (270,000 long tons) of stone and 5,000,000 cubic yards (3,800,000 m) of fill material. I-140 was officially extended west to replace NC 140 between US 17 and US 74/US 76 on August 7, 2018. 722:. At the time of its announcement, the designation was touted as a significant means to enhance economic development opportunities along its route in addition to potentially serving as a tie-in for moving the proposed eastern terminus of 783:(Castle Hayne Road). In November 2005, the North Carolina Board of Transportation voted unanimously to name the I-140 bridge across the Northeast Cape Fear River in honor of former Wilmington mayor and businessman Dan Cameron. 543:. Immediately to the north of the interchange, I-140 enters a residential area, with neighborhoods located on both sides of the highway. The highway also makes a turn to the southeast and east, bypassing both Leland and 876:
In 2002, the North Carolina Board of Transportation appropriated $ 10 million for the construction of an interchange at Blue Clay Road. The interchange would serve in providing better access to both
2302: 803:(US 17 Truck) designation was removed from Military Cutoff Road and Oleander Drive upon the opening of the bypass, with through trucks being directed to utilize the newly constructed freeway. 819:
first. However, in 2009, NCDOT announced plans to complete the segment between US 17 in Winnabow and US 74/US 76 before the central segment, which would require a bridge across the
864:
road requiring final construction and cleanup. The section costed $ 204 million (equivalent to $ 249 million in 2023) and included two 1.4-mile-long (2.3 km) bridges over the
710:
announced that it would grant NCDOT's request and designate the Northern Outer Loop as Interstate 140. The designation was to apply to the initial western segment constructed between
586:. The bridge measures 1.43 miles (2.30 km) in length with a main span of 479 feet (146 m) and 82 feet (25 m) of vertical clearance above the river, Rat Island, and adjacent 828:
to Barnhill Contracting Company. The project involved the construction of the 6.118-mile (9.846 km) segment between the US 74/US 76 intersection and US 17 south of
668: 900:
as part of the extension of Military Cutoff Road and Hampstead Bypass. Once completed, US 17 Byp. and I-140/NC 140 will form a bypass of US 17 from Winnabow to
2950: 904:. Construction on the Military Cutoff Road extension began in 2017, and opened to traffic on September 28, 2023. Work is expected to begin on the Hampstead Bypass north of 1475: 2945: 908:
in late 2020, with construction of the segment between NC 140 and NC 210 beginning in 2023. Roadwork of the entire bypass is expected to be completed in 2030.
1561: 2508: 848:
tunnel just north of the US 74/US 76 interchange. The section between US 17 and US 74/US 76 was opened to traffic in September 2014.
313: 1528: 730:
to Wilmington. Later that month, it was announced the segment east of I-40, would be named the John J. Burney Freeway after the state senator and trustee of the
2630: 2309: 796: 746:
requirements for structures adjacent to the roadway. Only nine applications for billboards along I-140 were processed and approved prior to its passage.
1740:
Hervey, Philip (November 5, 1994). "Board of transportation; 5.8-mile link between I-40 AND U.S. 421; State favors shorter of 2 routes for Outer Loop".
800: 916:
However, no construction funding is currently allocated to the project. Once funding is received, it would take approximately five years to complete.
487:(NCDOT) in 1972. However, the first contract for construction was not awarded until 2000. In August 2005, the first segment of I-140 between I-40 and 602:
while turning to the southeast. Crossing Blue Clay Road, I-140 makes another turn to the northeast but turns back to the east before crossing under
2645: 2085: 578:(exit 14) at another partial cloverleaf interchange. Continuing past US 421, I-140 continues in a northeasterly direction, crossing the 2481: 2940: 833: 1886:
Talton, Trista (November 5, 2002). "I-140 corridor will have more scenic views – Highway overlay zone means green space is a legal priority".
1632: 334: 547:
to the north. Two additional interchanges at Mount Misery Road (exit 8) and Cedar Hill Road (exit 10) are located along I-140 in
1998: 855:
A former directional sign along I-40 showing I-140 and US 17 running concurrently to the west; this designation was removed in 2017.
680: 484: 73: 1297: 731: 651:
During the 1990s, North Carolina originally proposed the I-140 designation for 32.36 miles (52.08 km) along the recently upgraded
2227: 2534: 417: 344: 339: 706:
In 1997, local officials initially stated that an Interstate designation was sought for the bypass. In September 2002, the
2935: 2617: 1902: 618:(exit 20). The ramp between I-140 East and I-40 West uses a flyover design instead of the traditional cloverleaf design. 2762: 2734: 2612: 1682:
McGrath, Gareth (May 4, 2005). "Going up – Six months past due, the U.S. 17 Wilmington bypass bridge is still up in the air".
2708: 1702:
Hervey, Philip (April 24, 1997). "Northern Outer Loop; Central bypass route is chosen; 20 homes in path of U.S. 17 project".
413: 303: 2800: 2748: 2175: 574:
Entering New Hanover County, I-140 crosses through an industrial area and begins a turn to the northeast. I-140 meets with
349: 308: 2776: 2657: 2028: 1296:
Eastern end of I-140 and western end of NC 140; signed as exits 20A (west) and 20B (east) from westbound NC 140; to
528: 2699: 1535: 1291: 1163: 556: 318: 271: 897: 623: 2560: 2360: 1722:
Myers, Richard (June 11, 1994). "Northern Outer Loop; Environmental impact weighed for routes of planned roadway".
1185: 954: 878: 715: 575: 548: 520: 492: 267: 162: 2887: 2882: 2877: 2872: 2861: 1964:
McGrath, Gareth (December 31, 2003). "Outer loop work starts eastward - Delays end for part of U.S. 17 project".
1799: 1399: 1364: 1275: 1090: 1044: 997: 816: 812: 723: 719: 711: 615: 536: 532: 473: 453: 449: 437: 224: 208: 184: 148: 117: 65: 1587: 476:(I-40), and the route number changes to NC 140. NC 140 continues to the east, ending at US 17 in 2892: 1407: 1193: 707: 652: 540: 326: 2403: 2334: 2308:(Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived from 2249: 1638:(Report). Washington, DC: American Association of State Highway and Transportation Officials. Archived from 1502: 832:. Construction of the segment began in March 2010 as a result of receiving partial funding through the 2629: 2458: 1411: 1256: 1243: 1009: 888: 727: 694: 627: 188: 1337:
Opened on September 28, 2023; Future US 17 Bypass planned to extend north as Hampstead Bypass in 2025
527:
to the east. The highway adjusts and turns to the north, running to the west of a railroad track owned by
2756: 2728: 1220: 882: 599: 469: 298: 166: 519:. The I-140 bridge crossing over US 17 at the interchange is named after Wilber E. Rabon, a former 2853: 2843: 2838: 2827: 2585: 2275: 2201: 2143: 2116: 2093: 1368: 1331: 1287: 1239: 1098: 1048: 560: 488: 433: 384: 369: 811:
Originally, the freeway was scheduled to be extended west from its current terminus at US 421 to
786: 2819: 2814: 2808: 2795: 2790: 2784: 1202: 1005: 1001: 901: 688: 579: 465: 290: 2303:"Special Committee on U.S. Route Numbering Spring 2015 Report to the Standing Committee on Highways" 2058: 2742: 1982:
McGrath, Gareth (August 23, 2005). "First leg of I-140 is opened - road should ease area traffic".
1403: 1304: 635: 512: 477: 441: 228: 121: 1639: 638:. US 17 merges onto the road and continues as a multilane arterial highway to the northeast. 1283: 1189: 1138: 1123: 824: 664: 656: 631: 630:. The eastern terminus of NC 140 is located at a trumpet interchange with US 17 in the 544: 461: 2429: 2955: 2770: 2692: 2509:"With opening of Military Cutoff Road extension, traffic relief coming to northern New Hanover" 1663: 1633:"Report of the Special Committee on U.S. Route Numbering to the Standing Committee on Highways" 1279: 1247: 1094: 1062: 1052: 829: 611: 516: 445: 152: 2002: 1755:
Hervey, Philip (April 17, 1996). "Route moved; New plan for bypass brings little but groans".
892:
Construction of the US 17 Byp. (temporarily signed as NC 417)/NC 140 interchange in April 2023
851: 1816:
McGrath, Gareth (November 3, 2000). "1st U.S. 17 Wilmington bypass contract award is today".
1609: 660: 566: 8: 2833: 2672: 844: 508: 504: 2388: 1949:
McGrath, Gareth (March 31, 2001). "Circling history; New highway to bypass aged tree".
1213: 763: 743: 684: 583: 1851:
McGrath, Gareth (September 19, 2002). "Outer Loop named Wilmington's 2nd interstate".
679:
The idea of constructing a northern bypass for Wilmington was initially identified by
2685: 2662: 2621: 840: 2677: 1664:
State Road Maintenance Unit – Mapping & Information Section (December 9, 2009).
2667: 912: 591: 771:
I-140 opened to traffic on August 22, 2005. Formally dedicated with Governor
1147: 865: 820: 552: 457: 2651: 1780: 590:. Northeast of the bridge, I-140 begins a turn to the east, running alongside a 2848: 1934:
McGrath, Gareth (November 6, 2003). "Awarding of contract moves loop forward".
1785: 779:
in attendance, the 3.2-mile (5.1 km) segment was located between I-40 and
759: 425: 257: 2929: 2714: 2276:"Committee endorses proposal to reroute U.S. 17 onto Wilmington city streets" 1086: 776: 247: 144: 698:
The I-40 interchange (pictured) was the first segment to begin construction.
1534:. North Carolina Department of Transportation. p. 1113. Archived from 1526: 1431: 790:
The former western terminus of I-140 at US 421 northwest of Wilmington
1562:"The Department of Defense wants a say in future development around MOTSU" 2300: 1630: 1480: 772: 2202:"DOT to spend millions on 'critter crossings' for bears, other wildlife" 885:. There is currently no timeline for the completion of the interchange. 683:
as a need in 1972. The outer loop was viewed as a means to help relieve
1831:
Fennell, Bettie (May 15, 1997). "Interstate status sought for bypass".
839:
As part of the expansion into Brunswick County, NCDOT designed several
756: 421: 2144:"Navassa alleges DOT racial discrimination in U.S. 17 bypass schedule" 1900: 1668:(Map). North Carolina Department of Transportation. Sheet 3 of 6. 671:(AASHTO) ultimately disapproved of the routing in their 1999 meeting. 766:
at the Market Street interchange in Kirkland to avoid a 450-year-old
739: 2228:"After weather delays, next piece of Wilmington Bypass to open soon" 1866:
McGrath, Gareth (September 23, 2002). "Burney name goes on bypass".
2086:"U.S. 17 bypass's Brunswick leg to be started earlier than planned" 491:(NC 133) opened. This was followed by a westward extension to 2482:"Construction begins on complicated Military Cutoff link to I-140" 669:
American Association of State Highway and Transportation Officials
595: 523:
Commissioner. I-140 begins running to the northwest, paralleling
1527:
North Carolina Department of Transportation (February 6, 2014).
1508:. North Carolina Department of Transportation. December 15, 2008 896:
An interchange is currently being constructed with the proposed
483:
The need for a bypass north of Wilmington was identified by the
2640: 2535:"Hampstead Bypass now fully funded, construction to begin soon" 2459:"U.S. 17 Hampstead Bypass & Military Cutoff Road Extension" 2255:. North Carolina Department of Transportation. January 14, 2015 905: 780: 607: 603: 598:
facility. I-140 meets with NC 133 (exit 17) north of
2117:"Navassa officials feeling bypassed by road-building schedule" 1269: 2409:. North Carolina Department of Transportation. August 7, 2018 1666:
Enlarged Municipal & Suburban Areas of New Hanover County
718:
and the initial eastern segment constructed between I-40 and
587: 524: 1631:
Special Committee on U.S. Route Numbering (April 17, 1999).
1421:
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
2340:. North Carolina Department of Transportation. May 17, 2017 53:
I-140 highlighted in red, NC 140 highlighted in purple
2301:
Special Committee on U.S. Route Numbering (May 14, 2015).
2392:. Raleigh, North Carolina. December 21, 2017. p. 3A. 767: 34: 448:
before turning to the east north of an interchange with
29: 2473: 2707: 2631:
Template:Attached KML/Interstate 140 (North Carolina)
2561:"NC DOT officially breaks ground on Hampstead Bypass" 2001:. Wilmington, North Carolina: WECT-TV. Archived from 1901:
New Hanover County Planning Department (March 2009).
1846: 1844: 1842: 646: 2951:
Transportation in New Hanover County, North Carolina
2658:
North Carolina @ SouthEastRoads.com - Interstate 140
2195: 2193: 1929: 1927: 1881: 1879: 1877: 1735: 1733: 610:. I-140 reaches its eastern terminus at a modified 2946:Transportation in Brunswick County, North Carolina 2526: 2421: 2108: 1977: 1975: 1859: 1839: 1778: 1774: 1772: 1770: 1768: 1766: 1553: 1295: 1266: 823:. In response to this decision, town leaders from 570:I-140 approaching NC 133 north of Wrightsboro 2352: 2190: 2169: 2167: 2165: 1957: 1697: 1695: 1693: 1476:"Overview map of Interstate 140 (North Carolina)" 2927: 2135: 2052: 2050: 2022: 2020: 1990: 1924: 1903:"Section 59.6: Special Highway Overlay District" 1874: 1809: 1730: 1717: 1715: 1713: 2663:I-140 Wilmington Bypass @ NC Future Interstates 2267: 1972: 1779:Johnston, Louis; Williamson, Samuel H. (2023). 1763: 1588:"I-140 bridge named after former Navassa mayor" 2162: 1942: 1748: 1690: 503:The western terminus of I-140 is located at a 2693: 2588:. North Carolina Department of Transportation 2461:. North Carolina Department of Transportation 2176:"Road work keeps construction workers on job" 2077: 2047: 2017: 1710: 1677: 1675: 806: 762:into Futch Creek and a slight redesign of an 674: 40:Interstate 140 and North Carolina Highway 140 2500: 2092:. Wilmington, North Carolina. Archived from 1996: 1824: 436:. The western terminus of the highway is at 749: 742:, limiting outdoor storage, and increasing 555:along the L. Bobby Brown Bridge and enters 485:North Carolina Department of Transportation 2700: 2686: 1672: 1585: 1503:"Vovici EFM Report: RN-08-03 (2008-12-15)" 732:University of North Carolina at Wilmington 2634: 2029:"Two sections of Outer Loop opening soon" 1986:. Wilmington, North Carolina. p. 1B. 1968:. Wilmington, North Carolina. p. 1A. 1953:. Wilmington, North Carolina. p. 1A. 1938:. Wilmington, North Carolina. p. 1B. 1890:. Wilmington, North Carolina. p. 2B. 1870:. Wilmington, North Carolina. p. 1B. 1855:. Wilmington, North Carolina. p. 1A. 1835:. Wilmington, North Carolina. p. 2B. 1820:. Wilmington, North Carolina. p. 1B. 1759:. Wilmington, North Carolina. p. 2B. 1744:. Wilmington, North Carolina. p. 5B. 1726:. Wilmington, North Carolina. p. 2B. 1706:. Wilmington, North Carolina. p. 1A. 1686:. Wilmington, North Carolina. p. 1B. 1612:. Miami, FL: GLF Construction Corporation 2532: 2358: 2065:. Wilmington, North Carolina. p. 1A 2035:. Wilmington, North Carolina. p. 1A 1657: 1470: 1468: 1466: 1464: 1462: 887: 883:Cape Fear Community College North Campus 850: 785: 693: 565: 2506: 2479: 2427: 2361:"Breaking: Last stretch of I-140 opens" 2273: 2199: 2056: 2026: 1981: 1963: 1948: 1933: 1865: 1850: 1830: 1815: 1681: 2928: 2428:McGrath, Gareth (September 22, 2002). 2173: 2141: 2115:Gannon, Patrick (September 16, 2009). 2114: 2083: 1885: 1754: 1739: 1701: 834:American Recovery and Reinvestment Act 2941:Interstate Highways in North Carolina 2681: 2558: 2507:Pociask, Megan (September 28, 2023). 2453: 2451: 2200:McGrath, Gareth (November 29, 2009). 1721: 1590:. Wilmington, North Carolina: WECT-TV 1459: 1385: 1376: 1350: 1341: 1317: 1308: 1260: 1233: 1224: 1212: 1206: 1179: 1170: 1157: 1151: 1146: 1136: 1127: 1115: 1106: 1075: 1066: 1030: 1021: 970: 961: 2533:Darrough, Mark (September 6, 2018). 1912:. New Hanover County. pp. 72–73 626:(Military Cutoff Road) northeast of 498: 2359:Buckland, Tim (December 19, 2017). 2274:McGrath, Gareth (August 27, 2014). 1910:New Hanover County Zoning Ordinance 529:Military Ocean Terminal Sunny Point 13: 2480:McGrath, Gareth (August 7, 2018). 2448: 1894: 1602: 938: 647:First proposal: Raleigh to Sanford 14: 2967: 2603: 2559:McGee, Kendall (March 11, 2022). 2430:"Budget includes highway project" 2084:Gannon, Patrick (July 15, 2009). 2057:McGrath, Gareth (June 29, 2006). 2027:McGrath, Gareth (June 20, 2006). 1997:Staff Report (November 3, 2005). 1559: 1529:"Board of Transportation Meeting" 2903: 2639: 2142:Little, Ken (October 15, 2009). 1999:"Bridge Named After Dan Cameron" 1393: 1387: 1358: 1352: 1325: 1319: 1270: 1234: 1180: 1081: 1076: 1038: 1032: 991: 985: 978: 972: 879:Wilmington International Airport 456:(US 76). I-140 crosses the 412:) is a 25.4-mile (40.9 km) 379: 364: 219: 203: 179: 157: 139: 134: 112: 83:25.4 mi (40.9 km) 33: 28: 2646:Interstate 140 (North Carolina) 2578: 2552: 2396: 2379: 2327: 2294: 2242: 2220: 1800:Gross Domestic Product deflator 406:North Carolina Highway 140 2174:Little, Ken (March 15, 2010). 1624: 1586:WECT Staff (October 9, 2019). 1579: 1520: 1495: 1416:Road continues onto US 17 708:Federal Highway Administration 541:partial cloverleaf interchange 1: 2936:Auxiliary Interstate Highways 2652:Interstate 140 North Carolina 1781:"What Was the U.S. GDP Then?" 1453: 933: 797:U.S. Highway 17 Business 551:. The Interstate crosses the 507:with US 17 north of the 327:North Carolina Highway System 2488:. Wilmington, North Carolina 2436:. Wilmington, North Carolina 2404:"Route Changes (2018-08-07)" 2367:. Wilmington, North Carolina 2335:"Route Changes (2017-05-17)" 2282:. Wilmington, North Carolina 2250:"Route Changes (2015-01-14)" 2208:. Wilmington, North Carolina 2150:. Wilmington, North Carolina 2123:. Wilmington, North Carolina 1334:south (Military Cutoff Road) 919: 687:along Market Street and the 444:. It heads north in western 428:. Officially designated the 414:auxiliary Interstate Highway 7: 799:(US 17 Bus.), and the 432:, it serves as a bypass of 430:John Jay Burney Jr. Freeway 47:John Jay Burney Jr. Freeway 10: 2972: 1014:Continuation as US 17 807:Brunswick County extension 801:U.S. Highway 17 Truck 675:Wilmington northern bypass 641: 489:North Carolina Highway 133 195:North Carolina Highway 140 2912: 2901: 2723: 1610:"US-17 Wilmington Bypass" 1420: 1415: 1382: 1379: 1372: 1347: 1344: 1336: 1314: 1311: 1303: 1263: 1255: 1251: 1230: 1227: 1219: 1209: 1201: 1197: 1176: 1173: 1167: 1162: 1154: 1142: 1133: 1130: 1122: 1118: 1112: 1109: 1102: 1072: 1069: 1061: 1056: 1027: 1024: 1018: 1013: 967: 964: 958: 953: 948: 945: 942: 937: 932: 929: 926: 871: 755:included the handling of 689:Cape Fear Memorial Bridge 580:Northeast Cape Fear River 466:Northeast Cape Fear River 357: 291:Interstate Highway System 286: 281: 277: 263: 253: 243: 238: 234: 215: 199: 194: 175: 127: 108: 103: 87: 79: 71: 63: 58: 51: 46: 25: 18:Highway in North Carolina 1439:     1427:     750:Construction and opening 1137:Cedar Hill Road β€“ 632:census-designated place 2654:@ Interstate-Guide.com 2059:"Relief for commuters" 893: 856: 791: 775:and US Representative 699: 612:cloverleaf interchange 571: 1158:L. Bobby Brown Bridge 891: 854: 789: 697: 569: 2648:at Wikimedia Commons 2635:KML is from Wikidata 2586:"Cape Fear Crossing" 2513:Wilmington Star-News 655:freeway between the 559:to the northwest of 531:. The highway meets 2389:News & Observer 2005:on February 4, 2012 1802:figures follow the 1645:on October 16, 2017 539:(exit 5) at a 505:trumpet interchange 493:U.S. Route 421 398:Interstate 140 128:Major intersections 64:Auxiliary route of 2673:NCRoads.com: I-140 2178:. Star News Online 2096:on January 2, 2018 1292:Wrightsville Beach 1214:Dan Cameron Bridge 1203:NE Cape Fear River 913:Cape Fear Crossing 894: 857: 841:wildlife crossings 792: 700: 685:traffic congestion 584:Dan Cameron Bridge 572: 557:New Hanover County 454:U.S. Route 76 450:U.S. Route 74 440:(US 17) near 438:U.S. Route 17 2923: 2922: 2644:Media related to 1451: 1450: 1116:Mount Misery Road 515:and southwest of 499:Route description 395: 394: 391: 390: 211:near Murraysville 59:Route information 2963: 2907: 2906: 2717: 2711: 2710:Auxiliary routes 2702: 2695: 2688: 2679: 2678: 2643: 2625: 2598: 2597: 2595: 2593: 2582: 2576: 2575: 2573: 2571: 2556: 2550: 2549: 2547: 2545: 2530: 2524: 2523: 2521: 2519: 2504: 2498: 2497: 2495: 2493: 2477: 2471: 2470: 2468: 2466: 2455: 2446: 2445: 2443: 2441: 2425: 2419: 2418: 2416: 2414: 2408: 2400: 2394: 2393: 2383: 2377: 2376: 2374: 2372: 2356: 2350: 2349: 2347: 2345: 2339: 2331: 2325: 2324: 2322: 2320: 2314: 2307: 2298: 2292: 2291: 2289: 2287: 2271: 2265: 2264: 2262: 2260: 2254: 2246: 2240: 2239: 2237: 2235: 2224: 2218: 2217: 2215: 2213: 2197: 2188: 2187: 2185: 2183: 2171: 2160: 2159: 2157: 2155: 2139: 2133: 2132: 2130: 2128: 2112: 2106: 2105: 2103: 2101: 2081: 2075: 2074: 2072: 2070: 2054: 2045: 2044: 2042: 2040: 2024: 2015: 2014: 2012: 2010: 1994: 1988: 1987: 1979: 1970: 1969: 1961: 1955: 1954: 1946: 1940: 1939: 1931: 1922: 1921: 1919: 1917: 1907: 1898: 1892: 1891: 1883: 1872: 1871: 1863: 1857: 1856: 1848: 1837: 1836: 1828: 1822: 1821: 1813: 1807: 1797: 1795: 1793: 1776: 1761: 1760: 1752: 1746: 1745: 1737: 1728: 1727: 1719: 1708: 1707: 1699: 1688: 1687: 1679: 1670: 1669: 1661: 1655: 1654: 1652: 1650: 1644: 1637: 1628: 1622: 1621: 1619: 1617: 1606: 1600: 1599: 1597: 1595: 1583: 1577: 1576: 1574: 1572: 1560:Still, Johanna. 1557: 1551: 1550: 1548: 1546: 1540: 1533: 1524: 1518: 1517: 1515: 1513: 1507: 1499: 1493: 1492: 1490: 1488: 1472: 1444: 1440: 1435: 1428: 1398: 1397: 1396: 1391: 1390: 1363: 1362: 1361: 1356: 1355: 1330: 1329: 1328: 1323: 1322: 1274: 1273: 1238: 1237: 1184: 1183: 1085: 1084: 1080: 1079: 1043: 1042: 1041: 1036: 1035: 996: 995: 994: 989: 988: 983: 982: 981: 976: 975: 940: 935: 924: 923: 898:Hampstead Bypass 592:General Electric 549:Brunswick County 521:Brunswick County 472:. I-140 ends at 387: 383: 382: 372: 368: 367: 359: 358: 223: 222: 207: 206: 183: 182: 161: 160: 143: 142: 138: 137: 116: 115: 98: 96: 37: 32: 23: 22: 2971: 2970: 2966: 2965: 2964: 2962: 2961: 2960: 2926: 2925: 2924: 2919: 2908: 2904: 2899: 2719: 2715: 2709: 2706: 2668:I-140 Exit List 2636: 2633: 2628: 2627: 2626: 2610: 2606: 2601: 2591: 2589: 2584: 2583: 2579: 2569: 2567: 2557: 2553: 2543: 2541: 2539:Port City Daily 2531: 2527: 2517: 2515: 2505: 2501: 2491: 2489: 2478: 2474: 2464: 2462: 2457: 2456: 2449: 2439: 2437: 2426: 2422: 2412: 2410: 2406: 2402: 2401: 2397: 2385: 2384: 2380: 2370: 2368: 2357: 2353: 2343: 2341: 2337: 2333: 2332: 2328: 2318: 2316: 2315:on June 3, 2019 2312: 2305: 2299: 2295: 2285: 2283: 2272: 2268: 2258: 2256: 2252: 2248: 2247: 2243: 2233: 2231: 2226: 2225: 2221: 2211: 2209: 2198: 2191: 2181: 2179: 2172: 2163: 2153: 2151: 2140: 2136: 2126: 2124: 2113: 2109: 2099: 2097: 2082: 2078: 2068: 2066: 2055: 2048: 2038: 2036: 2025: 2018: 2008: 2006: 1995: 1991: 1980: 1973: 1962: 1958: 1947: 1943: 1932: 1925: 1915: 1913: 1905: 1899: 1895: 1884: 1875: 1864: 1860: 1849: 1840: 1829: 1825: 1814: 1810: 1791: 1789: 1777: 1764: 1753: 1749: 1738: 1731: 1720: 1711: 1700: 1691: 1680: 1673: 1662: 1658: 1648: 1646: 1642: 1635: 1629: 1625: 1615: 1613: 1608: 1607: 1603: 1593: 1591: 1584: 1580: 1570: 1568: 1566:Port City Daily 1558: 1554: 1544: 1542: 1541:on June 3, 2014 1538: 1531: 1525: 1521: 1511: 1509: 1505: 1501: 1500: 1496: 1486: 1484: 1474: 1473: 1460: 1456: 1447: 1442: 1438: 1430: 1426: 1422: 1394: 1392: 1388: 1386: 1359: 1357: 1353: 1351: 1326: 1324: 1320: 1318: 1271: 1235: 1181: 1148:Cape Fear River 1082: 1077: 1039: 1037: 1033: 1031: 992: 990: 986: 984: 979: 977: 973: 971: 922: 874: 866:Cape Fear River 821:Cape Fear River 809: 752: 677: 649: 644: 624:US 17 Byp. 553:Cape Fear River 501: 458:Cape Fear River 380: 378: 365: 363: 220: 204: 180: 171: 158: 140: 135: 113: 95:August 22, 2005 94: 92: 91:August 22, 2005 54: 42: 41: 38: 19: 12: 11: 5: 2969: 2959: 2958: 2953: 2948: 2943: 2938: 2921: 2920: 2918: 2917: 2913: 2910: 2909: 2902: 2900: 2898: 2897: 2896: 2895: 2890: 2885: 2880: 2875: 2870: 2862:North Carolina 2858: 2857: 2856: 2851: 2846: 2841: 2836: 2824: 2823: 2822: 2817: 2805: 2804: 2803: 2798: 2793: 2781: 2780: 2779: 2767: 2766: 2765: 2753: 2752: 2751: 2739: 2738: 2737: 2724: 2721: 2720: 2705: 2704: 2697: 2690: 2682: 2676: 2675: 2670: 2665: 2660: 2655: 2649: 2609: 2608: 2607: 2605: 2604:External links 2602: 2600: 2599: 2577: 2551: 2525: 2499: 2472: 2447: 2420: 2395: 2378: 2351: 2326: 2293: 2266: 2241: 2219: 2189: 2161: 2134: 2107: 2076: 2046: 2016: 1989: 1971: 1956: 1941: 1923: 1893: 1873: 1858: 1838: 1823: 1808: 1804:MeasuringWorth 1798:United States 1786:MeasuringWorth 1762: 1747: 1729: 1709: 1689: 1671: 1656: 1623: 1601: 1578: 1552: 1519: 1494: 1457: 1455: 1452: 1449: 1448: 1446: 1445: 1436: 1423: 1418: 1417: 1414: 1408:Topsail Island 1384: 1381: 1378: 1374: 1373: 1371: 1349: 1346: 1343: 1339: 1338: 1335: 1316: 1313: 1310: 1307: 1301: 1300: 1298:UNC Wilmington 1294: 1268: 1265: 1262: 1259: 1253: 1252: 1250: 1232: 1229: 1226: 1223: 1217: 1216: 1211: 1208: 1205: 1199: 1198: 1196: 1194:Carolina Beach 1178: 1175: 1172: 1169: 1166: 1160: 1159: 1156: 1153: 1150: 1144: 1143: 1141: 1135: 1132: 1129: 1126: 1120: 1119: 1117: 1114: 1111: 1108: 1104: 1103: 1101: 1074: 1071: 1068: 1065: 1059: 1058: 1055: 1029: 1026: 1023: 1020: 1016: 1015: 1012: 969: 966: 963: 960: 957: 951: 950: 947: 944: 941: 936: 931: 928: 921: 918: 873: 870: 808: 805: 751: 748: 676: 673: 648: 645: 643: 640: 500: 497: 426:North Carolina 393: 392: 389: 388: 375: 373: 355: 354: 353: 352: 347: 342: 337: 331: 330: 322: 321: 316: 311: 306: 301: 295: 294: 284: 283: 282:Highway system 279: 278: 275: 274: 265: 261: 260: 258:North Carolina 255: 251: 250: 245: 241: 240: 236: 235: 232: 231: 217: 213: 212: 201: 197: 196: 192: 191: 177: 173: 172: 170: 169: 155: 131: 129: 125: 124: 110: 106: 105: 104:Interstate 140 101: 100: 89: 85: 84: 81: 77: 76: 72:Maintained by 69: 68: 61: 60: 56: 55: 52: 49: 48: 44: 43: 39: 27: 26: 17: 9: 6: 4: 3: 2: 2968: 2957: 2956:Interstate 40 2954: 2952: 2949: 2947: 2944: 2942: 2939: 2937: 2934: 2933: 2931: 2915: 2914: 2911: 2894: 2891: 2889: 2886: 2884: 2881: 2879: 2876: 2874: 2871: 2869: 2866: 2865: 2864: 2863: 2859: 2855: 2852: 2850: 2847: 2845: 2842: 2840: 2837: 2835: 2832: 2831: 2830: 2829: 2825: 2821: 2818: 2816: 2813: 2812: 2811: 2810: 2806: 2802: 2799: 2797: 2794: 2792: 2789: 2788: 2787: 2786: 2782: 2778: 2775: 2774: 2773: 2772: 2768: 2764: 2761: 2760: 2759: 2758: 2754: 2750: 2747: 2746: 2745: 2744: 2740: 2736: 2733: 2732: 2731: 2730: 2726: 2725: 2722: 2718: 2716:Interstate 40 2712: 2703: 2698: 2696: 2691: 2689: 2684: 2683: 2680: 2674: 2671: 2669: 2666: 2664: 2661: 2659: 2656: 2653: 2650: 2647: 2642: 2638: 2637: 2632: 2623: 2619: 2615: 2614: 2587: 2581: 2570:September 28, 2566: 2562: 2555: 2540: 2536: 2529: 2518:September 28, 2514: 2510: 2503: 2487: 2483: 2476: 2460: 2454: 2452: 2435: 2431: 2424: 2405: 2399: 2391: 2390: 2382: 2366: 2362: 2355: 2336: 2330: 2311: 2304: 2297: 2281: 2277: 2270: 2251: 2245: 2230:. wwaytv3.com 2229: 2223: 2207: 2203: 2196: 2194: 2177: 2170: 2168: 2166: 2149: 2145: 2138: 2122: 2118: 2111: 2095: 2091: 2087: 2080: 2064: 2060: 2053: 2051: 2034: 2030: 2023: 2021: 2004: 2000: 1993: 1985: 1978: 1976: 1967: 1960: 1952: 1945: 1937: 1930: 1928: 1911: 1904: 1897: 1889: 1882: 1880: 1878: 1869: 1862: 1854: 1847: 1845: 1843: 1834: 1827: 1819: 1812: 1805: 1801: 1788: 1787: 1782: 1775: 1773: 1771: 1769: 1767: 1758: 1751: 1743: 1736: 1734: 1725: 1718: 1716: 1714: 1705: 1698: 1696: 1694: 1685: 1678: 1676: 1667: 1660: 1641: 1634: 1627: 1611: 1605: 1589: 1582: 1567: 1563: 1556: 1537: 1530: 1523: 1504: 1498: 1487:September 13, 1483: 1482: 1477: 1471: 1469: 1467: 1465: 1463: 1458: 1437: 1433: 1425: 1424: 1419: 1413: 1409: 1405: 1402:north β€“ 1401: 1375: 1370: 1367:south β€“ 1366: 1340: 1333: 1306: 1302: 1299: 1293: 1289: 1285: 1281: 1277: 1258: 1254: 1249: 1245: 1241: 1222: 1218: 1215: 1204: 1200: 1195: 1191: 1187: 1165: 1161: 1149: 1145: 1140: 1125: 1121: 1105: 1100: 1096: 1092: 1088: 1064: 1060: 1054: 1050: 1047:north β€“ 1046: 1017: 1011: 1007: 1003: 999: 956: 952: 925: 917: 914: 911:The proposed 909: 907: 903: 899: 890: 886: 884: 880: 869: 867: 861: 853: 849: 846: 843:to allow the 842: 837: 835: 831: 826: 822: 818: 814: 804: 802: 798: 788: 784: 782: 778: 777:Mike McIntyre 774: 769: 765: 761: 758: 747: 745: 741: 735: 733: 729: 725: 721: 717: 713: 709: 704: 696: 692: 690: 686: 682: 672: 670: 666: 662: 658: 654: 639: 637: 633: 629: 625: 619: 617: 613: 609: 605: 601: 597: 593: 589: 585: 581: 577: 568: 564: 562: 558: 554: 550: 546: 542: 538: 534: 530: 526: 522: 518: 514: 510: 506: 496: 494: 490: 486: 481: 479: 475: 474:Interstate 40 471: 468:northwest of 467: 463: 459: 455: 452:(US 74)/ 451: 447: 443: 439: 435: 431: 427: 423: 419: 418:state highway 415: 411: 407: 403: 399: 386: 376: 374: 371: 361: 360: 356: 351: 348: 346: 343: 341: 338: 336: 333: 332: 329: 328: 324: 323: 320: 317: 315: 312: 310: 307: 305: 302: 300: 297: 296: 293: 292: 288: 287: 285: 280: 276: 273: 269: 266: 262: 259: 256: 252: 249: 248:United States 246: 242: 237: 233: 230: 226: 218: 216:East end 214: 210: 202: 200:West end 198: 193: 190: 186: 178: 176:East end 174: 168: 164: 156: 154: 150: 146: 133: 132: 130: 126: 123: 119: 111: 109:West end 107: 102: 90: 86: 82: 78: 75: 70: 67: 62: 57: 50: 45: 36: 31: 24: 21: 16: 2867: 2860: 2826: 2807: 2783: 2769: 2755: 2741: 2727: 2611: 2590:. Retrieved 2580: 2568:. Retrieved 2565:www.wect.com 2564: 2554: 2544:December 13, 2542:. Retrieved 2538: 2528: 2516:. Retrieved 2512: 2502: 2492:December 13, 2490:. Retrieved 2485: 2475: 2463:. Retrieved 2438:. Retrieved 2433: 2423: 2411:. Retrieved 2398: 2387: 2381: 2371:December 19, 2369:. Retrieved 2364: 2354: 2342:. Retrieved 2329: 2317:. Retrieved 2310:the original 2296: 2284:. Retrieved 2279: 2269: 2259:February 17, 2257:. Retrieved 2244: 2234:December 12, 2232:. Retrieved 2222: 2210:. Retrieved 2205: 2180:. Retrieved 2152:. Retrieved 2147: 2137: 2125:. Retrieved 2120: 2110: 2098:. Retrieved 2094:the original 2089: 2079: 2067:. Retrieved 2062: 2037:. Retrieved 2032: 2007:. Retrieved 2003:the original 1992: 1983: 1965: 1959: 1950: 1944: 1935: 1914:. Retrieved 1909: 1896: 1887: 1867: 1861: 1852: 1832: 1826: 1817: 1811: 1803: 1792:November 30, 1790:. Retrieved 1784: 1756: 1750: 1741: 1723: 1703: 1683: 1665: 1659: 1647:. Retrieved 1640:the original 1626: 1614:. Retrieved 1604: 1592:. Retrieved 1581: 1569:. Retrieved 1565: 1555: 1543:. Retrieved 1536:the original 1522: 1510:. Retrieved 1497: 1485:. Retrieved 1479: 1441:   1429:   1412:Jacksonville 1257:Murraysville 1244:Castle Hayne 1010:Myrtle Beach 946:Destinations 910: 895: 875: 862: 858: 838: 810: 793: 753: 736: 728:Myrtle Beach 705: 701: 678: 650: 628:Murraysville 620: 573: 502: 482: 429: 409: 405: 401: 397: 396: 325: 289: 189:Murraysville 20: 15: 2592:November 6, 2465:November 6, 2413:November 6, 2386:"Briefly". 2286:November 6, 2212:November 6, 2182:November 6, 2154:November 6, 2127:November 6, 2100:November 6, 2069:November 6, 2039:November 6, 1594:November 6, 1571:November 6, 1545:October 16, 1481:Google Maps 1332:NC 417 1240:NC 133 1221:Wrightsboro 1186:US 421 1164:New Hanover 773:Mike Easley 716:US 421 600:Wrightsboro 576:US 421 470:Wrightsboro 410:NC 140 385:NC 141 370:NC 138 272:New Hanover 167:Wrightsboro 163:US 421 2930:Categories 2757:New Mexico 2729:California 1454:References 1434:transition 1400:US 17 1369:Wilmington 1365:US 17 1288:Wilmington 1099:Whiteville 1091:US 76 1087:US 74 1049:Wilmington 1045:US 17 1002:NC 87 998:US 17 845:black bear 817:US 76 813:US 74 757:stormwater 740:billboards 720:US 17 588:marshlands 561:Wilmington 537:US 76 533:US 74 434:Wilmington 422:U.S. state 335:Interstate 225:US 17 149:US 76 145:US 74 118:US 17 2828:Tennessee 2486:Star-News 2440:April 26, 2434:Star-News 2365:Star-News 2280:Star-News 2206:Star-News 2148:Star-News 2121:Star-News 2090:Star-News 2063:Star-News 2033:Star-News 2009:April 25, 1984:Star-News 1966:Star-News 1951:Star-News 1936:Star-News 1916:April 26, 1888:Star-News 1868:Star-News 1853:Star-News 1833:Star-News 1818:Star-News 1757:Star-News 1742:Star-News 1724:Star-News 1704:Star-News 1684:Star-News 1616:April 26, 1057:Left exit 1006:Shallotte 1000:south to 955:Brunswick 920:Exit list 902:Hampstead 663:line and 653:US 1 509:community 460:north of 304:Auxiliary 268:Brunswick 2893:Business 2809:Arkansas 2801:Business 2785:Oklahoma 2777:Business 2763:Business 2749:Business 2735:Business 2613:KML file 2344:June 24, 1806:series. 1649:July 13, 1443:Unopened 1404:New Bern 1305:Kirkland 1278: β€“ 1242: β€“ 1188: β€“ 1093: β€“ 1089: / 1004: β€“ 930:Location 881:and the 636:Kirkland 513:Winnabow 478:Kirkland 464:and the 442:Winnabow 314:Business 309:Suffixed 264:Counties 239:Location 229:Kirkland 147: / 122:Winnabow 99:–present 2743:Arizona 2319:June 2, 1512:July 4, 1478:(Map). 1284:Raleigh 1190:Clinton 1168:​ 1139:Navassa 1124:Navassa 1019:​ 959:​ 825:Navassa 764:offramp 744:setback 665:Sanford 657:Raleigh 642:History 596:Hitachi 582:on the 545:Navassa 462:Navassa 420:in the 244:Country 93: ( 88:Existed 2916:Former 1280:Benson 1248:Burgaw 1095:Leland 1063:Leland 1053:Leland 927:County 906:NC 210 872:Future 830:Leland 781:NC 133 760:runoff 667:. The 608:NC 132 604:US 117 517:Leland 446:Leland 404:) and 350:Scenic 319:Future 153:Leland 80:Length 2771:Texas 2407:(PDF) 2338:(PDF) 2313:(PDF) 2306:(PDF) 2253:(PDF) 1906:(PDF) 1643:(PDF) 1636:(PDF) 1539:(PDF) 1532:(PDF) 1506:(PDF) 1432:Route 949:Notes 726:from 681:NCDOT 614:with 525:NC 87 402:I-140 345:State 254:State 187:near 165:near 151:near 120:near 74:NCDOT 2622:help 2618:edit 2594:2020 2572:2023 2546:2018 2520:2023 2494:2018 2467:2020 2442:2010 2415:2020 2373:2017 2346:2017 2321:2015 2288:2020 2261:2015 2236:2014 2214:2020 2184:2020 2156:2020 2129:2020 2102:2020 2071:2020 2041:2020 2011:2010 1918:2010 1794:2023 1651:2013 1618:2010 1596:2020 1573:2020 1547:2014 1514:2013 1489:2020 1380:40.9 1377:25.4 1345:39.9 1342:24.8 1312:35.7 1309:22.2 1276:I-40 1264:31.7 1261:19.7 1228:27.4 1225:17.0 1210:22.9 1207:14.2 1174:21.1 1171:13.1 1155:17.7 1152:11.0 1131:15.9 1110:12.9 943:Exit 724:I-74 714:and 712:I-40 661:Cary 616:I-40 606:and 416:and 299:Main 209:I-40 185:I-40 66:I-40 2888:840 2883:540 2878:440 2873:240 2868:140 2854:840 2849:640 2844:440 2839:240 2834:140 2820:540 2815:440 2796:440 2791:240 2713:of 1128:9.9 1107:8.0 1070:9.0 1067:5.6 1025:1.4 1022:0.9 965:0.0 962:0.0 768:oak 634:of 563:. 511:of 480:. 424:of 227:in 2932:: 2620:β€’ 2563:. 2537:. 2511:. 2484:. 2450:^ 2432:. 2363:. 2278:. 2204:. 2192:^ 2164:^ 2146:. 2119:. 2088:. 2061:. 2049:^ 2031:. 2019:^ 1974:^ 1926:^ 1908:. 1876:^ 1841:^ 1783:. 1765:^ 1732:^ 1712:^ 1692:^ 1674:^ 1564:. 1461:^ 1410:, 1406:, 1348:25 1315:23 1290:, 1286:, 1282:, 1267:20 1246:, 1231:17 1192:, 1177:14 1134:10 1097:, 1051:, 1008:, 939:km 934:mi 836:. 734:. 377:β†’ 362:← 340:US 270:, 2701:e 2694:t 2687:v 2624:) 2616:( 2596:. 2574:. 2548:. 2522:. 2496:. 2469:. 2444:. 2417:. 2375:. 2348:. 2323:. 2290:. 2263:. 2238:. 2216:. 2186:. 2158:. 2131:. 2104:. 2073:. 2043:. 2013:. 1920:. 1796:. 1653:. 1620:. 1598:. 1575:. 1549:. 1516:. 1491:. 1383:β€” 1113:8 1073:5 1028:1 968:β€” 815:/ 659:– 594:/ 535:/ 408:( 400:( 97:)

Index

Interstate 140 and North Carolina Highway 140 marker
Interstate 140 and North Carolina Highway 140 marker
I-40
NCDOT
US 17
Winnabow
US 74
US 76
Leland
US 421
Wrightsboro
I-40
Murraysville
I-40
US 17
Kirkland
United States
North Carolina
Brunswick
New Hanover
Interstate Highway System
Main
Auxiliary
Suffixed
Business
Future
North Carolina Highway System
Interstate
US
State

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑