Green Brook Flood Control Project

Source 📝

182:, was replaced in 2012 as part of the Green Brook Flood Control project. The bridge currently slows water flow in the Green Brook during periods of high water runoff and causes flooding in the areas upstream of the bridge. The new bridge will be widened and raised to ease water flow. Federal funding is in place for Fiscal Year 2014 for the bridge replacement. Replacement of the bridge also will allow for additional future flood mitigation measures in the areas adjacent to the bridge, such as additional flood walls and levees. 87: 40: 147:
To improve water flow through Bound Brook, the former Conrail bridge over the Raritan River and its associated railroad embankment that were located east of Bound Brook were removed during 2007. The bridge and embankment, when they were in place, acted to block the river flow through the Bound Brook
165:
that is tied into the Green Brook Flood Control project. When completed, Finderne Farms will serve as a Somerset County park with trails through wetlands and ballfields. More importantly, Finderne Farms will serve as an upstream wetland that will help to reduce flooding in the Raritan River valley
102:
flooded Bound Brook with the second highest crest ever recorded in the area, as the envisioned flood protection systems were not yet fully in place. However, the April 2007 flooding did reinvigorate efforts to complete the flood levee protection system around Bound Brook, to protect it from future
82:
in 1999 caused yet more property damage and deaths in the Green Brook basin, especially in Bound Brook, and reinvigorated the flood control project. As of 2006, two levees have been built on the western and eastern sides of Bound Brook. An important levee (R2) on the southwestern side of Bound
83:
Brook, which would prevent the Raritan River from flooding the downtown and nearby residential areas, has been completed. Full 150 year protection of downtown and nearby residential areas of Bound Brook is effectively in place with final construction due to be completed by the summer of 2014.
129:
are functionally complete – The gate closures across the New Jersey Transit railroad tracks on the western side of Bound Brook and at the South Main Street railroad underpass that leads to Queens Bridge have been completed and are used to keep flood waters out of Bound
123:
is functionally complete – The R2 Levee System is designed to provide Bound Brook with protection from a 150-year flood level. The levee is built to the height of the raised Talmage Avenue Bridge.
334:- Observation gauge approximately one-half mile west (upstream) of Bound Brook, NJ, just below Calco Dam. Main Street in Bound Brook floods when the river reaches a 30-foot stage. 263:"Montana Construction Inc. | Heavy Construction | Greenbrook - Sebrings Mills Road Bridge Reconstruction NJ Flood Reduction for the U.S. Army Corps of Engineers" 174:
A roadway bridge called the Sebrings Bridge, which crosses the Green Brook and links Sebrings Mills Road and Greenbrook Road in the respective towns of
290: 201: 362: 28:
first proposed in the early 1970s in the wake of two major flooding events: a 1971 flood event and a major 1973 flood which ravaged the
262: 55: 352: 51:, which partially lies on a natural flood plain of the Raritan River at the junction of the Green Brook and Raritan River. 325: 357: 239: 319: 219: 141: 250: 99: 21: 313: 316:$ 400 Million Needed to Complete Project, $ 40 Million to Fully Protect Bound Brook - April 19, 2006 198: 140:
is functionally complete. The replacement bridge was built to the height of the R2 Levee to prevent
78:
The Green Brook Flood Control project has languished for decades due to a lack of federal funding.
302: 331: 175: 162: 137: 91: 48: 347: 266: 148:
area. To build the main Bound Brook R2 levee, the bridge and embankment needed to be removed.
179: 8: 58:
has proposed the Green Brook Sub Basin Flood Control Project, which entails numerous
36:
basins, causing millions in property damage and several deaths in central New Jersey.
205: 107: 79: 67: 307: 161:(also known as Finderne Farms) is a wetlands project upstream of Bound Brook in 341: 310:
U.S. Army Corps of Engineers Meeting With Local Officials - September 6, 2006
33: 29: 199:
US Army Corps of Engineers New York District: GREEN BROOK SUB BASIN, NJ
59: 25: 326:
House panel approves $ 5 million for Green Brook Flood Control Project
86: 39: 144:
and Raritan River waters from entering Bound Brook from the west.
220:"Flood waters cover Bound Brook as smell of oil is in the air" 43:
The proposed flood control measures in Bound Brook, New Jersey
63: 320:
Lawmakers work to keep flood-control funds from drying up
296: 291:
U.S. Army Corps of Engineers Green Brook Sub Basin Page
152: 293:- Army Corps Green Brook Flood Control Project Website 47:
The worst flooding in the Green Brook basin occurs in
106:Flooding of downtown occurred in August 2011 when 314:Officials pleaded for further flood control funds 308:Detailed Green Brook Flood Control Project Update 339: 303:History of The Green Brook Flood Control Project 73: 332:Raritan River Gauge, Bound Brook, New Jersey 166:by providing space for floodwaters to pool. 66:, channel diversions, widening projects and 217: 85: 38: 340: 54:To address this flooding problem, the 56:United States Army Corps of Engineers 297:Green Brook Flood Control Commission 251:Finderne Wetlands Mitigation Project 211: 159:Finderne Wetlands mitigation project 153:Finderne Wetlands mitigation project 13: 363:Flood control in the United States 169: 70:throughout the Green Brook basin. 14: 374: 284: 113: 18:Green Brook Flood Control Project 218:Eugene Paik (August 29, 2011). 255: 244: 233: 192: 136:that connects Bound Brook and 134:The new Talmadge Avenue Bridge 20:is a flood control project in 1: 185: 110:passed along the East Coast. 74:Floodings during the project 7: 353:Somerset County, New Jersey 127:Closure gates along Raritan 10: 379: 299:- Official Project Website 240:February Meeting Minutes 208:, accessed May 10, 2006. 100:April Nor'easter of 2007 163:Bridgewater, New Jersey 138:Bridgewater, New Jersey 92:Bound Brook, New Jersey 358:Flood control projects 95: 44: 89: 42: 322:- January 11, 2006 204:2003-08-20 at the 96: 45: 370: 278: 277: 275: 274: 265:. Archived from 259: 253: 248: 242: 237: 231: 230: 228: 226: 215: 209: 196: 94:, April 16, 2007 68:retention basins 378: 377: 373: 372: 371: 369: 368: 367: 338: 337: 287: 282: 281: 272: 270: 261: 260: 256: 249: 245: 238: 234: 224: 222: 216: 212: 206:Wayback Machine 197: 193: 188: 172: 170:Sebrings Bridge 155: 121:R2 levee system 116: 108:Hurricane Irene 80:Hurricane Floyd 76: 22:Somerset County 12: 11: 5: 376: 366: 365: 360: 355: 350: 336: 335: 329: 328:- May 18, 2005 323: 317: 311: 305: 300: 294: 286: 285:External links 283: 280: 279: 254: 243: 232: 210: 190: 189: 187: 184: 171: 168: 154: 151: 150: 149: 145: 131: 124: 115: 114:Current status 112: 75: 72: 9: 6: 4: 3: 2: 375: 364: 361: 359: 356: 354: 351: 349: 348:Raritan River 346: 345: 343: 333: 330: 327: 324: 321: 318: 315: 312: 309: 306: 304: 301: 298: 295: 292: 289: 288: 269:on 2021-05-16 268: 264: 258: 252: 247: 241: 236: 221: 214: 207: 203: 200: 195: 191: 183: 181: 177: 167: 164: 160: 146: 143: 139: 135: 132: 128: 125: 122: 118: 117: 111: 109: 104: 101: 93: 88: 84: 81: 71: 69: 65: 61: 57: 52: 50: 41: 37: 35: 34:Raritan River 31: 27: 23: 19: 271:. Retrieved 267:the original 257: 246: 235: 223:. Retrieved 213: 194: 173: 158: 156: 142:Middle Brook 133: 126: 120: 105: 97: 77: 53: 46: 17: 15: 176:Green Brook 60:flood walls 49:Bound Brook 30:Green Brook 24:in central 342:Categories 273:2020-11-26 225:August 31, 186:References 103:flooding. 26:New Jersey 180:Middlesex 90:Downtown 202:Archived 130:Brook. 64:levees 227:2011 178:and 157:The 119:The 98:The 32:and 16:The 344:: 62:, 276:. 229:.

Index

Somerset County
New Jersey
Green Brook
Raritan River

Bound Brook
United States Army Corps of Engineers
flood walls
levees
retention basins
Hurricane Floyd

Bound Brook, New Jersey
April Nor'easter of 2007
Hurricane Irene
Bridgewater, New Jersey
Middle Brook
Bridgewater, New Jersey
Green Brook
Middlesex
US Army Corps of Engineers New York District: GREEN BROOK SUB BASIN, NJ
Archived
Wayback Machine
"Flood waters cover Bound Brook as smell of oil is in the air"
February Meeting Minutes
Finderne Wetlands Mitigation Project
"Montana Construction Inc. | Heavy Construction | Greenbrook - Sebrings Mills Road Bridge Reconstruction NJ Flood Reduction for the U.S. Army Corps of Engineers"
the original
U.S. Army Corps of Engineers Green Brook Sub Basin Page
Green Brook Flood Control Commission