late due to its slowpoke contractor. The project’s civil contractor Sino Hydro has completed 100 percent of the construction, and there has been full progress in the installation of the turbine, water gate and transmission lines to evacuate the electricity generated by the plant. It will use the tailwaters of Kulekhani II and have an installed capacity of 14 MW.
619:
Construction of the Kulekhani III Hydropower Station had been underway since 2008 and is now finally complete as of 2019. The Nepal Electricity Authority (NEA) had extended the completion deadline of the Kulekhani 3 Hydropower Project for the fifth time to January 2018 as construction was running
573:
From the reservoir, water is sent to the Kulekhani I Hydropower Station via a 5.8 km (3.6 mi) headrace tunnel to a gate house which controls the flow of water to the power station. From the gate house water travels down a 1,340 m (4,400 ft) long
772: 598:
Water discharged from the Kulekhani I power station enters a series of tunnels and diversions where it reaches the Kulekhani II Hydropower Station which is also located underground and contains two 16 MW
603:-generators. The elevation difference between the reservoir and the power station affords a net hydraulic head of 284.1 m (932 ft). The dam and reservoir are in the 709: 534:
Hydropower Stations. Construction began in 1977 and Kulekhani I was commissioned in 1982. Kulekhani II was commissioned in 1986 and a third power station, the 14 MW
684: 776: 930: 643: 538:
was expected to be commissioned in May 2015 but was delayed due to issues with the builder. The US$ 117.84 million project received funding from the
925: 920: 116: 900: 354: 631: 935: 945: 940: 55: 950: 685:"Climate Change Impacts on Reservoir based Hydropower Generation in Nepal: A case study of Kulekhani Hydropower Plant" 848: 910: 500: 96: 758: 915: 875: 773:"Kulekhani III Hydroelectric Project : Construction Supervision and Construction Management (14 MW)" 555: 201: 870: 655: 398: 905: 579: 865: 690:. School of Environmental Management and Sustainable Development Pokhara University. pp. 15–17 586:-generators. The difference in elevation between the reservoir and the power station affords a net 834: 895: 8: 504: 448: 100: 860: 608: 508: 104: 600: 492: 226: 734: 587: 583: 464: 408: 310: 649:
Fishing nets and a lonely fisherman's station at Indrasarovar lake, Kulekhani.
889: 604: 516: 488: 422: 369: 356: 131: 118: 820: 806: 441: 436: 543: 431: 539: 551: 496: 92: 851: 828: 575: 520: 428: 31: 814: 561:
The 114 m (374 ft) tall dam creates a reservoir called
38: 637:
Group of fishermen with their boats by the Kulekhani reservoir.
565:
which stores 85,300,000 m (69,200 acre⋅ft) of water.
213: 512: 82: 42:
Kulekhani dam also known as "Indra sarobar", Makwanpur, Nepal
547: 710:"Nepal u Appraisal of the Kulekhani Hydroelectric Project" 796: 775:. Total Management Services Pvt. Ltd. Archived from 614: 16:
Dam in Kulekhani, Makwanpur District, Narayani Zone
593: 568: 887: 473:Kulekhani III: 40.85 GWh (commissioned in 2019) 931:Buildings and structures in Makwanpur District 759:"Kulekhani 3 deadline extended for fifth time" 417:Kulekhani III: 102.56 m (336.5 ft) 268:4,400,000 m (5,800,000 cu yd) 62: 19:Dam in Makwanpur District, Bagmati Province 607:basin while the power stations are in the 30: 550:, Overseas Economic Cooperation Fund and 519:power generation and it supports the 60 415:Kulekhani II: 284.1 m (932 ft) 70:Location of Kulekhani Reservoir in Nepal 37: 926:Energy infrastructure completed in 1986 921:Energy infrastructure completed in 1982 735:"Kulekhani III begins power generation" 678: 676: 413:Kulekhani I: 550 m (1,800 ft) 297:73,300,000 m (59,400 acre⋅ft) 289:85,300,000 m (69,200 acre⋅ft) 888: 682: 305:12,000,000 m (9,700 acre⋅ft) 901:Hydroelectric power stations in Nepal 673: 515:. The primary purpose of the dam is 281:Kulekhani Reservoir (Indra Sarobar) 13: 323:2.2 km (0.85 sq mi) 14: 962: 827: 813: 799: 654: 642: 630: 615:Kulekhani III hydropower station 590:of 550 m (1,800 ft). 315:126 km (49 sq mi) 61: 54: 936:Indrasarowar Rural Municipality 594:Kulekhani II hydropower station 501:Indrasarowar Rural Municipality 97:Indrasarowar Rural Municipality 765: 751: 727: 715:. World Bank. 25 November 1975 702: 569:Kulekhani I hydropower station 344:Kulekhani-I Hydropower Station 1: 666: 36:The reservoir, Indra Sarobar 946:1982 establishments in Nepal 339:1,530 m (5,020 ft) 252:1,534 m (5,033 ft) 249:Elevation at crest 7: 876:GPX (secondary coordinates) 556:Nepal Electricity Authority 457:Kulekhani III: 14 MW (est.) 202:Nepal Electricity Authority 177:; 42 years ago 10: 967: 941:Underground power stations 623: 244:397 m (1,302 ft) 951:Artificial lakes of Nepal 871:GPX (primary coordinates) 846:Map all coordinates using 580:underground power station 477: 463: 447: 421: 407: 397: 385: 370:27.5402250°N 85.1135611°E 348: 343: 335: 327: 319: 309: 301: 293: 285: 277: 272: 264: 256: 248: 240: 232: 222: 212: 207: 197: 189: 171: 163: 155: 147: 110: 88: 78: 49: 29: 24: 854:Download coordinates as: 683:Dhakal, Manjeet (2011). 582:. It contains two 30 MW 440:Kulekhani III: 2 x 7 MW 435:Kulekhani II: 2 x 16 MW 236:114 m (374 ft) 835:Renewable energy portal 471:Kulekhani II: 104.6 GWh 449:Installed capacity 403:Conventional, diversion 331:7 km (4.3 mi) 164:Construction began 911:Dams completed in 1982 465:Annual generation 375:27.5402250; 85.1135611 302:Inactive capacity 260:10 m (33 ft) 190:Construction cost 43: 866:GPX (all coordinates) 661:Wall of Kulekhani dam 578:where it reaches the 336:Normal elevation 218:Embankment, rock-fill 214:Type of dam 132:27.59028°N 85.15583°E 41: 469:Kulekhani I: 211 GWh 427:Kulekhani I: 2 x 30 386:Commission date 294:Active capacity 916:Interbasin transfer 455:Kulekhani II: 32 MW 393:Kulekhani III: 2019 366: /  328:Maximum length 311:Catchment area 286:Total capacity 128: /  25:Kulekhani Reservoir 761:. 11 October 2017. 505:Makwanpur District 453:Kulekhani I: 60 MW 391:Kulekhani II: 1986 257:Width (crest) 193:US$ 117.84 million 137:27.59028; 85.15583 101:Makwanpur District 44: 554:. It is owned by 481: 480: 389:Kulekhani I: 1982 320:Surface area 208:Dam and spillways 172:Opening date 958: 906:Rock-filled dams 837: 832: 831: 823: 818: 817: 809: 804: 803: 802: 789: 788: 786: 784: 769: 763: 762: 755: 749: 748: 746: 745: 731: 725: 724: 722: 720: 714: 706: 700: 699: 697: 695: 689: 680: 658: 646: 634: 509:Bagmati Province 381: 380: 378: 377: 376: 371: 367: 364: 363: 362: 359: 185: 183: 178: 143: 142: 140: 139: 138: 133: 129: 126: 125: 124: 121: 105:Bagmati Province 65: 64: 58: 34: 22: 21: 966: 965: 961: 960: 959: 957: 956: 955: 886: 885: 884: 883: 882: 881: 880: 841: 840: 833: 826: 819: 812: 805: 800: 798: 793: 792: 782: 780: 779:on 2 April 2015 771: 770: 766: 757: 756: 752: 743: 741: 733: 732: 728: 718: 716: 712: 708: 707: 703: 693: 691: 687: 681: 674: 669: 662: 659: 650: 647: 638: 635: 626: 617: 601:Francis turbine 596: 571: 493:Kulekhani River 472: 470: 458: 456: 454: 439: 434: 416: 414: 392: 390: 374: 372: 368: 365: 360: 357: 355: 353: 352: 265:Dam volume 227:Kulekhani River 181: 179: 176: 136: 134: 130: 127: 122: 119: 117: 115: 114: 74: 73: 72: 71: 68: 67: 66: 45: 20: 17: 12: 11: 5: 964: 954: 953: 948: 943: 938: 933: 928: 923: 918: 913: 908: 903: 898: 879: 878: 873: 868: 863: 857: 844: 843: 842: 839: 838: 824: 810: 795: 794: 791: 790: 764: 750: 726: 701: 671: 670: 668: 665: 664: 663: 660: 653: 651: 648: 641: 639: 636: 629: 625: 622: 616: 613: 595: 592: 588:hydraulic head 584:Pelton turbine 570: 567: 479: 478: 475: 474: 467: 461: 460: 451: 445: 444: 425: 419: 418: 411: 409:Hydraulic head 405: 404: 401: 395: 394: 387: 383: 382: 350: 346: 345: 341: 340: 337: 333: 332: 329: 325: 324: 321: 317: 316: 313: 307: 306: 303: 299: 298: 295: 291: 290: 287: 283: 282: 279: 275: 274: 270: 269: 266: 262: 261: 258: 254: 253: 250: 246: 245: 242: 238: 237: 234: 230: 229: 224: 220: 219: 216: 210: 209: 205: 204: 199: 195: 194: 191: 187: 186: 173: 169: 168: 165: 161: 160: 157: 153: 152: 149: 145: 144: 112: 108: 107: 90: 86: 85: 80: 76: 75: 69: 60: 59: 53: 52: 51: 50: 47: 46: 35: 27: 26: 18: 15: 9: 6: 4: 3: 2: 963: 952: 949: 947: 944: 942: 939: 937: 934: 932: 929: 927: 924: 922: 919: 917: 914: 912: 909: 907: 904: 902: 899: 897: 896:Dams in Nepal 894: 893: 891: 877: 874: 872: 869: 867: 864: 862: 859: 858: 856: 855: 850: 849:OpenStreetMap 847: 836: 830: 825: 822: 816: 811: 808: 797: 778: 774: 768: 760: 754: 740: 736: 730: 711: 705: 686: 679: 677: 672: 657: 652: 645: 640: 633: 628: 627: 621: 612: 610: 606: 605:Bagmati River 602: 591: 589: 585: 581: 577: 566: 564: 563:Indra Sarobar 559: 557: 553: 549: 545: 541: 537: 536:Kulekhani III 533: 532:Kulekhani III 529: 525: 522: 518: 517:hydroelectric 514: 510: 506: 502: 498: 494: 490: 489:rock-fill dam 486: 485:Kulekhani Dam 476: 468: 466: 462: 459:Total: 106 MW 452: 450: 446: 443: 438: 433: 430: 426: 424: 420: 412: 410: 406: 402: 400: 396: 388: 384: 379: 358:27°32′24.81″N 351: 347: 342: 338: 334: 330: 326: 322: 318: 314: 312: 308: 304: 300: 296: 292: 288: 284: 280: 276: 271: 267: 263: 259: 255: 251: 247: 243: 239: 235: 231: 228: 225: 221: 217: 215: 211: 206: 203: 200: 196: 192: 188: 174: 170: 166: 162: 158: 154: 150: 146: 141: 113: 109: 106: 102: 98: 94: 91: 87: 84: 81: 77: 57: 48: 40: 33: 28: 23: 853: 852: 845: 821:Water portal 807:Nepal portal 781:. Retrieved 777:the original 767: 753: 742:. Retrieved 738: 729: 717:. Retrieved 704: 692:. Retrieved 618: 597: 572: 562: 560: 535: 531: 528:Kulekhani II 527: 523: 484: 482: 442:Francis-type 437:Francis-type 361:85°6′48.82″E 609:Rapti River 544:Kuwait Fund 524:Kulekhani I 432:Pelton-type 373: / 349:Coordinates 159:Operational 135: / 111:Coordinates 890:Categories 744:2021-08-31 667:References 540:World Bank 530:and 14 MW 120:27°35′25″N 739:Khabarhub 552:OPEC Fund 497:Kulekhani 273:Reservoir 123:85°9′21″E 93:Kulekhani 576:penstock 526:, 32 MW 423:Turbines 223:Impounds 198:Owner(s) 89:Location 783:1 March 719:1 March 694:1 March 624:Gallery 611:basin. 499:in the 491:on the 278:Creates 180: ( 148:Purpose 79:Country 241:Length 233:Height 156:Status 713:(PDF) 688:(PDF) 513:Nepal 495:near 487:is a 151:Power 83:Nepal 785:2015 721:2015 696:2015 548:UNDP 483:The 399:Type 182:1982 175:1982 167:1977 861:KML 507:in 503:of 892:: 737:. 675:^ 558:. 546:, 542:, 521:MW 511:, 429:MW 103:, 99:, 95:, 787:. 747:. 723:. 698:. 184:)

Index



Kulekhani Reservoir is located in Nepal
Nepal
Kulekhani
Indrasarowar Rural Municipality
Makwanpur District
Bagmati Province
27°35′25″N 85°9′21″E / 27.59028°N 85.15583°E / 27.59028; 85.15583
Nepal Electricity Authority
Type of dam
Kulekhani River
Catchment area
27°32′24.81″N 85°6′48.82″E / 27.5402250°N 85.1135611°E / 27.5402250; 85.1135611
Type
Hydraulic head
Turbines
MW
Pelton-type
Francis-type
Francis-type
Installed capacity
Annual generation
rock-fill dam
Kulekhani River
Kulekhani
Indrasarowar Rural Municipality
Makwanpur District
Bagmati Province
Nepal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.