Knowledge

North Charleston station

Source 📝

577: 282: 164: 154: 1051: 564:
restaurant/retail space and CARTA administration offices. On February 2, 2016, the FTA gave final approval citing no significant impact on the environment. Phase one of construction began on August 24, 2017, with the new building and reconstruction of one-half of the side platform. The North Charleston Intermodal Transportation Center officially opened with early-morning train service on December 13, 2018.
600:, it was built with two separate waiting areas, each with their own sets of restrooms. In the days of segregation, whites used one waiting area and blacks used the other. The second floor housed the ACL freight office for the Charleston division; the office closed when became part of CSX Transportation's Florence division. In 1967, ACL merged with 593:
first and second floors. Red brick and dyed-green concrete panels arranged in alternating horizontal bands emphasize the building's rectilinear lines. Public spaces feature exposed brick on the lower walls and floors of durable green terrazzo; both materials can stand the wear and tear of large crowds and are easy to maintain.
673:
the main entrance. A network of canopies protect travelers from inclement weather as they arrive or depart by car, bus or rail. The steeply pitched, hipped seamed-metal roof has prominent shed dormer windows that, along with numerous other windows at ground level, allow natural light into the facility.
592:
design popular at the time of construction. It is characterized by clean lines and minimal ornamentation. Typical features of the mid-century modern aesthetic found in the Charleston depot include a flat roof, large groupings of windows with horizontal lights, and shallow cantilevered canopies at the
540:
In 2009, Davis & Floyd, Inc. joined the project, providing the architectural design and engineering for the building. The final design was a 32,000-square-foot (3,000 m) two-story double-towered edifice, evoking the architecture style of the Charleston Union Station that existed from 1907 to
672:
The nearly 15,000-square-foot (1,400 m) single-story station is constructed in brown brick and textured concrete masonry units, with stylized pilasters that visually break up the long, horizontal facades. At one end is a tower, while a projecting bay with triangular parapet and clock face marks
541:
1947. The facility was to included leasable space, restaurant/retail space, CARTA administration offices, additional meeting space and operations for Amtrak, CARTA and Southeastern Stages. In 2010, the project qualified for the State of Good Repair Program, providing Federal dollars from the
563:
In 2015, project management and ownership was transferred from CARTA to the city of North Charleston. To keep costs within the $ 14.5 million budget, the new facility was downsized from 32,000 square feet (3,000 m) to 14,217 square feet (1,320.8 m), eliminating the leasable space,
676:
The interior is set up with an entry concourse, Amtrak concourse and passenger concourse through the center connecting CARTA and Southeastern Stages at opposite ends. The floor has light and dark gray diamond pattern and accented with organic stone and wood elements. The facility is fully
626:
as the repositories. An erection of a state historic marker. And salvage one of the exterior green tiles (before or during demolition) and include it and other photographs and information related to the station in the North Charleston Intermodal Transportation Center museum space.
622:, the City of North Charleston and CARTA made an agreement with the South Carolina State Historic Preservation Office (SHPO) that they will provide measured drawings and professional photography of the interior and exterior, to be submitted to SHPO and 552:
Bennett Yard, the company rejected a platform permit without sidetrack. Additional costs related to constructing a sidetrack, so the station would not impede freight rail traffic, made the site no longer cost feasible thus stopping the project.
608:(SCL). In 1971, passenger operations was transferred to Amtrak, while the station remained owned by SCL (later CSX Transportation). In 1972, the city of North Charleston was incorporated. In the 1980s, fencing topped with 524:
Project for the current station began in 1996 with a feasibility study and site selection led by CARTA. The site chosen was a 36-acre (15 ha) tract located on West Montague Avenue, wedged between Dorchester Road and
567:
In 2019, phase two of construction includes the razing of the Atlantic Coast Line depot, reconstructing the remaining half of the side platform, roadway modifications, CARTA bus turnoffs and vehicle parking.
560:
assessments were started as well zoning, permits, redesign and disposal of the Montague Avenue site. Bus tests were conducted on July 29, 2014, to confirm vertical clearance under Sevenmile Viaduct.
615:
On December 13, 2018, all passenger rail service was relocated to the North Charleston Intermodal Transportation Center and the former Atlantic Coast Line/Amtrak station was officially closed.
830: 1237: 1232: 1217: 1105: 769: 69: 428: 1227: 1222: 729: 802: 506: 408: 157: 981: 658:
Amtrak operating hours are at 4:00am–11:45am and at 4:00pm–11:45pm, which includes the ticket counter, passenger assistance and baggage service.
1098: 498: 1212: 557: 879: 1055: 556:
In 2014, CARTA began the process of relocating the project to Gaynor Avenue, adjacent to the existing Amtrak station. new NEPA and
421: 1091: 678: 597: 704: 619: 1176: 773: 1171: 1156: 530: 486: 55: 1141: 526: 433: 907: 795: 542: 482: 757: 605: 585: 398: 1024: 977: 965: 601: 300: 529:. From 1997 to 2007 the project went through a series of refinements, land purchasing and required 1119: 935: 212: 596:
Passenger service was located on the first floor. As the station was built during the height of
335: 112: 681:
compliant and offers additional meeting space and a museum to the Liberty Hill neighborhood.
516:. The street address is 4565 Gaynor Avenue, and is located in the Liberty Hill neighborhood. 510: 322: 835: 859:"BridgeReports.com US 52 over S.C.L. Railroad-Priv. Rd, Charleston County, South Carolina" 654:(overnight train), with the northbound train at 9:17pm and the southbound train at 4:51am. 8: 1186: 908:"North Charleston Intermodal Facility Amtrak Coordination Meeting - Public-Mtg-PPT-71415" 796:"North Charleston Intermodal Facility Amtrak Coordination Meeting - Public-Mtg-PPT-61614" 758:
U.S. Geological Survey Geographic Names Information System: Liberty Hills, South Carolina
645:(daytime train), with the northbound train at 10:00am and the southbound train at 7:19pm. 413: 623: 589: 549: 533:
assessments. With a 2007 groundbreaking, construction began with infrastructure and a
1181: 1068: 317: 1083: 576: 1191: 1073: 641: 330: 309: 295: 1161: 1151: 37: 1166: 1125: 1079:
Charleston, South Carolina Railroad Stations (South Carolina Railroad Stations)
513: 959: 635:
The station is served by two Amtrak routes, for a total of four trains daily:
1206: 650: 534: 490: 344: 123: 84: 71: 502: 1069:
North Charleston, SC – Station history at Great American Stations (Amtrak)
936:"U.S. Department of Transportation Federal Transit Administration - FONSI" 609: 831:"North Charleston to break ground on long-awaited transportation center" 359: 1063: 1003: 216: 941:. Charleston Area Regional Transportation Authority. February 2, 2016 885:. Charleston Area Regional Transportation Authority. August 21, 2014 858: 1078: 913:. Charleston Area Regional Transportation Authority. July 14, 2015 705:"First Look: New North Charleston train and bus station unveiled" 1114: 1050: 1004:"North Charleston, South Carolina Train Station (CHS) - Amtrak" 736: 494: 285: 281: 34: 730:"Amtrak Fact Sheet, Fiscal Year 2023: State of South Carolina" 708: 1074:
Charleston Amtrak Station (USA Rail Guide -- Train Web)
1025:"North Charleston, SC (CHS) - Great American Stations" 978:"North Charleston, SC (CHS) - Great American Stations" 824: 822: 820: 1113: 1017: 1238:
Railway stations in the United States opened in 2018
1233:
Railway stations in the United States opened in 1956
618:
Because the station was eligible for listing on the
817: 770:"North Charleston Intermodal Station Gains Funding" 698: 696: 694: 612:surrounded the station after a rash of burglaries. 1218:Transportation in North Charleston, South Carolina 772:. Great American Stations (Amtrak). Archived from 803:Charleston Area Regional Transportation Authority 507:Charleston Area Regional Transportation Authority 479:North Charleston Intermodal Transportation Center 1204: 722: 691: 548:In 2012, because of the close proximity to the 1099: 580:The former Atlantic Coast Line/Amtrak station 1228:Transportation in Charleston, South Carolina 1223:Former Atlantic Coast Line Railroad stations 880:"Intermodal-Presentation-Liberty-Hill-82114" 661:The station appears in Amtrak timetables as 571: 509:(CARTA) and Southeastern Stages, a regional 902: 900: 1106: 1092: 961:North Charleston's New Intermodal Facility 703:Nestman, Christopher (December 13, 2018). 930: 928: 897: 575: 984:from the original on September 29, 2017 702: 1205: 828: 1087: 925: 397: 279: 163: 153: 980:. Great American Stations (Amtrak). 620:National Register of Historic Places 13: 1027:. Great American Stations (Amtrak) 829:Rindge, Brenda (August 23, 2017). 14: 1249: 1213:Amtrak stations in South Carolina 1043: 1049: 487:North Charleston, South Carolina 280: 162: 152: 56:North Charleston, South Carolina 25:Intermodal Transportation Center 996: 970: 953: 872: 851: 788: 762: 751: 543:Federal Transit Administration 1: 1064:North Charleston, SC – Amtrak 684: 606:Seaboard Coast Line Railroad 399:Atlantic Coast Line Railroad 7: 630: 231:December 13, 2018 10: 1254: 602:Seaboard Air Line Railroad 519: 1134: 667: 572:Atlantic Coast Line depot 467: 460: 456: 452: 448: 402: 394: 379: 375: 371: 353: 316: 289: 276: 272: 267: 263: 259: 251: 247: 242: 227: 222: 208: 203: 195: 187: 179: 174: 145: 137: 129: 118: 108: 100: 63: 49: 44: 33: 18: 1056:North Charleston station 355:     104:City of North Charleston 499:Greater Charleston area 199:Davis & Floyd, Inc. 581: 497:train station for the 113:Charleston Subdivision 588:(ACL) depot reflects 579: 85:32.87472°N 79.99806°W 1058:at Wikimedia Commons 836:The Post and Courier 584:Opened in 1956, the 586:Atlantic Coast Line 493:. It serves as the 485:transit station in 363:does not stop here 255:52,675 (Amtrak) 167:Southeastern Stages 90:32.87472; -79.99806 81: /  45:General information 707:. Charleston, SC: 624:Clemson University 590:mid-century modern 582: 403:Following station 395:Preceding station 290:Following station 277:Preceding station 53:4565 Gaynor Avenue 1200: 1199: 1054:Media related to 776:on March 27, 2012 475: 474: 471: 470: 444: 443: 440: 439: 367: 366: 204:Other information 1245: 1128: 1122: 1117: 1108: 1101: 1094: 1085: 1084: 1053: 1037: 1036: 1034: 1032: 1021: 1015: 1014: 1012: 1010: 1000: 994: 993: 991: 989: 974: 968: 962: 957: 951: 950: 948: 946: 940: 932: 923: 922: 920: 918: 912: 904: 895: 894: 892: 890: 884: 876: 870: 869: 867: 865: 855: 849: 848: 846: 844: 839:. Charleston, SC 826: 815: 814: 812: 810: 800: 792: 786: 785: 783: 781: 766: 760: 755: 749: 748: 746: 744: 734: 726: 720: 719: 717: 715: 700: 458: 457: 392: 391: 381: 380: 356: 284: 274: 273: 238: 236: 166: 165: 156: 155: 96: 95: 93: 92: 91: 86: 82: 79: 78: 77: 74: 26: 23:North Charleston 16: 15: 1253: 1252: 1248: 1247: 1246: 1244: 1243: 1242: 1203: 1202: 1201: 1196: 1135:Active stations 1130: 1126: 1120: 1115: 1112: 1046: 1041: 1040: 1030: 1028: 1023: 1022: 1018: 1008: 1006: 1002: 1001: 997: 987: 985: 976: 975: 971: 960: 958: 954: 944: 942: 938: 934: 933: 926: 916: 914: 910: 906: 905: 898: 888: 886: 882: 878: 877: 873: 863: 861: 857: 856: 852: 842: 840: 827: 818: 808: 806: 805:. June 16, 2014 798: 794: 793: 789: 779: 777: 768: 767: 763: 756: 752: 742: 740: 732: 728: 727: 723: 713: 711: 701: 692: 687: 670: 633: 574: 522: 463: 436: 416: 386: 385:Former services 354: 338: 325: 303: 234: 232: 170: 89: 87: 83: 80: 75: 72: 70: 68: 67: 58: 54: 38:inter-city rail 29: 28: 27: 24: 22: 12: 11: 5: 1251: 1241: 1240: 1235: 1230: 1225: 1220: 1215: 1198: 1197: 1195: 1194: 1189: 1184: 1179: 1174: 1169: 1164: 1159: 1154: 1149: 1144: 1138: 1136: 1132: 1131: 1127:South Carolina 1111: 1110: 1103: 1096: 1088: 1082: 1081: 1076: 1071: 1066: 1060: 1059: 1045: 1044:External links 1042: 1039: 1038: 1016: 995: 969: 952: 924: 896: 871: 850: 816: 787: 761: 750: 721: 689: 688: 686: 683: 669: 666: 656: 655: 646: 632: 629: 573: 570: 527:Interstate 526 521: 518: 514:common carrier 473: 472: 469: 468: 465: 464: 461: 454: 453: 450: 449: 446: 445: 442: 441: 438: 437: 431: 426: 424: 419: 417: 411: 405: 404: 401: 396: 388: 387: 384: 377: 376: 373: 372: 369: 368: 365: 364: 351: 350: 348: 341: 339: 333: 327: 326: 320: 315: 313: 306: 304: 298: 292: 291: 288: 278: 270: 269: 265: 264: 261: 260: 257: 256: 253: 249: 248: 245: 244: 240: 239: 229: 225: 224: 220: 219: 210: 206: 205: 201: 200: 197: 193: 192: 189: 185: 184: 181: 180:Structure type 177: 176: 172: 171: 169: 168: 160: 149: 147: 143: 142: 139: 135: 134: 131: 127: 126: 120: 116: 115: 110: 106: 105: 102: 98: 97: 65: 61: 60: 51: 47: 46: 42: 41: 31: 30: 21: 20: 19: 9: 6: 4: 3: 2: 1250: 1239: 1236: 1234: 1231: 1229: 1226: 1224: 1221: 1219: 1216: 1214: 1211: 1210: 1208: 1193: 1190: 1188: 1185: 1183: 1180: 1178: 1175: 1173: 1170: 1168: 1165: 1163: 1160: 1158: 1155: 1153: 1150: 1148: 1145: 1143: 1140: 1139: 1137: 1133: 1129: 1123: 1118: 1109: 1104: 1102: 1097: 1095: 1090: 1089: 1086: 1080: 1077: 1075: 1072: 1070: 1067: 1065: 1062: 1061: 1057: 1052: 1048: 1047: 1026: 1020: 1005: 999: 983: 979: 973: 967: 963: 956: 937: 931: 929: 909: 903: 901: 881: 875: 860: 854: 838: 837: 832: 825: 823: 821: 804: 797: 791: 775: 771: 765: 759: 754: 738: 731: 725: 710: 706: 699: 697: 695: 690: 682: 680: 674: 665: 664: 659: 653: 652: 651:Silver Meteor 647: 644: 643: 638: 637: 636: 628: 625: 621: 616: 613: 611: 607: 603: 599: 594: 591: 587: 578: 569: 565: 561: 559: 554: 551: 546: 544: 538: 536: 535:park and ride 532: 528: 517: 515: 512: 511:intercity bus 508: 504: 501:as well as a 500: 496: 492: 491:United States 488: 484: 480: 466: 459: 455: 451: 447: 435: 430: 427: 425: 423: 420: 418: 415: 410: 407: 406: 400: 393: 390: 389: 383: 382: 378: 374: 370: 362: 361: 352: 349: 347: 346: 345:Silver Meteor 342: 340: 337: 332: 329: 328: 324: 319: 314: 312: 311: 307: 305: 302: 297: 294: 293: 287: 283: 275: 271: 266: 262: 258: 254: 250: 246: 241: 230: 226: 221: 218: 214: 211: 207: 202: 198: 194: 190: 186: 182: 178: 173: 161: 159: 151: 150: 148: 146:Bus operators 144: 140: 136: 132: 128: 125: 124:side platform 121: 117: 114: 111: 107: 103: 99: 94: 66: 62: 59:United States 57: 52: 48: 43: 39: 36: 32: 17: 1146: 1029:. Retrieved 1019: 1007:. Retrieved 998: 986:. Retrieved 972: 955: 943:. Retrieved 915:. Retrieved 887:. Retrieved 874: 862:. Retrieved 853: 841:. Retrieved 834: 807:. Retrieved 790: 778:. Retrieved 774:the original 764: 753: 741:. Retrieved 739:. March 2024 724: 712:. Retrieved 675: 671: 662: 660: 657: 649: 640: 634: 617: 614: 595: 583: 566: 562: 555: 547: 539: 523: 503:bus terminus 478: 476: 429:Monks Corner 358: 343: 308: 252:FY 2023 209:Station code 175:Construction 1187:Spartanburg 1031:February 5, 1009:February 4, 988:February 5, 945:February 5, 917:February 4, 889:February 5, 864:February 5, 843:February 5, 809:February 5, 780:February 5, 714:February 4, 663:Charleston. 610:barbed wire 598:segregation 88: / 64:Coordinates 1207:Categories 1177:Greenville 1147:Charleston 685:References 679:accessible 604:to become 483:intermodal 360:Auto Train 243:Passengers 235:2018-12-13 188:Accessible 138:Bus stands 76:79°59′53″W 73:32°52′29″N 1182:Kingstree 422:Main Line 318:Kingstree 196:Architect 119:Platforms 1192:Yemassee 1172:Florence 1157:Columbia 1121:stations 982:Archived 743:June 30, 642:Palmetto 631:Services 505:for the 462:Location 434:Richmond 331:Yemassee 323:New York 310:Palmetto 301:Savannah 296:Yemassee 268:Services 183:At-grade 101:Owned by 50:Location 1162:Denmark 1152:Clemson 966:YouTube 545:(FTA). 520:History 432:toward 412:toward 409:Ravenel 334:toward 321:toward 299:toward 233: ( 223:History 109:Line(s) 40:station 1167:Dillon 1142:Camden 1116:Amtrak 737:Amtrak 668:Layout 495:Amtrak 481:is an 357:  286:Amtrak 228:Opened 213:Amtrak 130:Tracks 35:Amtrak 939:(PDF) 911:(PDF) 883:(PDF) 799:(PDF) 733:(PDF) 537:lot. 414:Tampa 336:Miami 158:CARTA 1033:2019 1011:2019 990:2019 947:2019 919:2019 891:2019 866:2019 845:2019 811:2019 782:2019 745:2024 716:2019 709:WCIV 648:The 639:The 558:NHPA 531:NEPA 477:The 1124:in 964:on 550:CSX 217:CHS 191:Yes 1209:: 927:^ 899:^ 833:. 819:^ 801:. 735:. 693:^ 489:, 215:: 122:1 1107:e 1100:t 1093:v 1035:. 1013:. 992:. 949:. 921:. 893:. 868:. 847:. 813:. 784:. 747:. 718:. 237:) 141:2 133:2

Index

Amtrak
inter-city rail
North Charleston, South Carolina
32°52′29″N 79°59′53″W / 32.87472°N 79.99806°W / 32.87472; -79.99806
Charleston Subdivision
side platform
CARTA
Amtrak
CHS

Amtrak
Yemassee
Savannah
Palmetto
Kingstree
New York
Yemassee
Miami
Silver Meteor
Auto Train
Atlantic Coast Line Railroad
Ravenel
Tampa
Main Line
Monks Corner
Richmond
intermodal
North Charleston, South Carolina
United States
Amtrak

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.