late due to its slowpoke contractor. The project’s civil contractor Sino Hydro has completed 100 percent of the construction, and there has been full progress in the installation of the turbine, water gate and transmission lines to evacuate the electricity generated by the plant. It will use the tailwaters of Kulekhani II and have an installed capacity of 14 MW.
630:
Construction of the Kulekhani III Hydropower Station had been underway since 2008 and is now finally complete as of 2019. The Nepal Electricity Authority (NEA) had extended the completion deadline of the Kulekhani 3 Hydropower Project for the fifth time to January 2018 as construction was running
584:
From the reservoir, water is sent to the Kulekhani I Hydropower Station via a 5.8 km (3.6 mi) headrace tunnel to a gate house which controls the flow of water to the power station. From the gate house water travels down a 1,340 m (4,400 ft) long
783: 609:
Water discharged from the Kulekhani I power station enters a series of tunnels and diversions where it reaches the Kulekhani II Hydropower Station which is also located underground and contains two 16 MW
614:-generators. The elevation difference between the reservoir and the power station affords a net hydraulic head of 284.1 m (932 ft). The dam and reservoir are in the 720: 545:
Hydropower Stations. Construction began in 1977 and Kulekhani I was commissioned in 1982. Kulekhani II was commissioned in 1986 and a third power station, the 14 MW
695: 787: 941: 654: 549:
was expected to be commissioned in May 2015 but was delayed due to issues with the builder. The US$ 117.84 million project received funding from the
936: 931: 127: 911: 365: 642: 946: 956: 951: 66: 961: 696:"Climate Change Impacts on Reservoir based Hydropower Generation in Nepal: A case study of Kulekhani Hydropower Plant" 859: 921: 511: 107: 769: 17: 926: 886: 784:"Kulekhani III Hydroelectric Project : Construction Supervision and Construction Management (14 MW)" 566: 212: 881: 666: 409: 916: 590: 876: 701:. School of Environmental Management and Sustainable Development Pokhara University. pp. 15–17 597:-generators. The difference in elevation between the reservoir and the power station affords a net 845: 906: 8: 515: 459: 111: 871: 619: 519: 115: 611: 503: 237: 745: 598: 594: 475: 419: 321: 660:
Fishing nets and a lonely fisherman's station at Indrasarovar lake, Kulekhani.
900: 615: 527: 499: 433: 380: 367: 142: 129: 831: 817: 452: 447: 554: 442: 550: 562: 507: 103: 862: 839: 586: 531: 439: 42: 825: 572:
The 114 m (374 ft) tall dam creates a reservoir called
49: 648:
Group of fishermen with their boats by the Kulekhani reservoir.
576:
which stores 85,300,000 m (69,200 acre⋅ft) of water.
224: 523: 93: 53:
Kulekhani dam also known as "Indra sarobar", Makwanpur, Nepal
558: 721:"Nepal u Appraisal of the Kulekhani Hydroelectric Project" 807: 786:. Total Management Services Pvt. Ltd. Archived from 625: 27:
Dam in Kulekhani, Makwanpur District, Narayani Zone
604: 579: 898: 484:Kulekhani III: 40.85 GWh (commissioned in 2019) 942:Buildings and structures in Makwanpur District 770:"Kulekhani 3 deadline extended for fifth time" 428:Kulekhani III: 102.56 m (336.5 ft) 279:4,400,000 m (5,800,000 cu yd) 73: 30:Dam in Makwanpur District, Bagmati Province 618:basin while the power stations are in the 41: 561:, Overseas Economic Cooperation Fund and 530:power generation and it supports the 60 426:Kulekhani II: 284.1 m (932 ft) 81:Location of Kulekhani Reservoir in Nepal 48: 937:Energy infrastructure completed in 1986 932:Energy infrastructure completed in 1982 746:"Kulekhani III begins power generation" 689: 687: 424:Kulekhani I: 550 m (1,800 ft) 308:73,300,000 m (59,400 acre⋅ft) 300:85,300,000 m (69,200 acre⋅ft) 14: 899: 693: 316:12,000,000 m (9,700 acre⋅ft) 912:Hydroelectric power stations in Nepal 684: 526:. The primary purpose of the dam is 292:Kulekhani Reservoir (Indra Sarobar) 24: 334:2.2 km (0.85 sq mi) 25: 973: 838: 824: 810: 665: 653: 641: 626:Kulekhani III hydropower station 601:of 550 m (1,800 ft). 326:126 km (49 sq mi) 72: 65: 947:Indrasarowar Rural Municipality 605:Kulekhani II hydropower station 512:Indrasarowar Rural Municipality 108:Indrasarowar Rural Municipality 776: 762: 738: 726:. World Bank. 25 November 1975 713: 580:Kulekhani I hydropower station 355:Kulekhani-I Hydropower Station 13: 1: 677: 47:The reservoir, Indra Sarobar 957:1982 establishments in Nepal 350:1,530 m (5,020 ft) 263:1,534 m (5,033 ft) 260:Elevation at crest 7: 887:GPX (secondary coordinates) 567:Nepal Electricity Authority 468:Kulekhani III: 14 MW (est.) 213:Nepal Electricity Authority 188:; 42 years ago 10: 978: 952:Underground power stations 634: 255:397 m (1,302 ft) 962:Artificial lakes of Nepal 882:GPX (primary coordinates) 857:Map all coordinates using 591:underground power station 488: 474: 458: 432: 418: 408: 396: 381:27.5402250°N 85.1135611°E 359: 354: 346: 338: 330: 320: 312: 304: 296: 288: 283: 275: 267: 259: 251: 243: 233: 223: 218: 208: 200: 182: 174: 166: 158: 121: 99: 89: 60: 40: 35: 865:Download coordinates as: 694:Dhakal, Manjeet (2011). 593:. It contains two 30 MW 451:Kulekhani III: 2 x 7 MW 446:Kulekhani II: 2 x 16 MW 247:114 m (374 ft) 846:Renewable energy portal 482:Kulekhani II: 104.6 GWh 460:Installed capacity 414:Conventional, diversion 342:7 km (4.3 mi) 175:Construction began 922:Dams completed in 1982 476:Annual generation 386:27.5402250; 85.1135611 313:Inactive capacity 271:10 m (33 ft) 201:Construction cost 54: 877:GPX (all coordinates) 672:Wall of Kulekhani dam 589:where it reaches the 347:Normal elevation 229:Embankment, rock-fill 225:Type of dam 143:27.59028°N 85.15583°E 52: 480:Kulekhani I: 211 GWh 438:Kulekhani I: 2 x 30 397:Commission date 305:Active capacity 927:Interbasin transfer 466:Kulekhani II: 32 MW 404:Kulekhani III: 2019 377: /  339:Maximum length 322:Catchment area 297:Total capacity 139: /  36:Kulekhani Reservoir 772:. 11 October 2017. 516:Makwanpur District 464:Kulekhani I: 60 MW 402:Kulekhani II: 1986 268:Width (crest) 204:US$ 117.84 million 148:27.59028; 85.15583 112:Makwanpur District 55: 565:. It is owned by 492: 491: 400:Kulekhani I: 1982 331:Surface area 219:Dam and spillways 183:Opening date 16:(Redirected from 969: 917:Rock-filled dams 848: 843: 842: 834: 829: 828: 820: 815: 814: 813: 800: 799: 797: 795: 780: 774: 773: 766: 760: 759: 757: 756: 742: 736: 735: 733: 731: 725: 717: 711: 710: 708: 706: 700: 691: 669: 657: 645: 520:Bagmati Province 392: 391: 389: 388: 387: 382: 378: 375: 374: 373: 370: 196: 194: 189: 154: 153: 151: 150: 149: 144: 140: 137: 136: 135: 132: 116:Bagmati Province 76: 75: 69: 45: 33: 32: 21: 977: 976: 972: 971: 970: 968: 967: 966: 897: 896: 895: 894: 893: 892: 891: 852: 851: 844: 837: 830: 823: 816: 811: 809: 804: 803: 793: 791: 790:on 2 April 2015 782: 781: 777: 768: 767: 763: 754: 752: 744: 743: 739: 729: 727: 723: 719: 718: 714: 704: 702: 698: 692: 685: 680: 673: 670: 661: 658: 649: 646: 637: 628: 612:Francis turbine 607: 582: 504:Kulekhani River 483: 481: 469: 467: 465: 450: 445: 427: 425: 403: 401: 385: 383: 379: 376: 371: 368: 366: 364: 363: 276:Dam volume 238:Kulekhani River 192: 190: 187: 147: 145: 141: 138: 133: 130: 128: 126: 125: 85: 84: 83: 82: 79: 78: 77: 56: 31: 28: 23: 22: 15: 12: 11: 5: 975: 965: 964: 959: 954: 949: 944: 939: 934: 929: 924: 919: 914: 909: 890: 889: 884: 879: 874: 868: 855: 854: 853: 850: 849: 835: 821: 806: 805: 802: 801: 775: 761: 737: 712: 682: 681: 679: 676: 675: 674: 671: 664: 662: 659: 652: 650: 647: 640: 636: 633: 627: 624: 606: 603: 599:hydraulic head 595:Pelton turbine 581: 578: 490: 489: 486: 485: 478: 472: 471: 462: 456: 455: 436: 430: 429: 422: 420:Hydraulic head 416: 415: 412: 406: 405: 398: 394: 393: 361: 357: 356: 352: 351: 348: 344: 343: 340: 336: 335: 332: 328: 327: 324: 318: 317: 314: 310: 309: 306: 302: 301: 298: 294: 293: 290: 286: 285: 281: 280: 277: 273: 272: 269: 265: 264: 261: 257: 256: 253: 249: 248: 245: 241: 240: 235: 231: 230: 227: 221: 220: 216: 215: 210: 206: 205: 202: 198: 197: 184: 180: 179: 176: 172: 171: 168: 164: 163: 160: 156: 155: 123: 119: 118: 101: 97: 96: 91: 87: 86: 80: 71: 70: 64: 63: 62: 61: 58: 57: 46: 38: 37: 29: 26: 9: 6: 4: 3: 2: 974: 963: 960: 958: 955: 953: 950: 948: 945: 943: 940: 938: 935: 933: 930: 928: 925: 923: 920: 918: 915: 913: 910: 908: 907:Dams in Nepal 905: 904: 902: 888: 885: 883: 880: 878: 875: 873: 870: 869: 867: 866: 861: 860:OpenStreetMap 858: 847: 841: 836: 833: 827: 822: 819: 808: 789: 785: 779: 771: 765: 751: 747: 741: 722: 716: 697: 690: 688: 683: 668: 663: 656: 651: 644: 639: 638: 632: 623: 621: 617: 616:Bagmati River 613: 602: 600: 596: 592: 588: 577: 575: 574:Indra Sarobar 570: 568: 564: 560: 556: 552: 548: 547:Kulekhani III 544: 543:Kulekhani III 540: 536: 533: 529: 528:hydroelectric 525: 521: 517: 513: 509: 505: 501: 500:rock-fill dam 497: 496:Kulekhani Dam 487: 479: 477: 473: 470:Total: 106 MW 463: 461: 457: 454: 449: 444: 441: 437: 435: 431: 423: 421: 417: 413: 411: 407: 399: 395: 390: 369:27°32′24.81″N 362: 358: 353: 349: 345: 341: 337: 333: 329: 325: 323: 319: 315: 311: 307: 303: 299: 295: 291: 287: 282: 278: 274: 270: 266: 262: 258: 254: 250: 246: 242: 239: 236: 232: 228: 226: 222: 217: 214: 211: 207: 203: 199: 185: 181: 177: 173: 169: 165: 161: 157: 152: 124: 120: 117: 113: 109: 105: 102: 98: 95: 92: 88: 68: 59: 51: 44: 39: 34: 19: 18:Kulekhani Dam 864: 863: 856: 832:Water portal 818:Nepal portal 792:. Retrieved 788:the original 778: 764: 753:. Retrieved 749: 740: 728:. Retrieved 715: 703:. Retrieved 629: 608: 583: 573: 571: 546: 542: 539:Kulekhani II 538: 534: 495: 493: 453:Francis-type 448:Francis-type 372:85°6′48.82″E 620:Rapti River 555:Kuwait Fund 535:Kulekhani I 443:Pelton-type 384: / 360:Coordinates 170:Operational 146: / 122:Coordinates 901:Categories 755:2021-08-31 678:References 551:World Bank 541:and 14 MW 131:27°35′25″N 750:Khabarhub 563:OPEC Fund 508:Kulekhani 284:Reservoir 134:85°9′21″E 104:Kulekhani 587:penstock 537:, 32 MW 434:Turbines 234:Impounds 209:Owner(s) 100:Location 794:1 March 730:1 March 705:1 March 635:Gallery 622:basin. 510:in the 502:on the 289:Creates 191: ( 159:Purpose 90:Country 252:Length 244:Height 167:Status 724:(PDF) 699:(PDF) 524:Nepal 506:near 498:is a 162:Power 94:Nepal 796:2015 732:2015 707:2015 559:UNDP 494:The 410:Type 193:1982 186:1982 178:1977 872:KML 518:in 514:of 903:: 748:. 686:^ 569:. 557:, 553:, 532:MW 522:, 440:MW 114:, 110:, 106:, 798:. 758:. 734:. 709:. 195:) 20:)

Index

Kulekhani Dam


Kulekhani Reservoir is located in Nepal
Nepal
Kulekhani
Indrasarowar Rural Municipality
Makwanpur District
Bagmati Province
27°35′25″N 85°9′21″E / 27.59028°N 85.15583°E / 27.59028; 85.15583
Nepal Electricity Authority
Type of dam
Kulekhani River
Catchment area
27°32′24.81″N 85°6′48.82″E / 27.5402250°N 85.1135611°E / 27.5402250; 85.1135611
Type
Hydraulic head
Turbines
MW
Pelton-type
Francis-type
Francis-type
Installed capacity
Annual generation
rock-fill dam
Kulekhani River
Kulekhani
Indrasarowar Rural Municipality
Makwanpur District
Bagmati Province

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.