34: 62: 521: 833: 493: 507: 69: 41: 402:, Voest, ANDRITZ and Technit. In 1993, construction on the dam was complete and its power plant was operational August of the next year. The dam was inaugurated on 21 July 1993 and its total cost was USA$ 967 million. Approximately 3,000 people were displaced and resettled by the construction of both dams in the Mexico Hydroelectric Development Project. 410:
The Aguamilpa Dam is a 187 m (614 ft) tall and 660 m (2,165 ft) long concrete-face rock-fill dam containing 14,000,000 m (18,311,309 cu yd) of fill. The dam sits at the head of a 73,800 km (28,494 sq mi)
389:
and USD$ 250 million was invested by several foreign governments. A USD$ 460 million World Bank loan was approved on 8 June 1989 and covered the Hydroelectric Development Project in Mexico which included the Aguamilpa Dam and the
377:
power generation and it supplies a 960 MW power station with water. Construction on the dam began in 1989 and it was completed in 1993 while the power station became operational in 1994.
479:) and serves as a regulatory dam to control releases from Aguamilpa. A second phase of the project has yet to be built which includes the installation of two more 320 MW generators. 766: 584: 842: 806: 423:). Controlling the dam's spillway are six 19 m (62 ft) high and 12 m (39 ft) wide radial gates and water is released into the power station's 718: 908: 837: 883: 438: 898: 913: 799: 614: 122: 197: 792: 903: 888: 663: 398:
and San Rafael Dam downstream. The dam was constructed by a consortium of engineering companies which included Hydroenergo,
722: 636: 33: 61: 536: 893: 601:
The US$ 460 million Bank loan financed four project components: the Aguamilpa and Zimapan hydroelectric plants
419:
with a 127 km (49 sq mi) surface area and a capacity of 6,950,000,000 m (5,634,457 
299: 819: 693: 358: 784: 435:
for a total installed capacity of 960 MW. Downstream of the Aguamilpa Dam is the San Rafael Dam at
852: 878: 769:(in Spanish). Nayarit - National Water Commission - Ministry of Environment and Natural Resources 526: 637:"Federal Electricity Commission Inaugurates Aguamilpa Hydroelectric Complex in Western Mexico" 395: 8: 559: 815: 432: 325: 110: 639:. SourceMex Economic News & Analysis on Mexico. 3 August 1994. Archived from 428: 318: 640: 412: 354: 335: 268: 744: 585:"Implementation Completion Report Hydroelectric Development Project in Mexico" 391: 872: 498: 454: 440: 374: 362: 309: 137: 124: 847: 512: 588: 386: 691: 476: 420: 416: 260: 814: 520: 424: 315: 394:. Also included in the Aguamilpa Dam project was the power plant, 506: 399: 366: 427:
via three roller gates. The power station contains three 320 MW
385:
Funding for the project was supplied by the Mexican Government,
832: 475:
which has a storage capacity of 54,000,000 m (43,779 
209: 100: 370: 694:"Water Quality Model For El Cajon and Aguamilpa Reservoirs" 692:
Edith G. Lugo; Rushit Hila; Oliver Obregon (April 2008).
554: 552: 341: 549: 48:
Location of Aguamilpa Dam within the State of Nayarit
615:"Hydroelectric dams, Aguamilpa Chicoazen and Drawer" 488: 870: 246:14,000,000 m (18,311,309 cu yd) 800: 807: 793: 909:Energy infrastructure completed in 1994 671:The World Bank Participation Sourcebook 617:(in Spanish). University of Guadalajara 369:, 38 km (24 mi) northeast of 273:73,800 km (28,494 sq mi) 76:Location of Aguamilpa Dam within Mexico 884:Hydroelectric power stations in Mexico 871: 745:"Hydroelectric Power Plants in Mexico" 661: 788: 579: 577: 259:6,950,000,000 m (5,634,457  68: 40: 373:. The primary purpose of the dam is 914:Buildings and structures in Nayarit 214:Embankment, concrete-face rock-fill 13: 899:Dams on the Río Grande de Santiago 612: 574: 14: 925: 831: 537:List of power stations in Mexico 519: 505: 491: 281:127 km (49 sq mi) 67: 60: 39: 32: 759: 737: 711: 685: 664:"Mexico Hydroelectric Project" 655: 629: 606: 198:Federal Electricity Commission 1: 904:1994 establishments in Mexico 542: 380: 889:Concrete-face rock-fill dams 235:Elevation at crest 7: 482: 10: 930: 699:. Brigham Young University 230:660 m (2,165 ft) 826: 721:. ANDRITZ. Archived from 560:"Lake Profile: Aguamilpa" 405: 334: 324: 308: 298: 290: 285: 277: 267: 255: 250: 242: 234: 226: 218: 208: 203: 193: 185: 177: 169: 161: 153: 116: 106: 96: 88: 26: 21: 16:Dam in Tepic Municipality 238:260 m (853 ft) 222:187 m (614 ft) 527:Renewable energy portal 326:Installed capacity 170:Construction began 894:Dams completed in 1993 820:Río Grande de Santiago 455:21.78028°N 104.88750°W 359:Río Grande de Santiago 336:Annual generation 186:Construction cost 138:21.83944°N 104.80278°W 210:Type of dam 725:on 29 September 2011 460:21.78028; -104.88750 291:Commission date 143:21.83944; -104.80278 767:"Nayarit Watershed" 662:Guggenheim, Scott. 450: /  269:Catchment area 256:Total capacity 134: /  51:Show map of Nayarit 816:Hydroelectric dams 643:on 6 November 2012 111:Tepic Municipality 79:Show map of Mexico 866: 865: 347: 346: 278:Surface area 204:Dam and spillways 178:Opening date 921: 836: 835: 809: 802: 795: 786: 785: 779: 778: 776: 774: 763: 757: 756: 754: 752: 741: 735: 734: 732: 730: 715: 709: 708: 706: 704: 698: 689: 683: 682: 680: 678: 668: 659: 653: 652: 650: 648: 633: 627: 626: 624: 622: 610: 604: 603: 598: 596: 581: 572: 571: 569: 567: 556: 529: 524: 523: 515: 510: 509: 501: 496: 495: 494: 474: 473: 471: 470: 469: 467: 462: 461: 456: 451: 448: 447: 446: 443: 189:USD$ 967 million 149: 148: 146: 145: 144: 139: 135: 132: 131: 130: 127: 80: 71: 70: 64: 52: 43: 42: 36: 19: 18: 929: 928: 924: 923: 922: 920: 919: 918: 869: 868: 867: 862: 830: 822: 813: 783: 782: 772: 770: 765: 764: 760: 750: 748: 743: 742: 738: 728: 726: 717: 716: 712: 702: 700: 696: 690: 686: 676: 674: 666: 660: 656: 646: 644: 635: 634: 630: 620: 618: 611: 607: 594: 592: 583: 582: 575: 565: 563: 558: 557: 550: 545: 533: 532: 525: 518: 511: 504: 497: 492: 490: 485: 465: 463: 459: 457: 453: 452: 449: 444: 441: 439: 437: 436: 429:Francis turbine 408: 383: 243:Dam volume 142: 140: 136: 133: 128: 125: 123: 121: 120: 92:Presa Aguamilpa 84: 83: 82: 81: 78: 77: 74: 73: 72: 55: 54: 53: 50: 49: 46: 45: 44: 17: 12: 11: 5: 927: 917: 916: 911: 906: 901: 896: 891: 886: 881: 879:Dams in Mexico 864: 863: 861: 860: 855: 850: 845: 840: 827: 824: 823: 812: 811: 804: 797: 789: 781: 780: 758: 736: 710: 684: 654: 628: 613:Aceves, Jose. 605: 591:. 27 June 1997 573: 547: 546: 544: 541: 540: 539: 531: 530: 516: 502: 487: 486: 484: 481: 466:San Rafael Dam 415:and creates a 413:catchment area 407: 404: 382: 379: 355:embankment dam 345: 344: 338: 332: 331: 328: 322: 321: 312: 306: 305: 302: 296: 295: 292: 288: 287: 283: 282: 279: 275: 274: 271: 265: 264: 257: 253: 252: 248: 247: 244: 240: 239: 236: 232: 231: 228: 224: 223: 220: 216: 215: 212: 206: 205: 201: 200: 195: 191: 190: 187: 183: 182: 179: 175: 174: 171: 167: 166: 163: 159: 158: 155: 151: 150: 118: 114: 113: 108: 104: 103: 98: 94: 93: 90: 86: 85: 75: 66: 65: 59: 58: 57: 56: 47: 38: 37: 31: 30: 29: 28: 27: 24: 23: 15: 9: 6: 4: 3: 2: 926: 915: 912: 910: 907: 905: 902: 900: 897: 895: 892: 890: 887: 885: 882: 880: 877: 876: 874: 859: 856: 854: 851: 849: 846: 844: 841: 839: 834: 829: 828: 825: 821: 817: 810: 805: 803: 798: 796: 791: 790: 787: 768: 762: 747:. IndustCards 746: 740: 724: 720: 714: 695: 688: 672: 665: 658: 642: 638: 632: 616: 609: 602: 590: 586: 580: 578: 561: 555: 553: 548: 538: 535: 534: 528: 522: 517: 514: 508: 503: 500: 499:Mexico portal 489: 480: 478: 472: 434: 430: 426: 422: 418: 414: 403: 401: 397: 393: 388: 378: 376: 375:hydroelectric 372: 368: 364: 363:Mexican state 360: 356: 352: 351:Aguamilpa Dam 343: 339: 337: 333: 329: 327: 323: 320: 317: 313: 311: 307: 303: 301: 297: 293: 289: 286:Power Station 284: 280: 276: 272: 270: 266: 262: 258: 254: 249: 245: 241: 237: 233: 229: 225: 221: 217: 213: 211: 207: 202: 199: 196: 192: 188: 184: 180: 176: 172: 168: 164: 160: 156: 152: 147: 119: 115: 112: 109: 105: 102: 99: 95: 91: 89:Official name 87: 63: 35: 25: 22:Aguamilpa Dam 20: 857: 771:. Retrieved 761: 749:. Retrieved 739: 727:. Retrieved 723:the original 713: 701:. Retrieved 687: 675:. Retrieved 673:. p. 68 670: 657: 645:. Retrieved 641:the original 631: 619:. Retrieved 608: 600: 593:. Retrieved 564:. Retrieved 513:Water portal 409: 384: 350: 348: 319:Francis-type 304:Conventional 719:"Aguamilpa" 458: / 445:104°53′15″W 396:substations 392:Zimapán Dam 165:Operational 141: / 129:104°48′10″W 117:Coordinates 873:Categories 843:Santa Rosa 838:San Rafael 589:World Bank 543:References 464: ( 442:21°46′49″N 433:generators 387:World Bank 381:Background 126:21°50′22″N 858:Aguamilpa 562:. LakeNet 425:penstocks 417:reservoir 251:Reservoir 853:El Cajón 848:La Yesca 483:See also 314:3 x 320 310:Turbines 194:Owner(s) 107:Location 818:on the 773:21 June 751:21 June 729:21 June 703:21 June 677:21 June 647:21 June 621:21 June 595:21 June 566:21 June 477:acre⋅ft 421:acre⋅ft 400:Siemens 367:Nayarit 361:in the 357:on the 261:acre⋅ft 154:Purpose 97:Country 406:Design 353:is an 340:2,131 330:960 MW 227:Length 219:Height 162:Status 101:Mexico 697:(PDF) 667:(PDF) 371:Tepic 157:Power 775:2011 753:2011 731:2011 705:2011 679:2011 649:2011 623:2011 597:2011 568:2011 349:The 300:Type 294:1994 181:1993 173:1989 365:of 342:GWh 875:: 669:. 599:. 587:. 576:^ 551:^ 316:MW 808:e 801:t 794:v 777:. 755:. 733:. 707:. 681:. 651:. 625:. 570:. 468:) 431:- 263:)

Index

Aguamilpa Dam is located in Nayarit
Aguamilpa Dam is located in Mexico
Mexico
Tepic Municipality
21°50′22″N 104°48′10″W / 21.83944°N 104.80278°W / 21.83944; -104.80278
Federal Electricity Commission
Type of dam
acre⋅ft
Catchment area
Type
Turbines
MW
Francis-type
Installed capacity
Annual generation
GWh
embankment dam
Río Grande de Santiago
Mexican state
Nayarit
Tepic
hydroelectric
World Bank
Zimapán Dam
substations
Siemens
catchment area
reservoir
acre⋅ft
penstocks