182:, was replaced in 2012 as part of the Green Brook Flood Control project. The bridge currently slows water flow in the Green Brook during periods of high water runoff and causes flooding in the areas upstream of the bridge. The new bridge will be widened and raised to ease water flow. Federal funding is in place for Fiscal Year 2014 for the bridge replacement. Replacement of the bridge also will allow for additional future flood mitigation measures in the areas adjacent to the bridge, such as additional flood walls and levees.
87:
40:
147:
To improve water flow through Bound Brook, the former
Conrail bridge over the Raritan River and its associated railroad embankment that were located east of Bound Brook were removed during 2007. The bridge and embankment, when they were in place, acted to block the river flow through the Bound Brook
165:
that is tied into the Green Brook Flood
Control project. When completed, Finderne Farms will serve as a Somerset County park with trails through wetlands and ballfields. More importantly, Finderne Farms will serve as an upstream wetland that will help to reduce flooding in the Raritan River valley
102:
flooded Bound Brook with the second highest crest ever recorded in the area, as the envisioned flood protection systems were not yet fully in place. However, the April 2007 flooding did reinvigorate efforts to complete the flood levee protection system around Bound Brook, to protect it from future
82:
in 1999 caused yet more property damage and deaths in the Green Brook basin, especially in Bound Brook, and reinvigorated the flood control project. As of 2006, two levees have been built on the western and eastern sides of Bound Brook. An important levee (R2) on the southwestern side of Bound
83:
Brook, which would prevent the
Raritan River from flooding the downtown and nearby residential areas, has been completed. Full 150 year protection of downtown and nearby residential areas of Bound Brook is effectively in place with final construction due to be completed by the summer of 2014.
129:
are functionally complete – The gate closures across the New Jersey
Transit railroad tracks on the western side of Bound Brook and at the South Main Street railroad underpass that leads to Queens Bridge have been completed and are used to keep flood waters out of Bound
123:
is functionally complete – The R2 Levee System is designed to provide Bound Brook with protection from a 150-year flood level. The levee is built to the height of the raised
Talmage Avenue Bridge.
334:- Observation gauge approximately one-half mile west (upstream) of Bound Brook, NJ, just below Calco Dam. Main Street in Bound Brook floods when the river reaches a 30-foot stage.
263:"Montana Construction Inc. | Heavy Construction | Greenbrook - Sebrings Mills Road Bridge Reconstruction NJ Flood Reduction for the U.S. Army Corps of Engineers"
174:
A roadway bridge called the
Sebrings Bridge, which crosses the Green Brook and links Sebrings Mills Road and Greenbrook Road in the respective towns of
290:
201:
362:
28:
first proposed in the early 1970s in the wake of two major flooding events: a 1971 flood event and a major 1973 flood which ravaged the
262:
55:
352:
51:, which partially lies on a natural flood plain of the Raritan River at the junction of the Green Brook and Raritan River.
325:
357:
239:
319:
219:
141:
250:
99:
21:
313:
316:$ 400 Million Needed to Complete Project, $ 40 Million to Fully Protect Bound Brook - April 19, 2006
198:
140:
is functionally complete. The replacement bridge was built to the height of the R2 Levee to prevent
78:
The Green Brook Flood
Control project has languished for decades due to a lack of federal funding.
302:
331:
175:
162:
137:
91:
48:
347:
266:
148:
area. To build the main Bound Brook R2 levee, the bridge and embankment needed to be removed.
179:
8:
58:
has proposed the Green Brook Sub Basin Flood
Control Project, which entails numerous
36:
basins, causing millions in property damage and several deaths in central New Jersey.
205:
107:
79:
67:
307:
161:(also known as Finderne Farms) is a wetlands project upstream of Bound Brook in
341:
310:
U.S. Army Corps of
Engineers Meeting With Local Officials - September 6, 2006
33:
29:
199:
US Army Corps of
Engineers New York District: GREEN BROOK SUB BASIN, NJ
59:
25:
326:
House panel approves $ 5 million for Green Brook Flood Control Project
86:
39:
144:
and Raritan River waters from entering Bound Brook from the west.
220:"Flood waters cover Bound Brook as smell of oil is in the air"
43:
The proposed flood control measures in Bound Brook, New Jersey
63:
320:
Lawmakers work to keep flood-control funds from drying up
296:
291:
U.S. Army Corps of Engineers Green Brook Sub Basin Page
152:
293:- Army Corps Green Brook Flood Control Project Website
47:
The worst flooding in the Green Brook basin occurs in
106:Flooding of downtown occurred in August 2011 when
314:Officials pleaded for further flood control funds
308:Detailed Green Brook Flood Control Project Update
339:
303:History of The Green Brook Flood Control Project
73:
332:Raritan River Gauge, Bound Brook, New Jersey
166:by providing space for floodwaters to pool.
66:, channel diversions, widening projects and
217:
85:
38:
340:
54:To address this flooding problem, the
56:United States Army Corps of Engineers
297:Green Brook Flood Control Commission
251:Finderne Wetlands Mitigation Project
211:
159:Finderne Wetlands mitigation project
153:Finderne Wetlands mitigation project
13:
363:Flood control in the United States
169:
70:throughout the Green Brook basin.
14:
374:
284:
113:
18:Green Brook Flood Control Project
218:Eugene Paik (August 29, 2011).
255:
244:
233:
192:
136:that connects Bound Brook and
134:The new Talmadge Avenue Bridge
20:is a flood control project in
1:
185:
110:passed along the East Coast.
74:Floodings during the project
7:
353:Somerset County, New Jersey
127:Closure gates along Raritan
10:
379:
299:- Official Project Website
240:February Meeting Minutes
208:, accessed May 10, 2006.
100:April Nor'easter of 2007
163:Bridgewater, New Jersey
138:Bridgewater, New Jersey
92:Bound Brook, New Jersey
358:Flood control projects
95:
44:
89:
42:
322:- January 11, 2006
204:2003-08-20 at the
96:
45:
370:
278:
277:
275:
274:
265:. Archived from
259:
253:
248:
242:
237:
231:
230:
228:
226:
215:
209:
196:
94:, April 16, 2007
68:retention basins
378:
377:
373:
372:
371:
369:
368:
367:
338:
337:
287:
282:
281:
272:
270:
261:
260:
256:
249:
245:
238:
234:
224:
222:
216:
212:
206:Wayback Machine
197:
193:
188:
172:
170:Sebrings Bridge
155:
121:R2 levee system
116:
108:Hurricane Irene
80:Hurricane Floyd
76:
22:Somerset County
12:
11:
5:
376:
366:
365:
360:
355:
350:
336:
335:
329:
328:- May 18, 2005
323:
317:
311:
305:
300:
294:
286:
285:External links
283:
280:
279:
254:
243:
232:
210:
190:
189:
187:
184:
171:
168:
154:
151:
150:
149:
145:
131:
124:
115:
114:Current status
112:
75:
72:
9:
6:
4:
3:
2:
375:
364:
361:
359:
356:
354:
351:
349:
348:Raritan River
346:
345:
343:
333:
330:
327:
324:
321:
318:
315:
312:
309:
306:
304:
301:
298:
295:
292:
289:
288:
269:on 2021-05-16
268:
264:
258:
252:
247:
241:
236:
221:
214:
207:
203:
200:
195:
191:
183:
181:
177:
167:
164:
160:
146:
143:
139:
135:
132:
128:
125:
122:
118:
117:
111:
109:
104:
101:
93:
88:
84:
81:
71:
69:
65:
61:
57:
52:
50:
41:
37:
35:
34:Raritan River
31:
27:
23:
19:
271:. Retrieved
267:the original
257:
246:
235:
223:. Retrieved
213:
194:
173:
158:
156:
142:Middle Brook
133:
126:
120:
105:
97:
77:
53:
46:
17:
15:
176:Green Brook
60:flood walls
49:Bound Brook
30:Green Brook
24:in central
342:Categories
273:2020-11-26
225:August 31,
186:References
103:flooding.
26:New Jersey
180:Middlesex
90:Downtown
202:Archived
130:Brook.
64:levees
227:2011
178:and
157:The
119:The
98:The
32:and
16:The
344::
62:,
276:.
229:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.