The core section of the pathway (from
Harewood Road to Matai Street) was constructed in the late 1990s / early 2000s. Of the five road crossings, three (Fendalton Road, Wairakei Road and Glandovey Road) were considered to require
150:, which is operational. It is essentially flat, varying in width from 1.8 metres (5 ft 11 in) wide to 3.5 metres (11 ft) wide depending on the available corridor. A description of the route can be found in a
194:
control. One of the crossing points (Blighs Road) has since been retrofitted with traffic signals. The 2010 extension to
Tuckers Road also included the creation of a signalised crossing at Northcote Road.
133:) in the north. The northernmost section, from Northcote Road to Tuckers Road, was completed in early 2010. When this section was finished, the pathway was about 6 kilometres (3.7 mi) long.
198:
The signalised crossings feature bicycle detectors on the pathway well in advance of the intersections, so that riders receive a green signal as they arrive at the crossings.
327:
217:
South, there are plans in the next decade to continue the pathway along the railway line through
Riccarton across Riccarton Road and on to Blenheim Road and the
221:. Longer-term, the current city transport strategic plan envisages linking this corridor with others along the railway lines to the west and southeast.
267:
206:
A pathway extension to the north (from
Tuckers Road to Main North Road) is under design and was in the 2009–19 Long Term Plan prior to the
240:
218:
299:
366:
157:
Despite its commonly used name, the pathway is a shared pedestrian/cycle facility. It connects a number of schools (e.g.
361:
324:
162:
191:
210:. A feasibility study commissioned by Christchurch City Council also covered an extension to the suburb of
147:
110:
274:
207:
170:
151:
130:
237:
118:
169:) and provides an off-road commuter connection from the northern suburbs to Riccarton and the
30:
211:
8:
158:
303:
255:
331:
244:
355:
114:
52:
181:
214:, and possible links to the proposed Northern Arterial Highway Corridor.
185:
Pathway users crossing
Fendalton Road with the help of traffic signals.
122:
60:
346:
166:
126:
256:
W.Lloyd, "Papanui
Railway Cycleway – Dedicated Cycle Signals"
117:. The route currently extends from Kilmarnock Street (
238:
CCC Papanui to City cycle map and route description
325:Christchurch Transport Strategic Plan 2012–42, CCC
353:
65:Kilmarnock Street (south) / Tuckers Road (north)
268:"CCC Cycleways Improvement Programme 2009–19"
201:
347:Christchurch City Council cycling website
180:
176:
165:) and local shopping centres (Papanui,
354:
300:"Christchurch Northern Arterial, NZTA"
16:Cycleway in Christchurch, New Zealand
13:
146:The path follows the route of the
14:
378:
340:
141:
29:
163:Christchurch Girls' High School
318:
292:
260:
249:
231:
35:Pathway south of Wairakei Road
1:
224:
107:Christchurch Railway Cycleway
24:Christchurch Railway Cycleway
219:Christchurch railway station
7:
10:
383:
367:Rail trails in New Zealand
362:Transport in Christchurch
152:Christchurch City Council
95:
87:
79:
69:
59:
48:
40:
28:
23:
202:Proposed path extensions
136:
121:) in the south, through
330:6 November 2013 at the
243:15 October 2008 at the
44:6 km (3.7 mi)
208:Canterbury earthquakes
186:
184:
177:Intersection control
280:on 12 February 2013
161:, Waimairi School,
159:Papanui High School
80:Elevation gain/loss
187:
111:Main North railway
129:to Tuckers Road (
103:
102:
374:
334:
322:
316:
315:
313:
311:
302:. Archived from
296:
290:
289:
287:
285:
279:
273:. Archived from
272:
264:
258:
253:
247:
235:
33:
21:
20:
382:
381:
377:
376:
375:
373:
372:
371:
352:
351:
343:
338:
337:
332:Wayback Machine
323:
319:
309:
307:
298:
297:
293:
283:
281:
277:
270:
266:
265:
261:
254:
250:
245:Wayback Machine
236:
232:
227:
204:
179:
148:Main North Line
144:
139:
74:
36:
17:
12:
11:
5:
380:
370:
369:
364:
350:
349:
342:
341:External links
339:
336:
335:
317:
306:on 24 May 2012
291:
259:
248:
229:
228:
226:
223:
203:
200:
192:traffic signal
178:
175:
143:
140:
138:
135:
101:
100:
97:
93:
92:
89:
85:
84:
81:
77:
76:
71:
67:
66:
63:
57:
56:
50:
46:
45:
42:
38:
37:
34:
26:
25:
15:
9:
6:
4:
3:
2:
379:
368:
365:
363:
360:
359:
357:
348:
345:
344:
333:
329:
326:
321:
305:
301:
295:
276:
269:
263:
257:
252:
246:
242:
239:
234:
230:
222:
220:
215:
213:
209:
199:
196:
193:
183:
174:
172:
168:
164:
160:
155:
154:publication.
153:
149:
142:Existing path
134:
132:
128:
124:
120:
116:
112:
108:
98:
94:
90:
86:
82:
78:
72:
68:
64:
62:
58:
55:, New Zealand
54:
51:
47:
43:
39:
32:
27:
22:
19:
320:
308:. Retrieved
304:the original
294:
282:. Retrieved
275:the original
262:
251:
233:
216:
205:
197:
188:
171:central city
156:
145:
115:Christchurch
109:follows the
106:
104:
53:Christchurch
18:
356:Categories
225:References
99:Year round
88:Difficulty
61:Trailheads
310:5 January
284:5 January
131:Northcote
123:Fendalton
119:Riccarton
328:Archived
241:Archived
49:Location
212:Belfast
167:Strowan
127:Papanui
75:Cycling
73:Walking
96:Season
41:Length
278:(PDF)
271:(PDF)
137:Route
312:2013
286:2013
125:and
105:The
91:Easy
113:in
83:nil
70:Use
358::
173:.
314:.
288:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.