also another 27% (nearly 500 tmc) of water inflows for hydro power generation or irrigation from the reservoir. With this, the only option left for Telangana is to plan lift irrigation projects by using water from the reservoir as most of the cultivable lands in the state are located above the reservoir water level. The interstate agreement is concluded without fixing the FRL of the reservoir and liberty is accorded to Telangana state to decide the FRL keeping cost and benefits sharing percentage same. The agreed terms would be attractive to Telangana only in case the reservoir capacity is of the order of 1,000 tmc. The approximate land submergence is 2,000 km for 1,000 tmc capacity reservoir.
36: 64: 466:
wells drilling such as serpentine drilling / in seam drilling, guided drilling, bunching of wells, etc. has made in situ coal gasification technology a reliable and commercial proposition. With underground coal gasification technology, the coal deposits (if any), which got submerged under the reservoir water, can be exploited economically. Moreover, coal deposits are losing importance as this highly pollution causing energy source has become costly compared to abundant and pollution free
71: 43: 465:
technology is very well developed and in commercial use. This technology is used to exploit coal deposits located deep in the underground (600 meters depth & more), the abandoned underground coal mines and also coal deposits located in seabed. The latest technology adopted from oil & gas
439:
Inchampalli dam site is very favourable to construct dam economically with nearly 1,000 tmc storage capacity at FRL 125 m MSL. The river at this point covers nearly 80% of the total catchment’s area with adequate water inflows. This is one of very few sites for locating huge storage reservoir in
435:
for Inchampalli joint project, Andhra Pradesh (now Telangana) shall bear 78.1% cost of the dam, land & asset acquisition (including that of Maharashtra and Chhattisgarh governments) and rehabilitate the displaced population. But it can draw 2,265 million m³ (80 tmc) from the reservoir and
584:
state. Interstate disputes can be resolved at appropriate time during the advanced stage of dam construction. At this location, the dam construction cost (nearly Rs 3000 crores) up to FRL 125 m MSL is less than 10% of the total project cost which includes land acquisition & rehabilitation of
481:
It would be an economical and time saving proposition if this project is constructed by Telangana first up to 95 m MSL with its full capacity hydro electric station and its submergence area limited to river bed in Maharashtra and Chattishgarh states. Later the height of the dam can be gradually
589:
would also benefit from the relocated Inchampalli dam as it can directly pump water from the Inchampalli reservoir with reduced power consumption due to availability of water at 125 m MSL from the river. However its pump house needs to be relocated to the uplands side.
522:) hydro electric project across the Godavari river located downstream of Inchampalli dam can be constructed up to FRL 95 m MSL with provision to construct Inchampalli dam up to FRL 125 m MSL in future. The reservoir of Kanthalapalli dam would act as tail pond for the 452:(1,350 tmc) in China. Inchampalli reservoir with FRL 125 m MSL would incur very low cost per tmc water storage after meeting the land acquisition and rehabilitation costs at prevailing market rates. Creation of 1,000 tmc storage reservoir at Inchampalli on 460:
However, the erstwhile Andhra Pradesh government had tentatively proposed the FRL level 112.77 m MSL, fearing some coal deposits would be submerged above this level. The delay in taking up this project is boon in disguise to Telangana state. Presently
456:
would harness the mighty river water fully ushering India into next phase of green revolution. This reservoir project would also eliminate fully the frequent floods taking place in lower Godavari river basin area in Telangana and Andhra Pradesh.
398:
tentatively. This reservoir would submerge total 926 km of land in Telangana, Chhattisgarh and Maharashtra states. Most of the area to be submerged is forest land. This project is also envisaged with
346:) (Telugu: ఇచ్చంపల్లి) (Marathi: इच्चमपल्ली प्रकल्प) was a multi-purpose project proposed in 2008, with hydro electricity generation, irrigation, flood control, etc. benefits on the 535: 799: 629: 655: 485: 856: 390:) here whose remnants are still existing. However, this dream is not yet fulfilled. Inchampalli reservoir is proposed with 10,374 million m³ (367 573: 701: 791: 824: 482:
increased to its ultimate height at FRL 125 m MSL with the revenue generated from hydro power generation. Alternatively, Kanthanapally (
120: 758: 726: 580:
state which would enable to postpone the interstate disputes resolution and take up dam construction without physical hindrance from
576:
village which is also suitable to construct the dam up to FRL 125 m MSL. At this location, both sides of the river is located in
35: 909: 386:
made an unsuccessful attempt in the 1860s to build a river crossing weir (during lean flow period similar to one existing at
63: 387: 914: 599: 432: 904: 877: 586: 523: 400: 321: 585:
displaced people in the submergence area, irrigation canals, water pumping stations, hydro power station, etc.
609: 462: 919: 702:"Godavari Inchampalli Janampet Cauvery Grand Anicut Link Project :: National Water Development Agency" 316: 412: 831: 924: 765: 812: 733: 475: 8: 471: 375: 104: 328: 604: 526:
hydro units of Inchampalli dam in addition to storing substantial river flood water.
467: 449: 383: 371: 453: 415:
scheme, a link has been proposed to transfer surplus water from Icchampally to
395: 347: 214: 681: 898: 551: 537: 501: 487: 135: 122: 581: 420: 359: 309: 199: 180: 355: 305: 195: 176: 445: 577: 532:
This project's dam location can be shifted to the downstream side at
441: 394:) gross storage capacity at Full Reservoir Level (FRL) 112.77 m 379: 351: 301: 191: 172: 108: 406: 237: 686: 416: 391: 94: 727:"Godavari Water Disputes Tribunal final report, (page 52)" 350:
in India. This project is proposed as joint project of
878:"P.V.NARSIMHA RAO KANTHANPALLY SUJALASRAVANTHI PROJECT" 857:"Investors may shun thermal projects for solar energy" 370:
The project location is downstream of the point where
407:Icchampally - Cauvery - Grand Anicut Link Project 896: 630:"BJP launches padayatra for Ichampally project" 403:features with tail pond downstream of the dam. 825:"State wise flood damage statistics in India" 50:Location of Icchampalli Project in Telangana 682:"Video showing the remnants of the barrage" 70: 42: 656:"State mulls barrage at Ichampally site" 897: 563:Alternate location for Inchampalli dam 802:from the original on 18 December 2013 790:Brown, Lester R. (29 November 2013). 789: 426: 18:Dam in Karimnagar district, Telangana 13: 292:Icchampalli Hydro Electric Project 171:Joint ownership by Governments of 14: 936: 792:"India's dangerous 'food bubble'" 600:Godavari Water Disputes Tribunal 419:river, which would culminate at 300:Joint control by Governments of 242:57 (18 m x 12.37 m Radial Gates) 190:Joint control by Governments of 69: 62: 41: 34: 870: 587:Devadula lift irrigation scheme 401:Pumped-storage hydroelectricity 849: 817: 783: 751: 719: 694: 674: 648: 622: 1: 910:Inter-state disputes in India 615: 610:Underground coal gasification 463:underground coal gasification 7: 593: 365: 78:Icchampally Project (India) 10: 941: 448:(4,200 tmc) in Ghana and 382:. The Nizam of erstwhile 327: 315: 296: 291: 283: 275: 267: 259: 254: 246: 236: 228: 220: 210: 205: 186: 167: 159: 151: 114: 100: 90: 28: 23: 530:Alternate dam location: 413:Indian Rivers Inter-link 374:joins Godavari river in 915:Irrigation in Telangana 329:Installed capacity 905:Proposed dams in India 732:. 1980. Archived from 444:(4,600 tmc) in Egypt, 552:18.59417°N 80.38889°E 513:Kanthanapally barrage 502:18.45972°N 80.41583°E 263:Icchampalli Reservoir 136:18.63444°N 80.32389°E 53:Show map of Telangana 759:"Godavari basin map" 433:interstate agreement 276:Active capacity 920:Irrigation projects 547: /  497: /  376:Karimnagar district 344:Inchampalli Project 340:Icchampally Project 268:Total capacity 132: /  105:Karimnagar district 24:Icchampalli Project 837:on 9 November 2013 771:on 12 October 2013 739:on 12 January 2011 557:18.59417; 80.38889 507:18.45972; 80.41583 427:Interstate Aspects 247:Spillway type 141:18.63444; 80.32389 796:Los Angeles Times 636:. 23 January 2008 605:Polavaram Project 440:India similar to 337: 336: 284:Surface area 206:Dam and spillways 81:Show map of India 932: 889: 888: 886: 884: 874: 868: 867: 865: 863: 853: 847: 846: 844: 842: 836: 830:. Archived from 829: 821: 815: 811: 809: 807: 787: 781: 780: 778: 776: 770: 764:. Archived from 763: 755: 749: 748: 746: 744: 738: 731: 723: 717: 716: 714: 712: 698: 692: 691: 678: 672: 671: 669: 667: 652: 646: 645: 643: 641: 626: 571: 570: 568: 567: 566: 564: 559: 558: 553: 548: 545: 544: 543: 540: 521: 520: 518: 517: 516: 514: 509: 508: 503: 498: 495: 494: 493: 490: 470:sources such as 468:renewable energy 450:Three Gorges Dam 147: 146: 144: 143: 142: 137: 133: 130: 129: 128: 125: 82: 73: 72: 66: 54: 45: 44: 38: 21: 20: 940: 939: 935: 934: 933: 931: 930: 929: 895: 894: 893: 892: 882: 880: 876: 875: 871: 861: 859: 855: 854: 850: 840: 838: 834: 827: 823: 822: 818: 805: 803: 788: 784: 774: 772: 768: 761: 757: 756: 752: 742: 740: 736: 729: 725: 724: 720: 710: 708: 706:www.nwda.gov.in 700: 699: 695: 680: 679: 675: 665: 663: 654: 653: 649: 639: 637: 628: 627: 623: 618: 596: 562: 560: 556: 554: 550: 549: 546: 541: 538: 536: 534: 533: 512: 510: 506: 504: 500: 499: 496: 491: 488: 486: 484: 483: 429: 409: 384:Hyderabad State 372:Indravati River 368: 140: 138: 134: 131: 126: 123: 121: 119: 118: 86: 85: 84: 83: 80: 79: 76: 75: 74: 57: 56: 55: 52: 51: 48: 47: 46: 19: 12: 11: 5: 938: 928: 927: 925:Godavari basin 922: 917: 912: 907: 891: 890: 869: 848: 816: 782: 750: 718: 693: 673: 662:. 8 March 2008 647: 620: 619: 617: 614: 613: 612: 607: 602: 595: 592: 524:pumped storage 454:Godavari River 428: 425: 408: 405: 367: 364: 348:River Godavari 335: 334: 331: 325: 324: 322:Pumped-storage 319: 313: 312: 298: 294: 293: 289: 288: 285: 281: 280: 277: 273: 272: 269: 265: 264: 261: 257: 256: 252: 251: 248: 244: 243: 240: 234: 233: 230: 226: 225: 224:112.770 meters 222: 218: 217: 215:Godavari River 212: 208: 207: 203: 202: 188: 184: 183: 169: 165: 164: 161: 157: 156: 153: 149: 148: 116: 112: 111: 102: 98: 97: 92: 88: 87: 77: 68: 67: 61: 60: 59: 58: 49: 40: 39: 33: 32: 31: 30: 29: 26: 25: 17: 9: 6: 4: 3: 2: 937: 926: 923: 921: 918: 916: 913: 911: 908: 906: 903: 902: 900: 879: 873: 858: 852: 833: 826: 820: 814: 801: 797: 793: 786: 767: 760: 754: 735: 728: 722: 707: 703: 697: 689: 688: 683: 677: 661: 657: 651: 635: 631: 625: 621: 611: 608: 606: 603: 601: 598: 597: 591: 588: 583: 579: 575: 574:Thupaklagudem 569: 531: 527: 525: 519: 479: 477: 473: 469: 464: 458: 455: 451: 447: 443: 437: 434: 424: 422: 418: 414: 404: 402: 397: 393: 389: 385: 381: 377: 373: 363: 361: 357: 353: 349: 345: 341: 332: 330: 326: 323: 320: 318: 314: 311: 307: 303: 299: 295: 290: 286: 282: 278: 274: 271:10,375.88 Mm3 270: 266: 262: 258: 253: 249: 245: 241: 239: 235: 231: 227: 223: 219: 216: 213: 209: 204: 201: 197: 193: 189: 185: 182: 178: 174: 170: 166: 162: 158: 155:Multi-purpose 154: 150: 145: 117: 113: 110: 106: 103: 99: 96: 93: 89: 65: 37: 27: 22: 16: 881:. Retrieved 872: 860:. Retrieved 851: 839:. Retrieved 832:the original 819: 804:. Retrieved 795: 785: 773:. Retrieved 766:the original 753: 741:. Retrieved 734:the original 721: 709:. Retrieved 705: 696: 685: 676: 664:. Retrieved 659: 650: 638:. Retrieved 633: 624: 582:Chhattisgarh 529: 528: 480: 459: 438: 430: 421:Grand Anicut 410: 369: 360:Chhattisgarh 343: 339: 338: 310:Chhattisgarh 279:9,950.23 Mm3 232:1,278 meters 200:Chhattisgarh 181:Chhattisgarh 15: 555: / 505: / 476:solar power 431:As per the 411:As part of 356:Maharashtra 306:Maharashtra 297:Operator(s) 250:Radial Type 196:Maharashtra 187:Operator(s) 177:Maharashtra 139: / 115:Coordinates 899:Categories 775:30 January 711:27 January 616:References 561: ( 542:80°23′20″E 539:18°35′39″N 511: ( 492:80°24′57″E 489:18°27′35″N 478:in India. 472:wind power 446:Lake Volta 388:Dummugudem 127:80°19′26″E 124:18°38′04″N 841:4 January 666:11 August 660:The Hindu 640:11 August 634:The Hindu 578:Telangana 442:Aswan Dam 380:Telangana 352:Telangana 302:Telangana 255:Reservoir 238:Spillways 192:Telangana 173:Telangana 109:Telangana 883:25 March 862:21 March 800:Archived 743:21 March 594:See also 366:Features 362:states. 211:Impounds 168:Owner(s) 163:Proposed 101:Location 813:Alt URL 806:13 July 687:YouTube 287:970 Mm2 260:Creates 152:Purpose 91:Country 417:Kaveri 333:875 MW 308:& 229:Length 221:Height 198:& 179:& 160:Status 835:(PDF) 828:(PDF) 769:(PDF) 762:(PDF) 737:(PDF) 730:(PDF) 572:near 95:India 885:2015 864:2016 843:2013 808:2014 777:2012 745:2014 713:2021 668:2019 642:2019 474:and 358:and 342:(or 317:Type 396:MSL 392:tmc 378:of 901:: 798:. 794:. 704:. 684:. 658:. 632:. 423:. 354:, 304:, 194:, 175:, 107:, 887:. 866:. 845:. 810:. 779:. 747:. 715:. 690:. 670:. 644:. 565:) 515:)

Index

Icchampally Project is located in Telangana
Icchampally Project is located in India
India
Karimnagar district
Telangana
18°38′04″N 80°19′26″E / 18.63444°N 80.32389°E / 18.63444; 80.32389
Telangana
Maharashtra
Chhattisgarh
Telangana
Maharashtra
Chhattisgarh
Godavari River
Spillways
Telangana
Maharashtra
Chhattisgarh
Type
Pumped-storage
Installed capacity
River Godavari
Telangana
Maharashtra
Chhattisgarh
Indravati River
Karimnagar district
Telangana
Hyderabad State
Dummugudem
tmc