Passenger service on the line continued until September 5, 1958, except for a discontinuance from 1949 to 1952. However, most local stops including Assonet, Crystal Spring, and Somerset Junction were discontinued by the 1930s; by the end of service, trains ran nonstop from Fall River to Taunton. The
369:
opened through Freetown in 1845. Two stations on the line in Freetown were open until the 1930s. Freetown was announced as a potential South Coast Rail station in 2009. The planned station site was relocated slightly to the northeast in 2018. A construction contract was issued in 2020, and the
551:
The MBTA awarded a $ 159 million contract for construction of the Fall River Secondary portion of the project, including Freetown station, in May 2020. Service was then planned to begin in November 2023. The station was 27% complete by February 2022, with 82% of platform foundations complete.
527:
village. Station plans released as part of the Final Environmental Impact Report in 2013 were nearly identical to the 2009 plans. On June 11, 2010, the state took ownership of the Fall River Subdivision (renamed the Fall River Secondary) and several other
535:
In 2017, the project was re-evaluated due to cost issues. A new proposal released in March 2017 called for early service via Middleborough by 2024, followed by full service via Stoughton by 2029. Freetown would have only been built as an
552:
Substantial completion of the Fall River Secondary work was announced at an event at Freetown station in December 2022. Opening was delayed to mid-2024 in September 2023. In June 2024, the opening of the project was delayed to May 2025.
1034: 410:
lane will be located next to the platform, with a driveway to South Main Street. A canopy will cover the portion of the platform adjacent to the entrance from the parking lot, with smaller canopies near the ends of the platform.
597: 856:
Volume II: FEIS/FEIR Figures Final Environmental Impact Statement/Final Environmental Impact Report on the South Coast Rail Project proposed by the Massachusetts Department of Transportation
1089: 1042: 822: 958: 468:, was located further to the south in northern Fall River near the Freetown border. Service was consolidated in 1854 under the Old Colony and Fall River Railroad (later the 520:
serving one track, with a second track allowing freight trains to pass the high-level platform. The station was planned to be the anchor of Assonet Village, a new
774: 1084: 894: 84: 605: 1019: 701: 1094: 684: 869: 758: 830:. Massachusetts Executive Office of Transportation and Executive Office of Housing and Economic Development. June 2009. p. 79. Archived from 930: 798: 831: 985: 548:
moved the planned station about 0.2 miles (0.32 km) northeast, as the previously planned site had been developed for use by a business.
516:
project, including a Freetown station off South Main Street near the Route 24/79 expressway. A 2009 conceptual design called for a single
540:
during the second phase. By mid-2017, plans called for the first phase to be completed in 2022, and to include stations at Freetown and
263: 259: 962: 1020:"Baker-Polito Administration Celebrates Substantial Completion of $ 159 Million Contract for South Coast Rail Main Line Construction" 1002: 848: 154: 916: 781: 902: 1064: 726: 649: 1079: 17: 465: 876: 524: 441: 665: 619: 577: 433: 366: 941: 805: 763:. New York, New Haven and Hartford Railroad. April 24, 1955. p. 31 – via Wikimedia Commons. 500: 47: 541: 383: 347: 72: 437: 391: 387: 379: 343: 68: 986:"MBTA Construction Contract No. K78CN03: Fall River Secondary Commuter Rail Expansion Project" 521: 402:. A freight passing siding will be located on the east side of the main track. A 107-space 399: 355: 273: 119: 1035:"South Coast Rail passenger service is being delayed. Here's why, explained in 60 seconds" 8: 961:(Press release). Massachusetts Department of Transportation. May 11, 2020. Archived from 469: 529: 489: 473: 339: 293: 722: 645: 940:. Massachusetts Department of Transportation. Summer 2017. p. 3. Archived from 598:"'MBTA owes this region an apology': South Coast Rail start is delayed another year" 513: 351: 286: 875:. Massachusetts Department of Transportation. June 2010. p. 7. Archived from 480:
line continued to be used for freight service by the New Haven and its successors
780:. Massachusetts Executive Office of Transportation. October 2008. Archived from 537: 1022:(Press release). Massachusetts Bay Transportation Authority. December 8, 2022. 354:
project. The station will have a single side platform on the west side of the
1073: 517: 407: 403: 395: 359: 278: 130: 99: 86: 746:. New York, New Haven and Hartford Railroad. September 26, 1937. p. 28. 1008:. Massachusetts Bay Transportation Authority. February 24, 2022. p. 6. 804:. Massachusetts Department of Transportation. June 30, 2009. Archived from 622:. Massachusetts Department of Transportation. October 25, 2018. p. 13. 481: 424: 919:. Massachusetts Department of Transportation. March 15, 2017. p. 5. 394:
expressway. It will have a single 800-foot (240 m)-long high-level
689:. Everts & Richards. 1895. pp. 148–149 – via Ward Maps. 350:. It is planned to open in May 2025 as part of the first phase of the 444:
in December 1846. Two stations were located on the line in Freetown:
706:. Everts & Richards. 1895. pp. 48–49 – via Ward Maps. 576:
VHB/HNTB (January 31, 2018). "Chapter 2 – Alternatives Analysis".
858:. U.S. Army Corps of Engineers New England District. August 2013. 509: 485: 378:
Freetown station will be located in the southwestern part of the
849:"Figure 3.2-27 Freetown Depot Station Conceptual Station Design" 824:
South Coast Rail Economic Development and Land Use Corridor Plan
1059: 703:
New Topological Atlas of Surveys, Bristol County, Massachusetts
686:
New Topological Atlas of Surveys, Bristol County, Massachusetts
579:
South Coast Rail Draft Supplemental Environmental Impact Report
1090:
MBTA Commuter Rail stations in Bristol County, Massachusetts
959:"South Coast Rail Main Line Construction Contract Approved" 760:
The Scenic Shoreline Route Serving New York and New England
895:"State changes gears on Middleborough commuter rail plan" 52:
Freetown station during a ribbon cutting in December 2022
1003:"South Coast Rail Briefing for MBTA Board of Directors" 370:
station was substantially completed in December 2022.
721:. Boston Street Railway Association. pp. 34–36. 672:. June 5, 1845. p. 2 – via Newspapers.com. 620:"South Coast Rail Project Phase 1 - Freetown Meeting" 29:
Future railway station in Freetown, Massachusetts, US
504:
Construction of the new passing siding in April 2021
644:(2 ed.). Branch Line Press. pp. 401–405. 544:in Phase 1 rather than Phase 2. The January 2018 398:on the west side of the single main track of the 1071: 1085:Under-construction MBTA Commuter Rail stations 717:Humphrey, Thomas J.; Clark, Norton D. (1985). 546:Draft Supplemental Environmental Impact Report 991:. Massachusetts Bay Transportation Authority. 716: 582:. Massachusetts Department of Transportation. 512:released 18 potential station sites for the 386:between the South Main Street and the Route 775:"South Coast Rail Fact Sheet: October 2008" 757:"Table 19: Boston-New Bedford-Fall River". 719:Boston's Commuter Rail: The First 150 Years 1095:Railway stations scheduled to open in 2025 46: 938:South Coast Rail - Summer 2017 Fact Sheet 591: 589: 1032: 595: 575: 499: 423: 983: 951: 710: 571: 569: 567: 565: 14: 1072: 892: 799:"Freetown - Freetown Rail Alternative" 642:The Rail Lines of Southern New England 586: 886: 635: 633: 631: 629: 464:), the junction with the 1866-opened 440:on June 9, 1845; it was completed to 257: 150: 1033:Medeiros, Dan (September 29, 2023). 639: 562: 472:); the Old Colony was leased to the 419: 909: 532:lines as part of a sale agreement. 495: 24: 984:Tabakin, Jennifer (May 11, 2020). 626: 25: 1106: 1053: 893:Dungca, Nicole (March 22, 2017). 373: 1058: 870:"The Massachusetts Rail Program" 258: 229:60 (projected weekday boardings) 149: 1026: 1012: 995: 977: 931:"South Coast Rail Corridor Map" 923: 862: 841: 815: 791: 767: 750: 596:Medeiros, Dan (June 13, 2024). 735: 693: 676: 658: 612: 13: 1: 555: 466:Dighton and Somerset Railroad 428:A postcard of Assonet station 525:transit-oriented development 7: 10: 1111: 917:"Notice of Project Change" 640:Karr, Ronald Dale (2017). 436:opened from Fall River to 414: 325: 318: 314: 310: 306: 267: 254: 250: 245: 241: 237: 233: 225: 221: 216: 208: 203: 195: 190: 182: 174: 166: 161: 145: 137: 125: 115: 100:41.7726528°N 71.0936889°W 78: 62: 57: 45: 34: 670:The Brooklyn Daily Eagle 492:Fall River Subdivision. 1080:Freetown, Massachusetts 348:Freetown, Massachusetts 342:station located in the 105:41.7726528; -71.0936889 73:Freetown, Massachusetts 1045:on September 30, 2023. 700:"City of Fall River". 505: 488:, then finally as the 429: 388:Massachusetts Route 24 1067:at Wikimedia Commons 947:on September 5, 2017. 666:"Fall River Railroad" 503: 427: 837:on December 7, 2013. 683:"Town of Freetown". 400:Fall River Secondary 356:Fall River Secondary 120:Fall River Secondary 787:on August 12, 2017. 508:In September 2008, 470:Old Colony Railroad 456:) at Copicut Road. 448:at Elm Street, and 434:Fall River Railroad 367:Fall River Railroad 96: /  58:General information 905:on April 11, 2017. 811:on March 21, 2012. 506: 474:New Haven Railroad 430: 340:MBTA Commuter Rail 268:Following station 255:Preceding station 212:May 2025 (planned) 175:Bicycle facilities 1063:Media related to 608:on June 14, 2024. 458:Somerset Junction 420:Previous stations 333: 332: 329: 328: 302: 301: 191:Other information 66:South Main Street 16:(Redirected from 1102: 1065:Freetown station 1062: 1047: 1046: 1041:. Archived from 1030: 1024: 1023: 1016: 1010: 1009: 1007: 999: 993: 992: 990: 981: 975: 974: 972: 970: 955: 949: 948: 946: 935: 927: 921: 920: 913: 907: 906: 901:. Archived from 890: 884: 883: 882:on May 24, 2012. 881: 874: 866: 860: 859: 853: 845: 839: 838: 836: 829: 819: 813: 812: 810: 803: 795: 789: 788: 786: 779: 771: 765: 764: 754: 748: 747: 739: 733: 732: 714: 708: 707: 697: 691: 690: 680: 674: 673: 662: 656: 655: 637: 624: 623: 616: 610: 609: 604:. Archived from 593: 584: 583: 573: 514:South Coast Rail 496:South Coast Rail 352:South Coast Rail 336:Freetown station 316: 315: 287:South Coast Rail 262: 252: 251: 246:Planned services 153: 152: 111: 110: 108: 107: 106: 101: 97: 94: 93: 92: 89: 50: 32: 31: 21: 1110: 1109: 1105: 1104: 1103: 1101: 1100: 1099: 1070: 1069: 1056: 1051: 1050: 1039:The Herald News 1031: 1027: 1018: 1017: 1013: 1005: 1001: 1000: 996: 988: 982: 978: 968: 966: 965:on May 16, 2020 957: 956: 952: 944: 933: 929: 928: 924: 915: 914: 910: 891: 887: 879: 872: 868: 867: 863: 851: 847: 846: 842: 834: 827: 821: 820: 816: 808: 801: 797: 796: 792: 784: 777: 773: 772: 768: 756: 755: 751: 741: 740: 736: 729: 715: 711: 699: 698: 694: 682: 681: 677: 664: 663: 659: 652: 638: 627: 618: 617: 613: 602:The Herald News 594: 587: 574: 563: 558: 542:Battleship Cove 498: 442:South Braintree 422: 417: 376: 358:, along with a 321: 298: 281: 104: 102: 98: 95: 90: 87: 85: 83: 82: 67: 53: 41: 40: 39: 30: 23: 22: 18:Assonet station 15: 12: 11: 5: 1108: 1098: 1097: 1092: 1087: 1082: 1055: 1054:External links 1052: 1049: 1048: 1025: 1011: 994: 976: 950: 922: 908: 885: 861: 840: 814: 790: 766: 749: 734: 727: 709: 692: 675: 657: 650: 625: 611: 585: 560: 559: 557: 554: 538:infill station 497: 494: 450:Crystal Spring 421: 418: 416: 413: 375: 374:Station design 372: 331: 330: 327: 326: 323: 322: 319: 312: 311: 308: 307: 304: 303: 300: 299: 296: 291: 289: 284: 282: 276: 270: 269: 266: 256: 248: 247: 243: 242: 239: 238: 235: 234: 231: 230: 227: 223: 222: 219: 218: 214: 213: 210: 206: 205: 201: 200: 197: 193: 192: 188: 187: 184: 180: 179: 176: 172: 171: 168: 164: 163: 159: 158: 147: 143: 142: 139: 135: 134: 127: 123: 122: 117: 113: 112: 80: 76: 75: 64: 60: 59: 55: 54: 51: 43: 42: 37: 36: 35: 28: 9: 6: 4: 3: 2: 1107: 1096: 1093: 1091: 1088: 1086: 1083: 1081: 1078: 1077: 1075: 1068: 1066: 1061: 1044: 1040: 1036: 1029: 1021: 1015: 1004: 998: 987: 980: 964: 960: 954: 943: 939: 932: 926: 918: 912: 904: 900: 896: 889: 878: 871: 865: 857: 850: 844: 833: 826: 825: 818: 807: 800: 794: 783: 776: 770: 762: 761: 753: 745: 738: 730: 728:9780685412947 724: 720: 713: 705: 704: 696: 688: 687: 679: 671: 667: 661: 653: 651:9780942147124 647: 643: 636: 634: 632: 630: 621: 615: 607: 603: 599: 592: 590: 581: 580: 572: 570: 568: 566: 561: 553: 549: 547: 543: 539: 533: 531: 526: 523: 519: 518:side platform 515: 511: 502: 493: 491: 487: 483: 477: 475: 471: 467: 463: 459: 455: 451: 447: 443: 439: 435: 426: 412: 409: 408:kiss-and-ride 405: 404:park and ride 401: 397: 396:side platform 393: 389: 385: 381: 371: 368: 363: 361: 360:park and ride 357: 353: 349: 345: 341: 337: 324: 317: 313: 309: 305: 295: 292: 290: 288: 285: 283: 280: 279:South Station 275: 272: 271: 265: 261: 253: 249: 244: 240: 236: 232: 228: 224: 220: 215: 211: 207: 202: 198: 194: 189: 185: 181: 177: 173: 169: 165: 160: 156: 148: 144: 140: 136: 132: 131:side platform 128: 124: 121: 118: 114: 109: 88:41°46′21.55″N 81: 77: 74: 70: 65: 61: 56: 49: 44: 33: 27: 19: 1057: 1043:the original 1038: 1028: 1014: 997: 979: 967:. Retrieved 963:the original 953: 942:the original 937: 925: 911: 903:the original 899:Boston Globe 898: 888: 877:the original 864: 855: 843: 832:the original 823: 817: 806:the original 793: 782:the original 769: 759: 752: 743: 742:"Table 31". 737: 718: 712: 702: 695: 685: 678: 669: 660: 641: 614: 606:the original 601: 578: 550: 545: 534: 507: 482:Penn Central 478: 461: 457: 453: 449: 445: 431: 377: 364: 338:is a future 335: 334: 274:East Taunton 162:Construction 91:71°5′37.28″W 26: 406:lot with a 382:village in 346:village of 146:Connections 103: / 79:Coordinates 1074:Categories 556:References 294:Fall River 217:Passengers 183:Accessible 170:170 spaces 522:mixed-use 476:in 1893. 196:Fare zone 133:(planned) 126:Platforms 744:Form 200 454:Thwaites 384:Freetown 320:Location 297:Terminus 178:8 spaces 63:Location 38:Freetown 969:May 12, 510:MassDOT 486:Conrail 462:Millers 446:Assonet 438:Myricks 415:History 380:Assonet 344:Assonet 277:toward 209:Opening 204:History 167:Parking 116:Line(s) 69:Assonet 725:  648:  138:Tracks 1006:(PDF) 989:(PDF) 945:(PDF) 934:(PDF) 880:(PDF) 873:(PDF) 852:(PDF) 835:(PDF) 828:(PDF) 809:(PDF) 802:(PDF) 785:(PDF) 778:(PDF) 362:lot. 157:: 102 971:2020 723:ISBN 646:ISBN 484:and 432:The 365:The 264:MBTA 226:2030 155:SRTA 530:CSX 490:CSX 186:Yes 1076:: 1037:. 936:. 897:. 854:. 668:. 628:^ 600:. 588:^ 564:^ 392:79 129:1 71:, 973:. 731:. 654:. 460:( 452:( 390:/ 199:8 141:2 20:)

Index

Assonet station
End view of a high-level railway platform
Assonet
Freetown, Massachusetts
41°46′21.55″N 71°5′37.28″W / 41.7726528°N 71.0936889°W / 41.7726528; -71.0936889
Fall River Secondary
side platform
SRTA

MBTA
East Taunton
South Station
South Coast Rail
Fall River
MBTA Commuter Rail
Assonet
Freetown, Massachusetts
South Coast Rail
Fall River Secondary
park and ride
Fall River Railroad
Assonet
Freetown
Massachusetts Route 24
79
side platform
Fall River Secondary
park and ride
kiss-and-ride
A black-and-white postcard of a one-story wooden railway station

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.