maximum height from foundation to crest of 3.3 metres (11 ft). A 60 metres (200 ft) long concrete weir has a maximum height from foundation to crest of 7.3 metres (24 ft) The desander has four intake bays with vertical lift gates and is 75 metres (246 ft) long, 8 metres (26 ft) wide and 4.5 metres (15 ft) deep. It was designed to discharge 12.45 cubic metres per second (440 cu ft/s).
40:
326:(0.31 mi) road to the dam site. Three households were relocated. The project reduced water available for irrigation at some sites, causing much resentment by farmers. The farmers at Daraundi A expected road improvements and an electricity supply from the project, but received neither. The project developers stated that these things were the responsibility of the government.
307:
From the desander there is a 3,578 metres (11,739 ft) reinforced concrete canal with a slope of 1:1000 and cross section of 2.5 by 25 metres (8 ft 2 in by 82 ft 0 in). There is a 201 metres (659 ft) canal siphon at Sota/Jhyalla Khola and a 173 metres (568 ft) pipe
273:
The project is located in the former Muchok, Takumajh
Lakuribot and Saurpani VDCs of Gorkha District. The flow from Daraundi River is used to generate 6 MW electricity. It has a catchment area upstream from the intake of 224 square kilometres (86 sq mi), and long-term annual average flow
349:
The project cost Rs 1.30 billion. Pricing would be Rs8.4 per kilowatt hour in the dry season, and Rs4.8 per kilowatt hour in the wet season. A ten-year payback was expected. The generation licence will expire in 2104-02-15 BS, after which the plant will be handed over to the government. The power
303:
The project has two trapezoidal coffer dams, with lengths of 185 metres (607 ft) and 130 metres (430 ft) and a height of 2.5 metres (8 ft 2 in) above the bed of the river. A concrete undersluice dam has one bay with a vertical lift gate, a 6 metres (20 ft) long weir with a
290:
Kalika
Construction began work in July 2013. In December 2013 the project director reported that work had begun on the intake structure, sedimentation site and office camp, and expected completion within one and a half years. About 200 people were employed on the project. The target for completion
286:
Nil Tara Pvt. Ltd. conducted the feasibility study for the
Daraudi-A Hydroelectric project. Orient Consult Pvt. Ltd. reviewed and revised the study, including changing the headrace canal to a tunnel and revisions to the layout. The revised design would give installed capacity of 6.5 MW and would
325:
It was assumed that the
Daraundu hydropower project and dam would obstruct migration of fish and severely reduce their population. The project required acquisition of about 6 hectares (15 acres) of land, and including improving 27 kilometres (17 mi) of road and building a 0.5 kilometres
311:
The powerhouse is in
Chanaute. A 300 metres (980 ft) penstock pipe with diameter 2.1 metres (6 ft 11 in) leads from the forebay to the powerhouse. The gross head from the forebay is 66 metres (217 ft). The power station holds two horizontal axis
707:
316:
with rated capacity 5.66 cubic metres (200 cu ft) connected to two generators with capacity 3.2 MW. From the switch yard the power is transmitted over a 14 kilometres (8.7 mi) 33kV single circuit line to the Gorkha substation.
291:
was July 2015, but delays were caused by earthquakes and blockages. On 8 September 2016 the project began trial electricity generation. The plant started delivering electricity from 2073-08-12 BS (28 October 2016). It was inaugurated by
308:
siphon at
Chainage. The forebay has a surface area of 830 cubic metres (29,000 cu ft) and capacity of 2,490 metres (8,170 ft), with an 80 metres (260 ft) spillway to Syangdi Khola.
594:
Nepal's
Hydropower Boom and its Implications for Water Resources: Challenges and Opportunities at the Intersection of Food and Energy Production in the Gandaki River Basin
765:
343:
674:"Inauguration of Daraudi Hydropower Project, generating electricity from tomorrow (दरौदी जलविद्युत आयोजनाको उद्घाटन, भोलिबाट विजुली उत्पादन गर्ने)"
691:
87:
635:
735:
693:
Local Shares: An In-depth
Examination of the Opportunities and Risks for Local Communities Seeking to Invest in Nepal's Hydropower Projects
745:
335:
32:
760:
626:
342:
report as being one of the hydropower companies operating after 2010 that had not issued local shares. The main investor is
204:
592:
181:
407:
231:
274:
at this point of 17.7 cubic metres per second (630 cu ft/s). Lower down the
Daraundi Khola joins the
226:
708:"Trial Production of Daraundi A Hydropower Project Started (दरौँदी ए जलविद्युत आयोजनाको परीक्षण उत्पादन सुरु)"
655:
755:
221:
351:
641:
176:
278:
at Abun
Khaireni about 3 kilometres (1.9 mi) upstream from the tailrace of the Marshyangdi dam.
399:
750:
436:
434:
432:
430:
428:
426:
424:
422:
740:
616:
598:
419:
216:
8:
602:
292:
188:
622:
275:
494:
492:
490:
477:
475:
473:
540:
487:
470:
313:
262:
250:
75:
634:
458:
440:
258:
161:
673:
729:
102:
89:
385:
371:
446:
350:
station is connected to the national grid and the electricity is sold to
334:
The plant is developed and partially owned by Daraundi Kalika Hydro, an
339:
706:
672:
498:
481:
654:
504:
464:
690:
559:
546:
393:
207:
257:) is a 6 MW run-of-river hydro-electric plant located on the
379:
148:
528:
516:
614:
510:
452:
361:
47:Location of Daraundi A Hydropower Station in Nepal
39:
727:
590:
534:
522:
295:(Prachanda), former prime minister of Nepal.
618:Impact of Dam on Fish in the Rivers of Nepal
441:Daraudi-'A' Hydroelectric Project ... Kalika
268:
766:Buildings and structures in Gorkha District
656:"Daraundi A hydropower project takes speed"
615:Asian Development Bank (1 December 2018),
499:Inauguration of Daraudi Hydropower Project
482:Trial Production of Daraundi A ... Started
696:, International Finance Corporation, 2018
465:Daraundi A hydropower project takes speed
338:. As of 2018 the company was listed in a
547:Local Shares: An In-depth Examination...
329:
637:Daraudi-'A' Hydroelectric Project (6MW)
560:"Operating Projects- Hydro (Above 1MW)"
728:
736:Hydroelectric power stations in Nepal
13:
14:
777:
597:(Thesis), University of Arizona,
392:
378:
364:
38:
31:
746:Run-of-the-river power stations
566:
552:
408:List of power stations in Nepal
281:
640:, Kalika Group, archived from
576:. Nepal Electricity Authority.
1:
413:
243:Daraundi A Hydropower Station
59:Daraundi A Hydropower Project
22:Daraundi A Hydropower Station
761:2016 establishments in Nepal
298:
287:deliver 35.51 GWh per year.
7:
511:Asian Development Bank 2018
453:Asian Development Bank 2018
357:
352:Nepal Electricity Authority
232:GPX (secondary coordinates)
10:
782:
621:, Asian Development Bank,
583:
336:Independent Power Producer
320:
269:Location and water source
254:
227:GPX (primary coordinates)
202:Map all coordinates using
187:
175:
167:
157:
147:
142:
134:
126:
118:
81:
71:
63:
55:
26:
21:
255:दरौदी A जलविद्युत आयोजना
210:Download coordinates as:
574:Annual Report 2019/2026
400:Renewable energy portal
189:Installed capacity
103:28.134106°N 84.686519°E
591:Arica Crootof (2019),
16:Dam in Gorkha District
330:Ownership and finance
222:GPX (all coordinates)
149:Type of dam
138:Daraundi Kalika Hydro
168:Commission date
108:28.134106; 84.686519
756:Irrigation in Nepal
603:2019PhDT.......108C
99: /
662:, 14 December 2013
660:Nepal Energy Forum
535:Arica Crootof 2019
523:Arica Crootof 2019
293:Pushpa Kamal Dahal
628:978-92-9261-433-1
276:Marshyangdi river
197:
196:
143:Dam and spillways
773:
721:
720:
719:
712:Nepali Headlines
703:
702:
701:
687:
686:
685:
669:
668:
667:
651:
650:
649:
631:
611:
610:
609:
578:
577:
570:
564:
563:
556:
550:
544:
538:
532:
526:
520:
514:
508:
502:
496:
485:
479:
468:
462:
456:
450:
444:
438:
402:
397:
396:
388:
383:
382:
374:
369:
368:
367:
314:Francis turbines
256:
182:Run-of-the-river
114:
113:
111:
110:
109:
104:
100:
97:
96:
95:
92:
42:
41:
35:
19:
18:
781:
780:
776:
775:
774:
772:
771:
770:
726:
725:
724:
717:
715:
699:
697:
683:
681:
665:
663:
647:
645:
629:
607:
605:
586:
581:
572:
571:
567:
558:
557:
553:
545:
541:
533:
529:
521:
517:
509:
505:
497:
488:
480:
471:
463:
459:
451:
447:
439:
420:
416:
398:
391:
384:
377:
370:
365:
363:
360:
344:Global IME Bank
332:
323:
301:
284:
271:
263:Gorkha District
240:
239:
238:
237:
236:
107:
105:
101:
98:
93:
90:
88:
86:
85:
76:Gorkha District
51:
50:
49:
48:
45:
44:
43:
17:
12:
11:
5:
779:
769:
768:
763:
758:
753:
748:
743:
738:
723:
722:
704:
688:
670:
652:
632:
627:
612:
587:
585:
582:
580:
579:
565:
551:
549:, p. 117.
539:
527:
515:
503:
486:
469:
457:
445:
417:
415:
412:
411:
410:
404:
403:
389:
375:
359:
356:
331:
328:
322:
319:
300:
297:
283:
280:
270:
267:
259:Daraundi River
235:
234:
229:
224:
219:
213:
200:
199:
198:
195:
194:
191:
185:
184:
179:
173:
172:
169:
165:
164:
162:Daraundi River
159:
155:
154:
151:
145:
144:
140:
139:
136:
132:
131:
128:
124:
123:
120:
116:
115:
83:
79:
78:
73:
69:
68:
65:
61:
60:
57:
53:
52:
46:
37:
36:
30:
29:
28:
27:
24:
23:
15:
9:
6:
4:
3:
2:
778:
767:
764:
762:
759:
757:
754:
752:
751:Dams in Nepal
749:
747:
744:
742:
739:
737:
734:
733:
731:
713:
709:
705:
695:
694:
689:
679:
678:Online Khabar
675:
671:
661:
657:
653:
644:on 2020-10-31
643:
639:
638:
633:
630:
624:
620:
619:
613:
604:
600:
596:
595:
589:
588:
575:
569:
561:
555:
548:
543:
537:, p. 96.
536:
531:
525:, p. 94.
524:
519:
512:
507:
500:
495:
493:
491:
483:
478:
476:
474:
466:
461:
454:
449:
442:
437:
435:
433:
431:
429:
427:
425:
423:
418:
409:
406:
405:
401:
395:
390:
387:
381:
376:
373:
362:
355:
353:
347:
345:
341:
337:
327:
318:
315:
309:
305:
296:
294:
288:
279:
277:
266:
264:
260:
252:
248:
244:
233:
230:
228:
225:
223:
220:
218:
215:
214:
212:
211:
206:
205:OpenStreetMap
203:
192:
190:
186:
183:
180:
178:
174:
171:2073-08-12 BS
170:
166:
163:
160:
156:
152:
150:
146:
141:
137:
133:
129:
125:
121:
117:
112:
84:
80:
77:
74:
70:
66:
62:
58:
56:Official name
54:
34:
25:
20:
741:Gravity dams
716:, retrieved
714:, 2016-10-17
711:
698:, retrieved
692:
682:, retrieved
677:
664:, retrieved
659:
646:, retrieved
642:the original
636:
617:
606:, retrieved
593:
573:
568:
554:
542:
530:
518:
506:
460:
455:, PT60–PT61.
448:
386:Water portal
372:Nepal portal
348:
333:
324:
310:
306:
302:
289:
285:
282:Construction
272:
246:
242:
241:
209:
208:
201:
680:(in Nepali)
130:Operational
106: /
82:Coordinates
730:Categories
718:2020-11-30
700:2020-12-02
684:2020-11-30
666:2020-12-02
648:2020-12-02
608:2020-12-02
414:References
340:World Bank
265:of Nepal.
94:84°41′11″E
91:28°08′03″N
299:Technical
247:Daraudi A
358:See also
158:Impounds
135:Owner(s)
72:Location
599:Bibcode
584:Sources
513:, PT61.
261:in the
153:Gravity
119:Purpose
64:Country
625:
321:Impact
251:Nepali
127:Status
122:Power
67:Nepal
623:ISBN
245:(or
193:6 MW
177:Type
217:KML
732::
710:,
676:,
658:,
489:^
472:^
421:^
354:.
346:.
253::
249:;
601::
562:.
501:.
484:.
467:.
443:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.